Belmont Resources Inc. (LSX:A2PLWB) Drill core
Drill core
| Release | Date | Project | Headline hole |
|---|---|---|---|
| Longest Intercepts of Copper Mineralisation to Date at Lone Star LS21-002 5.05 % CuEq over 15.5 m from 46.9 m LS21-003 4.35 % CuEq over 5 m from 72.4 m | Apr 1, 2022 | Lone Star | LS21-001 0.75 % CuEq over 9.1 m from 41.5 m |
| 4.9m @ 7.9 g/t Au; 17.7m @ 2.8 g/t Au & 1.6m @ 11.7 g/t Au New High-Grade Gold Zone Identified at Lone Star Project LS21-007 2.8 g/t Au over 17.7 m from 107.9 m *LS21-010 1.0 % Cu over 36.1 m from 7.8 m | Feb 24, 2022 | Lone Star | LS21-006 11.7 g/t Au over 1.6 m from 108.5 m |
| Further Wide Zones of Mineralization Intersected - Lone Star Copper-Gold Project LS21-004 1.20 % Cu over 7.60 m from 7.00 m LS21-008 0.60 % Cu over 17.70 m from 5.50 m | Feb 14, 2022 | Lone Star Copper-Gold Project | LS21-003 4.35 % CuEq over 5.00 m from 72.40 m |
| Belmont and Marquee Announce Drilling Results At The Lone Star Copper-Gold Project Highlighted By 1.3% Copper Over 44.2 Metres LS21-002 3.7 % Cu over 15.5 m from 46.9 m | Jan 6, 2022 | Lone Star Copper-Gold Project | LS21-001 1.3 % Cu over 44.2 m from 65.8 m |
| Belmont Reports 14.66m of 1.78 g/t Au and Assays of up to 9.35 g/t Au from Final Drilling Results, A-J Gold Project, British Columbia AJ21-008 1.19 g/t Au over 3.80 m from 14.63 m AJ21-009 1.78 g/t Au over 14.66 m from 9.63 m | May 20, 2021 | AJ21-007 0.147 g/t Au over 3.05 m from 127.1 m | |
| Belmont Drills 6.32g/t Au over 3.28 metres including 20.5 g/t Au over 0.41 metres AJ21-002 0.103 g/t Au over 2.46 m from 106.82 m AJ21-003 6.319 g/t Au over 3.28 m from 35.16 m | Apr 29, 2021 | AJ21-001 0.148 g/t Au over 1.59 m from 28.51 m | |
| Belmont Reports Drilling to Re-Commence in November on Kibby Property; Assays Define 139 ft. Intersection Averaging 393 ppm from Drill Hole (KB-3) Completed in August at Kibby Basin, Nevada Lithium Project; | Nov 1, 2018 | Kibby Property | KB-3 393 ppm Li over 139 ft from 1389 ft |
| Belmont and MGX Minerals Receive Further Encouraging Assays up to 580 ppm Lithium in Lower Level Samples Between 1270 and 1798 Feet on KB-3 in Kibby Basin, Nevada Lithium Project | Sep 28, 2018 | Kibby Basin | KB-3 386 ppm Li over 3 ft from 1403 ft |