Aton Resources Inc. (TSXV:AAN) Drill core

Aton Resources Inc.

Drill core

ReleaseDateProjectHeadline hole
Aton Reports the First Results from its Abu Marawat RC Infill Drill Programme, Including 17.13 g/t Gold, 307 g/t Silver, 0.82% Copper and 5.50% Zinc Over a 9 Metre Interval
AMP-215 1.82 g/t Au over 2 m from 75 m
AMP-216 5.48 g/t Au over 14 m from 54 m
Mar 26, 2026AMP-214 2.09 g/t Au over 1 m from 69 m
Aton Reports the Continuation of Strong Mineralisation at Depth at the Semna Project, Including 3.65 g/t of Gold Over an Interval of 25 Metres
SMP-082 10.62 g/t Au over 5 m from 128 m
SMP-085 11.92 g/t Au over 3 m from 157 m
Dec 23, 2025Semna ProjectSMP-078 6.22 g/t Au over 3 m from 85 m
Aton Reports Final Results from The Abu Marawat Diamond Drill Programme, Including 39.55 G/T Gold And 161 G/T Silver Over 3.90 Metres from The JVZ Structure, And 9.63 G/T Gold And 86.5 G/T Silver Over 17.70 Metres from the CVZ
AMD-200 8.18 g/t Au over 2.40 m from 68.30 m
AMD-201 161 g/t Ag over 3.90 m from 72.00 m
Oct 2, 2025Abu Marawat depositAMD-102 3.20 g/t Au over 5.00 m from 162.90 m
Aton reports further high grade diamond drilling results from Abu Marawat
AMD-191 44.59 g/t Au over 1.60 m from 10.40 m
AMD-181 5.77 g/t Au over 6.10 m from 54.90 m
Jul 10, 2025Abu Marawat depositAMD-190 33.86 g/t Au over 2.50 m from 151.80 m
Aton Reports Further High Grade Diamond Drilling Results From Abu Marawat, Including 33.86 g/t Gold and 419 g/t Silver Over 2.5 Metres From the Fin Vein, and 44.59 g/t Gold and 103 g/t Silver Over 1.6 Metres From the J Vein
AMD-171 6.33 g/t Au over 2.90 m from 10.90 m
AMD-178 4.50 g/t Au over 6.00 m from 4.10 m
Jul 9, 2025Abu Marawat depositAMD-170 7.32 g/t Au over 4.90 m from 9.00 m
Aton Reports the First Results From Its Phase 3 RC Drilling Programme at the Semna Project, Including 14.33 g/t Au Over an Interval of 9 metres and 10.74 g/t Au Over 6 metres
SMP-051 2.93 g/t Au over 14 m from 35 m
SMP-052 8.66 g/t Au over 7 m from 44 m
Jul 2, 2025Semna ProjectSMP-050 14.33 g/t Au over 9 m from 72 m
Aton Reports Further Diamond Drilling Results From Abu Marawat, Including 8.52 g/t Gold and 88.7 g/t Silver Over 15.4 Metres, and 6.06 g/t Gold and 59.6 g/t Silver Over 17.3 Metres
AMD-147 1.65 g/t Au over 23.50 m from 29.50 m
AMD-148 3.07 g/t Au over 16.50 m from 8.00 m
May 20, 2025Abu Marawat depositAMD-146 59.6 g/t Ag over 17.30 m from 32.80 m
Aton Reports Further Results from the Abu Marawat Diamond Drilling Programme, Including 3.62 g/t Au and 47.2 g/t Ag Over an Interval of 27.60 Metres
AMD-116 2.29 g/t Au over 3.30 m from 37.40 m
AMD-117 6.64 g/t Au over 3.75 m from 55.85 m
Mar 11, 2025Abu Marawat depositAMD-115 1.16 g/t Au over 0.50 m from 39.80 m
Aton Reports the First Results From Its Diamond Drilling Programme at the Abu Marawat Deposit, Including 8.98 g/t Au, 185 g/t Ag, 0.43% Cu and 6.12% Zn Over an Interval of 3.90 Metres
AMD-102 1.57 g/t Au over 2.00 m from 12.30 m
AMD-103 1.10 g/t Au over 2.70 m from 9.60 m
Nov 7, 2024Abu Marawat depositAMD-101 0.34 g/t Au over 2.55 m from 16.95 m
Aton Reports the Results From Its Phase 2 Diamond Drilling Programme at the Semna Gold Mine, Including 11.69 g/t Au and 1.38% Cu over an Interval of 5.19 metres
SMD-023 5.64 g/t Au over 1.80 m from 167.60 m
SMD-024 2.30 g/t Au over 2.35 m from 59.80 m
Jul 4, 2024Semna Gold MineSMD-021 1.29 g/t Au over 3.06 m from 22.74 m
Aton Reports Wide Zones of Surface Mineralisation from Channel Sampling at Semna and Final RC Drill Results from Zeno
ZEP-004 2.96 g/t Au over 1 m from 94 m
ZEP-005 1.09 g/t Au over 1 m from 28 m
Feb 1, 2024Abu Marawat ConcessionZEP-001 1.23 g/t Au over 1 m from 12 m
Aton reports the final RC drill results from its new Semna drill discovery, including 50.07 g/t Au over an interval of 6 metres from drill hole SMP-016
SMP-003 3.47 % Cu over 1 m from 137 m
SMP-018 36.03 g/t Au over 4 m from 61 m
Dec 19, 2023Semna ProjectSMP-016 222 g/t Au over 1 m from 80 m
Aton Reports the Final RC Drill Results from its New Semna Drill Discovery, Including 50.07 g/t Au Over an Interval of 6 Metres from Drill Hole SMP-016
SMP-004 12.45 g/t Au over 2 m from 184 m
SMP-006 14.20 g/t Au over 2 m from 116 m
Dec 18, 2023Semna gold mine prospectSMP-003 28.36 g/t Au over 4 m from 136 m
Aton Drills Further High Grade Gold Mineralisation at Its New Semna Drill Discovery, Including 12.54 g/t Au Over an Interval of 16 Metres, and Doubles the Strike Extent
SMP-018 12.54 g/t Au over 16 m from 60 m
SMP-019 1.69 g/t Au over 20 m from 96 m
Nov 7, 2023Semna ProjectSMP-017 5.19 g/t Au over 16 m from 56 m
Aton Drills High Grade Gold Mineralisation at Semna, Including 14.63 g/t Au over an Interval of 12 metres
SMP-002 0.68 g/t Au over 4 m from 20 m
SMP-003 0.59 g/t Au over 4 m from 28 m
Oct 13, 2023Semna ProjectSMP-001 1.11 g/t Au over 4 m from 28 m
Aton Reports Final Diamond Drill Results from Hamama, Including 4.28 g/t AuEq over an Interval of 20.78m
HAD-042 1.37 g/t Au over 34.80 m from 2.00 m
HAD-043 0.89 g/t Au over 22.80 m from 31.50 m
Apr 26, 2023HamamaHAD-041 1.50 g/t Au over 13.80 m from 2.00 m
Aton Reports Diamond Drill Results from the Hamama East and Central Areas, Including 1.38 g/t Au Equivalent and 8.20% Zn over 22.5m from Surface, and Announces the Issuance of Bonus Warrants and Early Warning Report
HAD-018 0.29 g/t Au over 3.10 m from 29.20 m
HAD-020 0.75 g/t Au over 18.30 m from 11.20 m
Mar 29, 2023HamamaHAD-017 1.20 g/t Au over 15.90 m from 11.00 m
Aton Reports the Final Results From Its Phase 2 Diamond Drilling Programme at Rodruin
ROD-119 0.75 g/t Au over 6.00 m from 63.50 m
ROD-120 0.30 g/t Au over 14.00 m from 0.00 m
Jan 31, 2023Rodruin gold exploration projectROD-118 0.42 g/t Au over 17.30 m from 0.00 m
Aton Announces New Drill Results From Rodruin, Including 7.93 g/t Gold and 55.2 g/t Silver Over 19.28m
ROD-112 0.85 g/t Au over 58.65 m from 107.35 m
ROD-113 0.62 g/t Au over 8.00 m from 39.30 m
Dec 20, 2022Rodruin gold exploration projectROD-111 2.53 g/t Au over 7.45 m from 46.60 m
Aton Announces the Completion of Diamond Drilling at Rodruin, and Further Drill Results
ROD-092 0.34 g/t Au over 33.70 m from 77.50 m
ROD-093 6.9 g/t Ag over 47.80 m from 17.00 m
Dec 13, 2022Rodruin gold exploration projectROD-091 0.47 g/t Au over 18.20 m from 79.00 m
Aton Announces the Final Results from the Resource Infill RC Drilling Programme at Hamama West
HAP-164 1.00 g/t Au over 23 m from 0 m
HAP-166 0.66 g/t Au over 31 m from 0 m
Oct 20, 2022Hamama West gold-silver projectHAP-163 1.43 g/t Au over 20 m from 0 m
Aton Resources announces further results from the resource infill RC drilling programme at Hamama West
HAP-138 1.24 g/t Au over 25 m from 1 m
HAP-141 0.50 g/t Au over 29 m from 11 m
Sep 27, 2022Hamama West gold-silver projectHAP-137 3.71 g/t Au over 12 m from 0 m
Aton Resources announces the first results and completion of the resource infill RC drilling programme at Hamama West
HAP-103 0.55 g/t Au over 4 m from 87 m
HAP-105 1.21 g/t Au over 2 m from 38 m
Aug 26, 2022Hamama West gold-silver projectHAP-101 0.76 g/t Au over 28 m from 68 m
Aton Resources reports further near surface diamond drilling results from Rodruin, including 2.32 g/t gold over 40m
ROD-063 0.79 g/t Au over 38.10 m from 9.45 m
ROD-064 0.51 g/t Au over 11.60 m from 0.00 m
May 3, 2022Rodruin gold exploration projectROD-062 2.32 g/t Au over 40.00 m from 5.20 m
Aton Resources Intersects 1.00 g/t gold over 129.5m at Rodruin, further confirming wide zones of surface mineralisation
ROD-057 0.76 g/t Au over 86.60 m from 12.65 m
ROD-058 0.47 g/t Au over 41.81 m from 23.29 m
Mar 7, 2022Rodruin gold exploration projectROD-056 1.00 g/t Au over 129.50 m from 0.00 m
Aton Resources drills 1.74 g/t gold over 88.25m at Rodruin
ROD-055 1.74 g/t Au over 88.25 m from 25.75 m
Mar 1, 2022Rodruin gold exploration projectROD-054 2.13 g/t Au over 24.20 m from 20.60 m
Aton Resources drills 20m @ 5.36 g/t gold in first drill holes at the Spiral Pit zone at Rodruin, from surface
ROP-020 1.63 g/t Au over 12 m from 4 m
ROP-021 0.66 g/t Au over 8 m from 15 m
Dec 10, 2018ROP-018 6.71 g/t Au over 4 m from 1 m
Aton Resources drills 163m @ 0.90 g/t gold at Rodruin, including 34m @ 1.39 g/t gold and 8.86% zinc from surface
ROP-009 5.70 g/t Au over 4 m from 40 m
ROP-010 0.71 g/t Au over 3 m from 92 m
Nov 12, 2018ROP-008 1.61 g/t Au over 1 m from 0 m
Aton Resources reports results of surface channel sampling from a new mineralised zone at Rodruin, including intersections of 26.3m @ 2.29 g/t and 4.8m @ 12.00 g/t gold
ROC-019 2.29 g/t Au over 26.3 m from 74.2 m
ROC-020 12.00 g/t Au over 4.8 m from 0.0 m
Oct 29, 2018RodruinROC-018 1.25 g/t Au over 58.2 m from 0.0 m
Aton Resources Announces Further Drill Intersections From Rodruin, Including 38m @ 1.84 g/t Gold From Surface
ROP-005 0.78 g/t Au over 4 m from 0 m
ROP-006 1.21 g/t Au over 5 m from 0 m
Oct 16, 2018ROP-004 1.84 g/t Au over 38 m from 0 m
Aton Resources Drills 36M @ 12.47 G/T Gold in First Drill Holes at Rodruin, From 5M Depth
ROP-002 0.90 g/t Au over 59 m from 0 m
ROP-003 12.47 g/t Au over 36 m from 5 m
Oct 1, 2018ROP-001 1.02 g/t Au over 13 m from 10 m
Aton Resources Reports Updated Results of Surface Channel Sampling at Rodruin, Including Mineralised Intersections of 62.6m @ 2.34 g/t Gold, and 64.9m @ 2.29 g/t Gold
ROC-003 2.34 g/t Au over 62.6 m from 0.0 m
ROC-005 2.29 g/t Au over 64.9 m from 0.0 m
Sep 12, 2018RodruinROC-002 2.12 g/t Au over 48.6 m from 0.0 m
AAN Drills High Grades in Primary Sulphides at Hamama West: 43.5 Metres at 2.61 g/t Gold, 150 g/t Ag, 3.70 % Zinc And 0.23 % Copper in Drillhole AHA-58
AHA-27 13.1 g/t Ag over 15.0 m from 0.0 m
AHA-28 8.6 g/t Ag over 13.0 m from 0.0 m
Nov 3, 2015HamamaAHA-058 2.61 g/t Au over 43.5 m from 112.5 m
Alexander Nubia Step-Out Drilling Intersects High-Grade Gold-Silver Mineralization on Gold-Oxide Cap: Aha-46 Returns 19 Metres at 2.46 G/T Gold and 157 G/T Silver (4.73 G/T AuEq.)
AHA-33 0.32 g/t Au over 6.0 m from 5.0 m
AHA-34 1.02 g/t Au over 11.9 m from 2.13 m
Jun 9, 2015AHA-32 0.10 g/t Au over 16.2 m from 18.0 m
Alexander Nubia Drills Multiple Stacked Sheets of Mineralization Within the Gold Oxide Cap of Hamama West: AHA-37 Returns 32.6 Metres at 1.37 g/t Gold and 56.4 g/t Silver (2.18 g/t AuEq.)
AHA-37 1.37 g/t Au over 32.6 m from 0.0 m
AHA-38 2.17 g/t Au over 11.3 m from 0.0 m
May 26, 2015AHA-36 0.32 g/t Au over 6.0 m from 5.0 m
Alexander Nubia Discovers New Zone at Hamama Gold-Rich VMS Project: AHA-31 Returns 88.4 Metres At 1.11 G/T Gold And 118 G/T Silver
AHA-29 0.49 g/t Au over 39 m from 4 m
AHA-30 0.76 g/t Au over 22 m from 0 m
May 12, 2015Hamama Gold-Rich VMS ProjectAHA-31 1.11 g/t Au over 88.4 m from 65.0 m
Alexander Nubia confirms gold-silver mineralization from the deepest drill hole at Hamama, VMS and continues to intersect semi-massive sulphide mineralization:
AHA-13 1.00 g/t Au over 13.4 m from 3 m
AHA-14 0.41 g/t Au over 2.4 m from 72.6 m
Feb 27, 2013Hamama VMS DepositAHA-12 1.11 g/t Au over 14 m from 15 m
Alexander Nubia step-out drilling continues to build on surface trench results and intersects semi-massive sulphide mineralization at depth in the Western VMS Zone at Hamama, Egypt:
AHA-22 0.47 g/t Au over 40.6 m from 72 m
AHA-23 1.1 g/t Au over 66 m from 43 m
Feb 5, 2013Hamama VMS DepositAHA-021 0.93 g/t Au over 75.6 m from 16 m
Alexander Nubia releases drilling results for Hamama VMS, Egypt
AHA-13 1.00 g/t Au over 13.4 m from 3 m
AHA-14 0.41 g/t Au over 2.4 m from 72.6 m
Dec 11, 2012Hamama VMS DepositAHA-12 1.11 g/t Au over 14 m from 15 m
Alexander Nubia Releases Stage 2 Drilling Results for Hamama VMS, Egypt. Confirms Gold Cap Which Includes Hole AHA-15: 39 metres Grading 2.22 g/t Gold and 102.2 g/t Silver or (AuEq 4.13 g/t)
AHA-13 1.00 g/t Au over 13.4 m from 3 m
AHA-15 2.22 g/t Au over 39 m from 0 m
Nov 21, 2012Hamama VMS DepositAHA-12 1.11 g/t Au over 14 m from 15 m
Alexander Nubia Provides an Updated Interpretation of Drill Core, Confirms VMS Intersection, and Outlines the Status of the Current Drilling Program at the Hamama VMS deposit, Egypt.
AHA-4 6.5 % Zn over 14.1 m from 108.0 m
AHA-5 4.71 % Zn over 16.0 m from 127.0 m
Oct 29, 2012Hamama VMS DepositAHA-3 5.1 % Zn over 8.0 m from 89.0 m
Alexander Nubia Confirms Volcanogenic Massive Sulphide Style Mineralization at its Hamama Property
AHA-003 3.03 % Zn over 15 m from 85 m
AHA-004 6.51 % Zn over 14.1 m from 108 m
Feb 16, 2012HamamaAHA-001 0.01 % Zn over 13 m from 29 m
Alexander Nubia Intersects High Grade Mineralization at its Abu Marawat Exploration Project in Egypt
AAM-068 9.20 g/t Au over 7.0 m from 171.0 m
AAM-069 2.76 g/t Au over 3.4 m from 126.0 m
Dec 1, 2011Abu Marawat Exploration ProjectAAM-063 0.39 g/t Au over 2.9 m from 86.0 m
Alexander Nubia Discovers New Mineralization at its Abu Marawat Project in Egypt
AAM - 039 0.06 g/t Au over 1.1 m from 65.7 m
AAM - 042 0.23 g/t Au over 2.0 m from 144.0 m
Sep 26, 2011Abu Marawat depositAAM - 038 0.20 g/t Au over 1.0 m from 46.3 m
Alexander Nubia International Inc. Announces 2010 Year End Audited Financial Results and Updated Assay Results
AAM-002 1.76 g/t Au over 12.2 m from 65.8 m
AAM-003 2.4 g/t Au over 15.8 m from 87.1 m
Apr 18, 2011Abu Marawat ConcessionAAM-001 1.39 g/t Au over 5 m from 52 m
Alexander Nubia Extends Mineralized Envelope 420 Metres Along Strike and Down-Dip Extension of CVZ Vein System by 80 Metres at its Abu Marawat Gold-Polymetallic Property in the Eastern Desert of Egypt.
AAM-001 2.0 g/t Au over 6.0 m from 71.0 m
AAM-003 2.5 g/t Au over 7.3 m from 82.2 m
Mar 30, 2011Abu Marawat Gold-Polymetallic PropertyAAM-007 4.51 g/t Au over 9 m from 89.2 m
Alexander Nubia Intersects 23 Metres of 4.00 Au G/T, 70 Au g/t, 0.55% Cu and 3.23% Zn at its Abu Marawat Gold Polymetallic Property in the Eastern Desert of Egypt
AAM-002 2.04 ppm Au over 6.0 m from 71.0 m
AAM-003 2.50 ppm Au over 17.0 m from 87.1 m
Mar 7, 2011Abu Marawat Gold Polymetallic PropertyAAM-001 1.39 ppm Au over 5.0 m from 52.0 m