Electric Metals USA Limited (TSXV:EML) Drill core

Electric Metals USA Limited

Drill core

ReleaseDateProjectHeadline hole
Nevada Silver Corporation Drills 204 Meters of Silver-Gold at the Corcoran Silver-Gold Project, Nevada, USA
CC21-02 98 g/t Ag over 3.45 m from 73.00 m
CC21-03 10 g/t Ag over 65.82 m from 8.18 m
Jan 18, 2022Corcoran Silver-Gold ProjectCC21-01 19 g/t Ag over 96.00 m from 0 m
Nevada Silver Corporation Hits 3470g/t Silver in Drilling at Its Corcoran Silver-Gold Project, Nevada, USA
CC21-02 94 g/t AgEq over 26.6 m from 98.27 m
CC21-03 10 g/t Ag over 65.82 m from 8.18 m
Jan 12, 2022Its Corcoran Silver-Gold ProjectCC21-01 19 g/t Ag over 96.00 m from 0 m
Nevada Silver Corporation Drills Wide Intersections Of Mineralization at Its Corcoran Silver-Gold Project, Nevada, USA
CC21-04 13 g/t Ag over 142.15 m from 29.85 m
CC21-05 86 g/t Ag over 34.5 m from 57 m
Dec 14, 2021Its Corcoran Silver-Gold ProjectCC21-01 2466 g/t AgEq over 1.33 m from 233.7 m
Liberty Mines Provides Drilling Results Update Including Interception of 3.41% Nickel Over 1.96 Metres at its Hart Project
H-12-30 0.85 % Ni over 0.3 m from 601.4 m
H-12-31A 0.97 % Ni over 0.9 m from 795.6 m
Oct 18, 2012Hart ProjectH-11-29A 0.59 % Ni over 1.5 m from 20.0 m
Liberty Mines Provides Drill Results at Croxall and Groves Projects
CL-11-02 0.92 % Ni over 4.2 m from 47.8 m
CL-11-03 0.50 % Ni over 2.1 m from 73.5 m
Dec 12, 2011Croxall ProjectCL-11-01 0.47 % Ni over 1.4 m from 46.2 m
Liberty Mines Intersects 11.70 Meters Grading 2.10% Nickel, 2.03% Copper and 0.57 G/t Gold on its Groves Project
GR-11-02 0.51 % Ni over 1.40 m from 35.8 m
GR-11-04 0.39 % Ni over 0.50 m from 10.4 m
Oct 25, 2011Groves ProjectGR-11-01 1.09 % Ni over 2.90 m from 38.2 m
Liberty Mines Inc. Expands Nickel Mineralization on Hart East Project
H-11-13 3.15 % Ni over 0.3 m from 57.16 m
H-11-14 0.25 % Ni over 9.2 m from 427.0 m
Sep 20, 2011Hart East ProjectH-11-11 0.82 % Ni over 36.0 m from 335.0 m
Liberty Mines Inc. Intersects 36 meters of 0.82% Nickel 300 meters east of Hart
H-11-02 0.45 % Ni over 2.0 m from 52.0 m
H-11-03 1.36 % Ni over 4.0 m from 57.0 m
May 18, 2011Hart Nickel DepositH-11-01 0.24 % Ni over 12.0 m from 44.0 m