Prosper Gold Corp. (OTC:PGXFF) Drill core
Drill core
| Release | Date | Project | Headline hole |
|---|---|---|---|
| Prosper Gold Reports Drill Results and Prepares IP Survey at Golden Sidewalk Project, Red Lake, ON DD22SK002 3.08 g/t Au over 2.35 m from 16.15 m DD22SK003 1.18 g/t Au over 1.0 m from 33.0 m | Jan 9, 2023 | Golden Sidewalk Project | DD22SK001 0.49 g/t Au over 19.5 m from 35 m |
| Prosper Gold Reports Drill Results and Outlines Additional Targets at Golden Sidewalk Project, Red Lake, ON DD22GC070 1.18 g/t Au over 1.50 m from 33.2 m DD22GC072 8.52 g/t Au over 1.00 m from 162.5 m | May 17, 2022 | Golden Sidewalk Project | DD22GC068 3.13 g/t Au over 5.88 m from 393.65 m |
| Prosper Gold Extends Length of Gold-bearing System at Golden Corridor to 2.8 km, Intercepts Include 22.7 g/t Gold over 0.55 m – Golden Sidewalk Project, Red Lake, ON DD21GC004 2.36 g/t Au over 2.00 m from 362.7 m DD21GC005 5.07 g/t Au over 1.10 m from 272.5 m | Jan 17, 2022 | Golden Sidewalk Project | DD21GC001 1.15 g/t Au over 1.50 m from 46.5 m |
| Prosper Gold Drills 6m of 4.79 g/t Au & 118.4 g/t Ag Currie Project – Matheson, Ontario | Nov 5, 2018 | Currie Project | C001 4.79 g/t Au over 6 m from 177.5 m |