West Wits Mining Limited · ASX:WWI

West Wits Mining — Spark Plus Metals & Mining Day 2021

22 slides from West Wits Mining's conference presentation, Sep 28, 2021

  1. Slide 1: ASX Announcement and Webinar Invitation

    ASX Announcement and Media Release 28 September 2021 ASX Announcement and Media Release Tuesday, 28 September 2021 For personal use only WWI Investor Presentation and Webinar Invitation West Wits Mining (ASX: WWI, “West Wits” or “the Company”) is pleased to announce its participation in Spark Plus M

  2. Slide 2: ASX Announcement continued

    ASX Announcement and Media Release 28 September 2021 A copy of the investor presentation to be delivered during the webinar is attached. For personal use only Authorised for release by the Company Secretary of the Company. For Further information please contact: Ryan Batros Investor Relations ryan@a

  3. Slide 3: WWI Investor Presentation September 2021

    ABN 89 124 894 060 | A SX : W W I For personal use only Witwatersrand Basin Project (WBP), S.A. WWI Investor Presentation September 2021 Mt Cecelia Project, AUS westwitsmining.com

  4. Slide 4: Disclaimer

    Disclaimer This presentation may contain certain forward-looking statements that have been based on current expectations about future acts, events and circumstances. These forward-looking statements are, however, subject to risks, uncertainties and assumptions that could cause those acts, events and

  5. Slide 5: Investor Snapshot

    Investor Snapshot ASX-listed progressing strategic transformation as mid-tier gold producer in two premier regions For personal use only South Africa, Witwatersrand Western Australia, Eastern Pilbara Witwatersrand Basin Project (WBP) Mt Cecelia Project Significant resource: 3.55Moz JORC Mineral Reso

  6. Slide 6: Company Highlights and Capital Structure

    Company Highlights DFS Results and Maiden Ore Reserve: For personal use only Announced Sep-21: major milestones towards production and catalyst to re-rate WWI Significant growth in share price over past year: underlines WWI’s potential; with market cap of A$70m still significantly below peers Capita

  7. Slide 7: Experienced and Successful Leadership

    Experienced and Successful Leadership Michael Quinert Peter O’Malley For personal use only Chairman Non-Executive Director ASX-experienced commercial lawyer with US-based investment finance executive with wide-ranging experience advising on extensive involvement in assisting and M&A, debt/equity tra

  8. Slide 8: Snapshot

    Witwatersrand Basin Project Snapshot For personal use only Located within world-renowned Witwatersrand Basin (SA) Central Rand historically produced over 247Moz In operation for more than 100 years Low geological risk Historic mine works underground inspection shows stable existing shafts with almos

  9. Slide 9: Five Mining Targets Identified with 3.55Moz resource

    Witwatersrand Basin Project Five Mining Targets Identified with 3.55Moz resource @ 4.26g/t2 For personal use only Bird Reef Central Kimberley Reef East Qala Shallows Qala Deeps Notes: Global MRE set at a 2.0g/t Au cut-off; reported in accordance with JORC Code of 2012; number differences may occur d

  10. Slide 10: Scoping Study: Production Schedule in Five Stages

    Witwatersrand Basin Project Scoping Study: Production Schedule in Five Stages For personal use only Scoping Study’s ROM production schedule in annual Stage 1: Qala Shallows DFS production schedule with ounces of gold by stage over WBP’s 25-year life-of-mine3 significant LOM at 55 000 oz pa1 8

  11. Slide 11: Definitive Feasibility Study

    Definitive Feasibility Study1 Stage 1: Qala Shallows Substantial Maiden Declared ore reserve of 3MT at 2.88g/t for For personal use only Ore Reserve 278 000oz, including Proved Ore Reserve of 830,000t at 3.13g/t for 84,000oz Significant 17-year LOM and 7.3MT at 2.81g/t Life-of-Mine recovered grade f

  12. Slide 12: Qala Shallows Early Works Project

    Witwatersrand Basin Project Qala Shallows Early Works Project | October to December 2021 For personal use only Small mining Bush clearance footprint at and site existing decline preparation Rehabilitation Technical team of old box cut; surveying for decline adit; possible early shafts ore Witwatersr

  13. Slide 13: Uranium Initiative

    Witwatersrand Basin Project Uranium Initiative | Progress to confirmed 12-16 MLbs Uranium target For personal use only Mid-Oct 21 Dec 21 Q3 2022 2023 Exploration & Resource Definition Mining Current position Stage 1 Stage 2 Stage 3 Stage 4 Historical Uranium Exploration Collate additional historical

  14. Slide 14: Mt Cecelia Project Snapshot

    Mt Cecelia Project Snapshot Regional overview of Paterson Province; Mt Cecelia highlighted in red For personal use only Highly prospective Located approx. 70kms west of Rio Tinto’s (RIO) WINU Project RIO to drill neighbouring Baton JV Project9 Rumble Resources Limited (ASX: RTR) advancing Braeside P

  15. Slide 15: Mt Cecelia Project Overview

    Mt Cecelia Project Overview Eight SGC target zones For personal use only HEM survey: MLTEM survey: Significant step eight exploration Top four priority towards maiden target areas with drill targets drilling campaign four deemed (SGC1-4) defined in 2022 field high priority5 season 13

  16. Slide 16: Key Milestones

    Key Milestones WBP: 5-Stage Development For personal use only Witwatersrand Basin Project (WBP) Mt Cecelia Project Mining Right: Stage 1: Stage 1: Stages 2-5: Stages 2-5: Ground EM DRME Approved Declared Ore Reserve Commence Early Commence Definitive Estimated survey results: on DFS completion Works

  17. Slide 17: Corporate Contacts

    For personal use only Corporate Contacts RYAN BATROS WEST WITS MINING LIMITED E info@westwitsmining.com Investor Relations P +61 3 8692 9049 P +61 472 658 777 F +61 3 8692 9040 E ryan@alces.com.au A Level 6, 400 Collins Street, Melbourne, Victoria Australia 3000 15

  18. Slide 18: Appendices

    For personal use only Appendices

  19. Slide 19: Appendix 1: Ore Reserve & Mineral Resource Estimate Statements

    Appendix 1: ORE RESERVE & MINERAL RESOURCE ESTIMATE STATEMENTS Table 1: WBP (JORC) Ore Reserve1 Declared ore reserve of 3MT at 2.88g/t for 278 000oz, including Proved Ore Reserve of 830,000t at 3.13g/t for 84,000oz1 For personal use only Ore Reserve Notes: 1) No Inferred Mineral Resources are includ

  20. Slide 20: Appendix 2: References

    Appendix 2: References 1. The original report was “DFS Delivers Strong Results on 1st Stage of WBP Development” which was issued with consent of Competent Persons Mr. Andrew Pooley. The report For personal use only was released to the ASX on 02 September 2021 and can be found on the Company’s websit

  21. Slide 21: Appendix 3: Forward Looking Statements

    Appendix 3: Forward Looking Statements This Announcement includes “forward-looking statements” as that term within the meaning of securities laws of applicable jurisdictions. Forward-looking statements involve known and unknown risks, uncertainties and other factors that are in some cases beyond Wes

  22. Slide 22: Appendix 4: Fully compliant BEE ownership in SA

    Appendix 4: Fully compliant BEE ownership in SA FULLY COMPLIANT BEE OWNERSHIP West Wits For personal use only Mining Ltd STRUCTURE • South African projects 33.4% owned by Black Equity (ASX: WWI) Empowerment partner, Lilitha Resources (Pty) Ltd. 90% • Surpasses SA’s Mining Charter requirement of 26%