  1. Slide 1: Introducing Phase 2: Project Ludwig

    For personal use only ASX/FSE: VUL Introducing Phase 2: Project Ludwig DETERMINED FOR A BETTER TOMORROW CLIMATE CHAMPION | DETERMINED | INSPIRING1 1 FO-0762 V 1

  2. Slide 2: Disclaimer

    DISCLAIMER IMPORTANT: You must read the following before continuing The information contained in this presentation (Presentation) has been prepared by Vulcan Energy Resources Ltd (Vulcan or the Company). This Presentation is for informational purposes only and is not an offer of securities for sale

  3. Slide 3: Disclaimer (cont)

    DISCLAIMER (CONT) Forward-looking statements. General: This Presentation contains certain forward-looking statements. Often, but not always, forward-looking statements may be identified by the use of forward-looking words such as "may", "will", "expect", "intend", "plan", "estimate", "target", "prop

  4. Slide 4: Disclaimer (cont)

    DISCLAIMER (CONT) Financial data. All monetary values expressed as EUR or € in this Presentation are in Euros, unless stated otherwise. All monetary values expressed as "US$" in this Presentation are in US dollars, unless stated otherwise. The assumed exchange rate to convert Euros into US dollars (

  5. Slide 5: Phase One delivers a repeatable development platform for growth

    PHASE ONE DELIVERS A REPEATABLE DEVELOPMENT PLATFORM FOR GROWTH For personal use only Project Lionheart Integrated Cost Position Technology Delivery Sustainability World leading integrated geothermal energy and Lowest quartile Bankable inhouse lithium Funded and in Sustainability driven battery-grad

  6. Slide 6: Introducing Phase Two: Project Ludwig

    Frankfurt Phase 1: Lionheart Downstream INTRODUCING PHASE TWO: PROJECT LUDWIG Lithium hydroxide production Delivering Vulcan’s growth strategy: design one, build many  Globally significant sub-surface geothermal-lithium brine asset. Phase 2: Project Ludwig Tier one resource For personal use only 

  7. Slide 7: Vulcan strategic plan: delivering on our promises and potential

    VULCAN STRATEGIC PLAN: DELIVERING ON OUR PROMISES AND POTENTIAL Lionheart is a blueprint for future phases – Lionheart develops only 15% of resources in the portfolio1 100,000 • Replicating Lionheart for future development phases at lower cost FUTURE PHASES – DESIGN ONE, BUILD MANY2 For personal use

  8. Slide 8: Vulcan's sustainable growth model

    VULCAN’S SUSTAINABLE GROWTH MODEL1 Asset-level financing strategy to grow shareholder value across the Group For personal use only 86%2 Targeting lithium carbonate, Sells lithium hydroxide, renewable heat sales 14% KfW renewable heat & power German Federal Raw Materials Fund2 PFS Released Under Stra

  9. Slide 9: Development building blocks in place for Ludwig success

    DEVELOPMENT BUILDING BLOCKS IN PLACE FOR LUDWIG SUCCESS Blueprint from Phase 1 directly applies to Phase 2 - capitalising on very significant pre-investment, IP, resources and derisking For personal use only  Proprietary, in-house, high-performance A-DLE technology and team  Fully de-risked and de

  10. Slide 10: Project Ludwig – blueprint to drive low operating cost

    PROJECT LUDWIG – BLUEPRINT TO DRIVE LOW OPERATING COST Integrated geothermal and lithium For personal use only production facility 5 x well sites Interconnected pipelines 28 wells Cooled reinjected brine Hot lithium-rich brine

  11. Slide 11: Project Ludwig overview – integrated upstream & downstream

    PROJECT LUDWIG OVERVIEW – INTEGRATED UPSTREAM & DOWNSTREAM Integration of lithium extraction and lithium chemical plants drive capital efficiency Well Integrated Pipeline & Power Energy Storage Lithium extraction and conversion plant sites (ICPP) up to transfer point (TP) For personal use only Local

  12. Slide 12: Sub-surface resource update

    SUB-SURFACE RESOURCE UPDATE5 Phase 2 targets the same Buntsandstein reservoir unit and same field development plan blueprint. For personal use only Project Ludwig production forecast utilises only “Indicated Mineral Resources” with total recovery = 517kt Li₂CO₃(30yrs) 1 Lithium Mineral Resources 202

  13. Slide 13: Integrated lithium plant design

    INTEGRATED LITHIUM PLANT DESIGN Capital efficiencies, engineered into Project Ludwig For personal use only One integrated site for the entire extraction, conversion and refining process to battery grade product. Conversion to Li2CO3 using simple, industry-standard process and equipment, with integra

  14. Slide 14: Project Ludwig PFS numbers

    Project Ludwig PFS numbers5,6 €2,607m1 25.0% €20,588/t LCE Pre-tax NPV8 Pre-tax unlevered IRR Real 2026 €563m For personal use only €1,727m 20.2% Annual average nominal Post-tax NPV8 Post-tax unlevered IRR revenue €4,101/t LCE3 €1,261m2 LCE production cost, 73% CAPEX lowest quartile Average EBITDA m

  15. Slide 15: Ludwig PFS: key outcomes

    LUDWIG PFS: KEY OUTCOMES12 Project Ludwig PFS shows ~ 15% less estimated Capex than Project Lionheart and delivering stronger returns Project Ludwig1,2,3 Lionheart1,2,3 Ludwig indicative comparison to Economic Metrics (€) Product: Lithium Hydroxide Monohydrate Lionheart Doubling annual targeted lith

  16. Slide 16: Ludwig PFS: key outcomes cont'd - slide disclaimers

    LUDWIG PFS: KEY OUTCOMES CONT’D - SLIDE 15 DISCLAIMERS Note 1: Project Ludwig economic metrics are based on the 2026 Pre-Feasibility Study (PFS) on the assumptions set out in this announcement, while Phase One Lionheart metrics are based on the material assumptions set out or referred to in slide 39

  17. Slide 17: Project Ludwig capex summary

    PROJECT LUDWIG CAPEX SUMMARY1 Project Ludwig PFS shows ~15% CAPEX reduction relative to Project Lionheart2 INTEGRATED PROJECT For personal use only ENERGY LITHIUM Geothermal Lithium Extraction Plant Lithium Chemical Plant Interconnected Direct Development Costs Pipelines (16%), €177m Lithium Extract

  18. Slide 18: Lionheart and Ludwig in bottom 10% of global lithium cost curve

    LIONHEART AND LUDWIG IN BOTTOM 10% OF GLOBAL LITHIUM COST CURVE Targeting low-cost production through naturally preheated, low-impurity brine resource and efficient VULSORB® A-DLE technology For personal use only Global projected 2035 lithium C1 cost curve unweighted supply (US$/t LCE, real 2026 ter

  19. Slide 19: Lithium carbonate provides full product suite flexibility

    LITHIUM CARBONATE PROVIDES FULL PRODUCT SUITE FLEXIBILITY A-DLE enables high purity LiCl intermediate, which enables final product flexibility Vulcan Energy – Market Driven Customer need: For personal use only Nickel-Cobalt-Manganese (NCM) Battery Lithium Hydroxide1, ~40% Predominant chemistry for w

  20. Slide 20: Rapid European battery and lithium demand growth

    RAPID EUROPEAN BATTERY AND LITHIUM DEMAND GROWTH Perfect timing for Vulcan with insufficient European supply coupled with EV sales growth and regulation on domestic resilience (‘Made in Europe’) make Vulcan’s growth plan critical for Europe and its investors July 26 YoY growth of New Car Battery ele

  21. Slide 21: Project Ludwig - next steps

    PROJECT LUDWIG - NEXT STEPS PFS Phase 2 PFS (complete) For personal use only Strategic Equity Strategic equity investment partnering process at asset level Seismic Complete 3D seismic acquisition campaign for Project Ludwig area Drilling Complete drilling of first appraisal wells in Project Ludwig a

  22. Slide 22: Summary: strategy to deliver value and growth

    SUMMARY: STRATEGY TO DELIVER VALUE AND GROWTH1 Supporting a low carbon future by producing low cost, sustainable lithium for Europe For personal use only Strategic Pillars Maintain Financial Deliver Phase Differentiate Through Deliver on Deliver Growth Sustainability One Lionheart Strong Sustainabil

  23. Slide 23: Appendix

    For personal use only Appendix ASX/FSE: VUL 23

  24. Slide 24: Project Ludwig PFS key financial assumptions

    PROJECT LUDWIG PFS KEY FINANCIAL ASSUMPTIONS Assumption Units Project Ludwig Lithium Carbonate Price (real 2026) € /t Li₂CO₃ 20,588 For personal use only Long-term Inflation Rate % p. a 2.0 Exchange rate (EUR/USD) - 1/1.15 Discount Rate (nominal) % 8.0 Combined Tax Rate % 25.425 Development CAPEX Co