Zephyr Energy PLC (SWB:VD5N) Drill core
Drill core
| Release | Date | Project | Headline hole |
|---|---|---|---|
| Diablito Drilling Results DIA 38 6.6 g/t Au over 1.00 m from 97.2 m DIA 39 3.2 g/t Au over 2.35 m from 90.4 m | Sep 4, 2006 | Diablito Mine | DIA 36 3.9 g/t Au over 1.00 m from 92.2 m |