Stock listing

TSXV:CEM Constantine Metal Resources Ltd Stock

Follow Constantine Metal Resources Ltd into a list and get an email when it puts out news.

Delisted TSXV:CEM no longer trades. Its last trading date is unknown. Company history and updates stay available on this page.

Ticker
TSXV:CEM
Asset type
Stock
Exchange
TSXV
Currency
CAD

Latest news

All Constantine Metal Resources Ltd news

Constantine Metal Resources Ltd on 6ix

News releases
71 in all · newest Oct 26, 2022 · oldest 2009

Drill core

ReleaseDateProjectHeadline hole
Constantine Intersects 7.08% Zn, 2.10% Cu, 40.57 g/t Ag and 0.42 g/t Au over 6.9 meters in Lower South Wall Zone of the Palmer DepositOct 14, 2021Palmer Joint Venture ProjectCMR19-143B 0.42 g/t Au over 6.9 m from 504.8 m
Constantine Intersects 4.6 Meters of 0.52% Copper and 4.65% Zinc in 335 Meter Step-out on RW Zone at Palmer Project, AlaskaSep 25, 2019Palmer ProjectCMR19-140 0.52 % Cu over 4.6 m from 151.8 m
Constantine Reports Johnson Tract Re-sampling Results of 71.4 Meters Grading 20.70 g/t Gold, 4.85% Zinc and 0.88% Copper and Files Technical Report & Information Material for HighGold Spinout
JM-88-034 20.70 g/t Au over 71.4 m from 246.7 m
JM-93-064 9.00 g/t Au over 33.8 m from 263.7 m
Jun 28, 2019Johnson Tract ProjectJM-82-003 1.63 g/t Au over 23 m from 196 m
Constantine Drills More High-Grade at Nunatak AG Zone Discovery, Palmer Project, Alaska
CMR17-94 0.90 g/t Au over 10.3 m from 93.7 m
CMR17-96 9.88 % Zn over 20.4 m from 128.8 m
Aug 17, 2017Palmer ProjectCMR17-92 0.21 % Cu over 17.8 m from 122.3 m
Constantine Reports Drill Assays for Trapper Gold Project, British Columbia
TG-11-006 0.54 g/t Au over 30.16 m from 9.00 m
TG-11-010 0.35 g/t Au over 20.64 m from 35.05 m
Nov 30, 2011Trapper Gold projectTG-11-005 1.02 g/t Au over 11.96 m from 32.89 m
Constantine Reports Final Drill Results at Munro-Croesus Gold Project, Ontario; (18.79 g/t gold over 4.10 meters including 166.5 g/t gold over 0.40 meters)
MC11-C3 6.46 g/t Au over 0.20 m from 15.90 m
MC11-C4 35.60 g/t Au over 0.20 m from 18.09 m
Sep 20, 2011Munro-Croesus Gold ProjectMC11-C2 4.03 g/t Au over 1.02 m from 15.00 m
CONSTANTINE REPORTS DRILL RESULTS AND NEW DEVELOPMENTS AT THE MUNRO-CROESUS GOLD PROJECT, ONTARIO
MC11-17 9.56 g/t Au over 1.31 m from 210.64 m
MC11-18 1.13 g/t Au over 0.6 m from 14.2 m
Jun 8, 2011Munro-Croesus Gold ProjectMC11-16 4.48 g/t Au over 0.2 m from 207.05 m

Open Drill core

Studies

Open Studies

Properties

PropertyCommoditiesPlaceStageOn 6ixLast news
Palmer Joint Venture Project1 drill releaseOct 14, 2021
Palmer ProjectCopper, Gold, Silver, ZincAlaska, United StatesEconomic study3 studies · 2 drill releasesSep 25, 2019
Johnson Tract Project1 study · 1 drill releaseJun 28, 2019
Trapper Gold projectBritish Columbia, Canada1 drill releaseNov 30, 2011
Munro-Croesus Gold ProjectOntario, Canada2 drill releasesSep 20, 2011

Open Properties

People

6ix reads each seat by machine from the page it links to, and can misread one.

PersonSeat
Brian IrwinUntil Oct 29, 2019 · Past

Open People

Log in to ask 6ix AI your own questions about Constantine Metal Resources Ltd.