Breakthrough Minerals Limited (ASX:BTM) Drill core

Breakthrough Minerals Limited

Drill core

ReleaseDateProjectHeadline hole
High-Grade Copper-Gold Extends Turpentine
26TUR002 1.03 % Cu over 17 m from 180 m
26TUR003 0.89 % Cu over 19 m from 216 m
Sep 14, 2026North Queensland Copper-Gold Project26TUR001 0.47 % Cu over 31 m from 210 m
High-Grade Copper-Gold Extends Turpentine Mineralisation
26TUR002 1.03 % Cu over 17 m from 180 m
26TUR003 0.89 % Cu over 19 m from 216 m
Aug 31, 2026Turpentine Deposit26TUR001 0.47 % Cu over 31 m from 210 m
High-Grade Copper-Gold Results Confirm Turpentine Extension
26TUR002 2.18 % CuEq over 6 m from 180 m
26TUR003 2.83 % CuEq over 4 m from 222 m
Aug 5, 2026Barbara Copper-Gold Project26TUR001 0.52 % CuEq over 31 m from 210 m
High-Grade Copper in Barbara Confirms Growth Potential
26BAR002 0.52 % Cu over 36 m from 343 m
26BAR003 0.82 % Cu over 18 m from 100 m
Jun 3, 2026Barbara Copper-Gold Project26BAR001 1.34 % Cu over 35 m from 204 m