Vulcan Energy Resources Ltd. · ASX:VUL

Vulcan Energy Resources — Corporate Update (October 2026)

32 slides from Vulcan Energy Resources's corporate update, Oct 30, 2026

  1. Slide 1: Corporate Presentation Q4 2026

    Corporate Presentation Q4 2026 ASX/FSE: VUL CLIMATE CHAMPION | DETERMINED | INSPIRING

  2. Slide 2: Disclaimer

    DISCLAIMER IMPORTANT: You must read the following before continuing The information contained in this presentation (Presentation) has been prepared by Vulcan Energy Resources Ltd (Vulcan or the Company). This Presentation is for informational purposes only and is not an offer of securities for sale

  3. Slide 3: Disclaimer (cont)

    DISCLAIMER (CONT) Forward-looking statements. General: This Presentation contains certain forward-looking statements. Often, but not always, forward-looking statements may be identified by the use of forward-looking words such as "may", "will", "expect", "intend", "plan", "estimate", "target", "prop

  4. Slide 4: Disclaimer (cont)

    DISCLAIMER (CONT) Financial data. All monetary values expressed as EUR or € in this Presentation are in Euros, unless stated otherwise. All monetary values expressed as "US$" in this Presentation are in US dollars, unless stated otherwise. The assumed exchange rate to convert Euros into US dollars (

  5. Slide 5: We are Europe's lithium solution

    We are Europe’s lithium solution

  6. Slide 6: Introducing Vulcan

    INTRODUCING VULCAN Integrated lithium chemicals and renewable geothermal energy from the same source, in the same place, across multiple projects Global Significance • Globally significant sub-surface geothermal-lithium brine asset in central Europe • Tier One Resource - 29.8Mt LCE Attractive Costs

  7. Slide 7: Phase One delivers a repeatable development platform for growth

    PHASE ONE DELIVERS A REPEATABLE DEVELOPMENT PLATFORM FOR GROWTH1 Project Lionheart Under Construction Integrated Cost Position Technology Delivery Sustainability World leading integrated geothermal energy and Lowest quartile Bankable inhouse lithium In construction Sustainability driven battery-grad

  8. Slide 8: Corporate Snapshot

    CORPORATE SNAPSHOT Strong institutional shareholder base, aligned strategic partners and compelling value considering lithium peer group and capital invested ASX/FSE Prime Standard VUL Shares on issue ~478m A$ € Market Capitalisation1,2 612m 373m Cash2,3 343.3m 209.4m HOCHTIEF 15.4% Van Eck 5.0% Ban

  9. Slide 9: Team with project delivery track record

    TEAM WITH PROJECT DELIVERY TRACK RECORD Team already in place with technical and finance experience to execute major projects and growth strategy Directors Cris Moreno Felicity Gooding Angus Barker Josephine Bush Dr Heidi Grön Dr Günter Hilken Amanda Lacaze Roberto Gallardo Managing Director Executi

  10. Slide 10: Strong September quarter activity progress

    STRONG SEPTEMBER QUARTER ACTIVITY PROGRESS Lionheart on schedule and within budget. Vulcan progress across construction, operations, growth and funding Highlights Across Key Segments Lionheart continued to de-risk with field development 1 LIONHEART CONSTRUCTION advancing as expected, with matrix re-

  11. Slide 11: Project Lionheart – Integrated renewable energy and lithium

    Project Lionheart – Integrated renewable energy and lithium ASX/FSE: VUL 11

  12. Slide 12: Lionheart Supply Chain

    Lionheart S Frankfurt Hoechst } lithi he Is ons " lithium chemicals Lithium chemical plant Geothermal power plant Lithium extraction plant Well head oF Hot lithium rich brine (for production) _ Cold depleted brine (for reinjection)

  13. Slide 13: Integrated brine-to-battery value chain – already in production

    INTEGRATED BRINE-TO-BATTERY VALUE CHAIN – ALREADY IN PRODUCTION Segment Resource/Drilling Resource/Drilling Geothermal Geothermal&& Lithium Lithium Technology Technology Lithium Lithium Extraction Extraction Chemicals Chemicals TM Operational sites Lithium Rich Brine Production Pipelines & Power Lit

  14. Slide 14: Phase One – Lionheart - the numbers

    Phase One – Lionheart - the numbers1 €1,838m 15.6% €20,456/t LHM Pre-tax NPV8 Pre-tax unlevered IRR Average 10-year LHM realised price Vulcan’s funding package for Lionheart €1,152m 13.7% €566m has reached Financial Close. Post-tax NPV8 Post-tax unlevered IRR Average revenue p.a. Lionheart is now on

  15. Slide 15: Construction progressing to plan

    CONSTRUCTION PROGRESSING TO PLAN Execution plan in motion, activities underway across Lionheart Construction works at the fourth well site First foundation concrete layers for the Lionheart Early bulk earthworks at the Frankfurt lithium chemical geothermal power plant in Landau plant site 15 Converg

  16. Slide 16: Lionheart Targeted Milestones to First Production

    Lionheart Targeted Milestones to First Production Proven ‘demonstration’ 1st new production well Commence civil works Mechanical completion Ramp up of commercial Upstream scale battery grade lithium completed (Jan 26)  at Lithium Chemical at Lithium Extraction & production Field supply chain built

  17. Slide 17: Project Ludwig

    Project Ludwig ASX/FSE: VUL 17

  18. Slide 18: Project Ludwig overview – integrated upstream & downstream

    PROJECT LUDWIG OVERVIEW – INTEGRATED UPSTREAM & DOWNSTREAM Integration of lithium extraction and lithium chemical plants to drive capital efficiency Well Integrated Pipeline & Power Energy Storage Lithium extraction and conversion plant sites (ICPP) up to transfer point (TP) Local heat consumers TM

  19. Slide 19: Integrated lithium plant design

    INTEGRATED LITHIUM PLANT DESIGN Capital efficiencies, engineered into Project Ludwig One integrated site for the entire extraction, conversion and refining process to battery grade product. Conversion to Li2CO3 using simple, industry-standard process and equipment, with integrated heat source. Syner

  20. Slide 20: Lionheart and Ludwig in bottom 10% of global lithium cost curve

    LIONHEART AND LUDWIG IN BOTTOM 10% OF GLOBAL LITHIUM COST CURVE Targeting low-cost production through naturally preheated, low-impurity brine resource and efficient VULSORB® A-DLE technology Global projected 2035 lithium C1 cost curve unweighted supply (US$/t LCE, real 2026 terms)1 25,000 Brine (DLE

  21. Slide 21: Lithium market and offtake

    Lithium market and offtake ASX/FSE: VUL

  22. Slide 22: Supplying the European automotive and battery industries

    SUPPLYING THE EUROPEAN AUTOMOTIVE AND BATTERY INDUSTRIES Lionheart offtake committed for 10 years - contracts reflect ‘bankable’ status and provide downside pricing support1 Offtake terms insulate against short term lithium pricing / market volatility • Low counterparty risk: high quality European-f

  23. Slide 23: Rapid European battery and lithium demand growth

    RAPID EUROPEAN BATTERY AND LITHIUM DEMAND GROWTH Insufficient European supply coupled with EV sales growth and regulation on domestic resilience make Vulcan’s growth plan critical for Europe September 26 YoY growth of New Car Battery electric Plug-in hybrid Global passenger EV sales1 Registrations i

  24. Slide 24: Direct lithium extraction (DLE): the industry choice

    DIRECT LITHIUM EXTRACTION (DLE): THE INDUSTRY CHOICE Big investments in A-DLE – process accounts for >10%1 (and growing fast) of global production with ~30yr track record Vulcan Energy – Market Driven DLE delivers Lowest Cost Nickel-Cobalt-Manganese (NCM) Quartile: Lithium Hydroxide2, ~40% Predomina

  25. Slide 25: Delivery

    Delivery ASX/FSE: VUL 25

  26. Slide 26: Summary: strategy to deliver value and growth

    SUMMARY: STRATEGY TO DELIVER VALUE AND GROWTH1 Supporting the energy transition through the development of low cost lithium production and renewable geothermal energy in Europe Strategic Pillars Maintain Financial Deliver Phase Differentiate Through Deliver on Deliver Growth Sustainability One Lionh

  27. Slide 27: A transformational time for Vulcan

    A TRANSFORMATIONAL TIME FOR VULCAN VUL holds the key to lithium growth in Europe with its repeatable development platform capable of delivering stronger returns and lower capital intensity across future phases Producing & Attractive costs1 Globally significant Outstanding Substantial growth Offtakes

  28. Slide 28: Appendix

    Appendix ASX/FSE: VUL 28

  29. Slide 29: Ludwig PFS: key outcomes cont'd - disclaimers

    LUDWIG PFS: KEY OUTCOMES CONT’D - DISCLAIMERS Note 1: Project Ludwig economic metrics are based on the 2026 Pre-Feasibility Study (PFS) on the assumptions set out in this announcement, while Phase One Lionheart metrics are based on the material assumptions set out or referred to in slide 39 of the i

  30. Slide 30: Global Mineral Resource Statement

    GLOBAL MINERAL RESOURCE STATEMENT Vulcan’s combined Upper Rhine Valley Lithium Brine Measured, Indicated and Inferred Mineral Resource estimates as at September 2026 License Reservoir Classification GRV Avg. NTG Avg. Phie Avg. Li Elemental Li LCE km 3 % % mg/L kt kt MUS, BST, ROT, BM Measured 12 68

  31. Slide 31: Notes to Global Mineral Resource Statement

    NOTES TO GLOBAL MINERAL RESOURCE STATEMENT Note 1: Mineral Resources are not Ore Reserves and do not have demonstrated economic viability. Note 2: The weights are reported in metric tonnes (1,000 kg or 2,204.6 lbs). Numbers may not add up due to rounding of the resource value percentages. Note 3: To

  32. Slide 32: Website: v-er.eu

    Website: v-er.eu ASX/FSE: VUL

Vulcan Energy Resources — Corporate Update (October 2026) on 6ix