Terramin Australia — Corporate Update (August 2014)
19 slides from Terramin Australia's corporate update, Aug 21, 2014
Slide 1: Strathalbyn Community Consultation Committee Meeting
Strathalbyn Community Consultation Committee Meeting TERRAMIN AUSTRALIA LIMITED 21 August 2014
Slide 2: Angas Mine – SCCC Presentation
Angas Mine – SCCC Presentation Welcome all Current Status – in Care and Maintenance – Maintaining all onsite infrastructure and plant – Monitoring ground conditions and water underground – Ongoing environmental monitoring and management – Sale of redundant equipment Care and Maintenance Plan r
Slide 3: What's happening at Angas Zinc?
What's happening at Angas Zinc? Environment, Community and Water Management staff remain on-site 5 employees on site Clean-up work – steel recycling , rubbish collection and polypipe disposal Auction of surplus mine equipment – past economic repair Water and environmental management/monito
Slide 4: Closure Works to date
Closure Works to date Post closure site contour and drainage design Vegetation identification for TSF capping and seed collection Chemical analysis of TSF – Tails acid test work, AMD test work of underground paste Soil Testing – particle size distribution, Atterberg limits, moisture content,
Slide 5: Planned works to do
Planned works to do Awaiting feedback from DMITRE (O’Kane) on TSF cover works Update Closure Plan in accordance with feedback Update soil surface erosion modeling/boxcut area Groundwater modeling – AGWT reviewing feedback from Government departments TERRAMIN AUSTRALIA LIMITED
Slide 6: Land Management Agreement (LMA)
Land Management Agreement (LMA) Lease Agreement 69 – “The Lessee must ensure that the area of the TSF and a 10m wide buffer on all sides is protected in perpetuity from development that may affect the integrity of the TSF design. This protection must include a caveat on the relevant freehold land
Slide 7: Mining and Underground Management (Quarter 2, 2014)
Mining and Underground Management (Quarter 2, 2014) A total 19,800m3 of water placed underground during the quarter – storm water runoff and bore water injection Water reached the 120m RL in the decline – late April Quarterly ground control inspection UG Water 8.05pH on 29 April 2014 TERRAMI
Slide 8: Bird in Hand Update
Bird in Hand Update Commenced groundwater interaction study Constructed 5 test bores Conducted pump testing Received PEPR approval for Exploration drilling Inferred to indicated In order to bring BiH ore to Angas, the ML 6229 lease conditions need to be varied Next geological samples u
Slide 9: Angas Zinc Mine Quarterly Environment Report
Angas Zinc Mine Quarterly Environment Report Quarter 2: April – June 2014 M. Daniel TERRAMIN AUSTRALIA LIMITED
Slide 10: Care and Maintenance – what's different?
Care and Maintenance – what’s different? This quarter reflects the changing nature of the Environmental Monitoring Plan, as the Angas Zinc Mine transforms from an Operational site into Care and Maintenance. Some monitoring has been based on compliance requirements from the 2012 approved PEPR, wh
Slide 11: Environmental Activities
Environmental Activities TSF tails surface acidity monitoring Weed spraying, erosion management Dust management Technical workshop between O’Kane and URS on phytocap modeling Monitoring water levels in mine decline and in Monitoring bore DH2 Erosion management works TERRAMIN AUSTRALIA LIMI
Slide 12: Underground Mine Void
Underground Mine Void Water was most recently detected in the DH2 bore at 110m, with a pH of 7.55. Recent water results from the mine void do not show any sign of Acid Mine Drainage (AMD). Water was detected in bore DH2 in June, which targets the mine void. The purpose of DH2 is to monitor the
Slide 13: Mine void assay results compared to pre-mining and model predictions
Table 1: Mine void assay results compared to pre-mining and model predictions Water Quality Unit Baseline (pre june? * AMD Model Parameter mining) ponitoring Bore | prediction PH Value pH Unit | 7.1 7.55 3.1 Sulfate as SO4 mg/L 1640 to 2600 1670 5507 Aluminium mg/L <0.01 to 0.02 <0.01 15 Antimony mg
Slide 14: Community Activities, Feedback & Environmental Incidents
Community Activities, Feedback & Environmental Incidents No environmental incidents were recorded during quarter 2 No registered community complaints during quarter 2 Another Strathalbyn Model Aircraft Club aircraft crashed on site. TERRAMIN AUSTRALIA LIMITED
Slide 15: TSF Decant Pond - Surface Area
TSF Decant Pond - Surface Area The TSF Decant pond remains in compliance (<15,000m2) 20th August 2014 TSF Western Wall 20th August 2014 pH meter TERRAMIN AUSTRALIA LIMITED reading
Slide 16: Rainfall (mm) TSF Decant Pond RL
Rainfall (mm) 10.0 20.0 30.0 50.0 60.0 40.0 3/02/2010 3/03/2010 3/04/2010 3/05/2010 3/06/2010 3/07/2010 3/08/2010 3/09/2010 3/10/2010 2010 3/11/2010 3/12/2010 3/01/2011 3/02/2011 3/03/2011 3/04/2011 rain (mm) 3/05/2011 3/06/2011 TERRAMIN AUSTRALIA LIMITED RL – 67.70m on 30th of June 3/07/2011 3/08/2
Slide 17: TSF Water Quality
TSF Water Quality Recent pH level 6.72pH on 20th August 2014 pH continues to be monitored TSF tails surface surveyed for pH on a quarterly basis TERRAMIN AUSTRALIA LIMITED
Slide 18: Upcoming Activities for Q3 2014
Upcoming Activities for Q3 2014 Scrap metal collection – Cape Divine Awaiting final feedback Ongoing TSF monitoring from O’Kane on phytocap and water management modeling report Planting trees in SEB areas Closure Plan updating Ongoing weed and pest management General site dust, water and
Slide 19: Thank you
Thank you And thanks Hans for your contributions TERRAMIN AUSTRALIA LIMITED