Constantine Metal Resources Ltd (TSXV:CEM) Drill core

Constantine Metal Resources Ltd

Drill core

ReleaseDateProjectHeadline hole
Constantine Intersects 7.08% Zn, 2.10% Cu, 40.57 g/t Ag and 0.42 g/t Au over 6.9 meters in Lower South Wall Zone of the Palmer DepositOct 14, 2021Palmer Joint Venture ProjectCMR19-143B 0.42 g/t Au over 6.9 m from 504.8 m
Constantine Intersects 4.6 Meters of 0.52% Copper and 4.65% Zinc in 335 Meter Step-out on RW Zone at Palmer Project, AlaskaSep 25, 2019Palmer ProjectCMR19-140 0.52 % Cu over 4.6 m from 151.8 m
Constantine Reports Johnson Tract Re-sampling Results of 71.4 Meters Grading 20.70 g/t Gold, 4.85% Zinc and 0.88% Copper and Files Technical Report & Information Material for HighGold Spinout
JM-88-034 20.70 g/t Au over 71.4 m from 246.7 m
JM-93-064 9.00 g/t Au over 33.8 m from 263.7 m
Jun 28, 2019Johnson Tract ProjectJM-82-003 1.63 g/t Au over 23 m from 196 m
Constantine Drills More High-Grade at Nunatak AG Zone Discovery, Palmer Project, Alaska
CMR17-94 0.90 g/t Au over 10.3 m from 93.7 m
CMR17-96 9.88 % Zn over 20.4 m from 128.8 m
Aug 17, 2017Palmer ProjectCMR17-92 0.21 % Cu over 17.8 m from 122.3 m
Constantine Reports Drill Assays for Trapper Gold Project, British Columbia
TG-11-006 0.54 g/t Au over 30.16 m from 9.00 m
TG-11-010 0.35 g/t Au over 20.64 m from 35.05 m
Nov 30, 2011Trapper Gold projectTG-11-005 1.02 g/t Au over 11.96 m from 32.89 m
Constantine Reports Final Drill Results at Munro-Croesus Gold Project, Ontario; (18.79 g/t gold over 4.10 meters including 166.5 g/t gold over 0.40 meters)
MC11-C3 6.46 g/t Au over 0.20 m from 15.90 m
MC11-C4 35.60 g/t Au over 0.20 m from 18.09 m
Sep 20, 2011Munro-Croesus Gold ProjectMC11-C2 4.03 g/t Au over 1.02 m from 15.00 m
CONSTANTINE REPORTS DRILL RESULTS AND NEW DEVELOPMENTS AT THE MUNRO-CROESUS GOLD PROJECT, ONTARIO
MC11-17 9.56 g/t Au over 1.31 m from 210.64 m
MC11-18 1.13 g/t Au over 0.6 m from 14.2 m
Jun 8, 2011Munro-Croesus Gold ProjectMC11-16 4.48 g/t Au over 0.2 m from 207.05 m