Arizona Eagle Mining Corp. (TSXV:AZEM) Drill core
Drill core
| Release | Date | Project | Headline hole |
|---|---|---|---|
| Arizona Eagle Mining Corp. Announces Discovery of Zinc-Silver VMS Mineralization Northeast of McCabe Mine in Drill Intersections Eagle-26-02 5.73 g/t Au over 4.2 m from 402.6 m Eagle-26-02a 1.16 g/t Au over 1.7 m from 375.5 m | Aug 25, 2026 | Eagle Project | Eagle-26-01 2.73 g/t Au over 1.2 m from 355.7 m |
| Arizona Eagle Mining Corp. Announces Discovery in Phase 1 Drilling, Extends Gold Mineralization Northeast of Historic McCabe Gold Mine Eagle 26-02 including and including 5.73 g/t Au over 4.2 m from 402.6 m Eagle 26-02A 1.16 g/t Au over 1.7 m from 375.5 m | May 6, 2026 | Eagle Project | Eagle 26-01 2.73 g/t Au over 1.2 m from 355.7 m |
| Core Nickel Announces Assay Results from Winter Drill Program at Halfway Lake and Provides Update on the Mel Deposit HFW-25-010 0.17 % Ni over 1.0 m from 39.2 m HFW-25-015 0.65 % Ni over 1.1 m from 43.0 m | Jun 12, 2025 | Halfway Lake Project | HFW-25-007 0.80 % Ni over 0.7 m from 72.8 m |