Metal Hawk Ltd. (ASX:MHK) Drill core
Drill core
| Release | Date | Project | Headline hole |
|---|---|---|---|
| 11m @ 48.3g/t Au Confirms New Discovery at the Numbat Shear 26LSRC088 28.5 g/t Au over 4 m from 120 m 26LSRC090 5.7 g/t Au over 27 m from 56 m | Nov 18, 2026 | Leinster South Project | 26LSRC085 48.3 g/t Au over 11 m from 103 m |
| RC Drilling Completed and High-Grade Gold in Numbat Shear 26LSRC075 12.48 ppm Au over 4 m from 43 m 26LSRC076 3.29 ppm Au over 4 m from 19 m | Oct 7, 2026 | Leinster South Project | 26LSRC074 4.23 ppm Au over 3 m from 5 m |
| RC Drilling to Commence at the High-Grade Numbat Lode 26LSRC075 0.56 ppm Au over 4 m from 32 m 26LSRC076 3.29 ppm Au over 4 m from 19 m | Sep 14, 2026 | Leinster South Project | 26LSRC074 4.23 ppm Au over 3 m from 5 m |
| Leinster South Exploration Update 26LSRC065 2.83 ppm Au over 6 m from 32 m 26LSRC066 9.82 ppm Au over 3 m from 32 m | Jun 2, 2026 | Leinster South Project | 26LSRC060 0.83 ppm Au over 4 m from 40 m |
| Diamond Drilling Confirms High Grade Gold at Leinster South LSD003 7.71 g/t Au over 1.7 m from 338.65 m LSD002 15.1 g/t Au over 0.41 m from 92.39 m | Dec 21, 2025 | Leinster South Project | LSD005 15.28 g/t Au over 2.3 m from 28.1 m |