| Filing | Date | Type | Filed with |
|---|
| J.P. Morgan Appointed to Lead Proposed PID Bond Financing | Nov 22, 2026 | Financing | ASX |
|---|
| Anson Investor Update Webinar Presentation | Nov 18, 2026 | Operations update | ASX |
|---|
| Anson Appoints Chris Moller as Chief Financial Officer | Nov 17, 2026 | Management or board change | ASX |
|---|
| Anson Resources to Hold November Investor Update Webinar | Nov 9, 2026 | Meeting notice | ASX |
|---|
| Iron Removal Pre-treatment Test Succeed on Third Party Brine | Nov 9, 2026 | Operations update | ASX |
|---|
| Quarterly Activities and Cashflow Report | Oct 28, 2026 | Quarterly report | ASX |
|---|
| Quarterly Activities and Cashflow Report | Oct 28, 2026 | Quarterly report | ASX |
|---|
| Anson Resources IMARC 2026 Presentation | Oct 27, 2026 | Operations update | ASX |
|---|
| Letter to Shareholders - AGM | Oct 27, 2026 | Meeting notice | ASX |
|---|
| Notice of Annual General Meeting | Oct 27, 2026 | Meeting notice | ASX |
|---|
| Appendix 3X - Ward Davis | Oct 27, 2026 | Other filings | ASX |
|---|
| Anson Announces Board Planned Board Transition | Oct 27, 2026 | Management or board change | ASX |
|---|
| ASN Submits Utah Public Infrastructure District Application | Oct 25, 2026 | Other filings | ASX |
|---|
| ASN Applies for the State Park Mineral Rights at Green River | Oct 18, 2026 | Operations update | ASX |
|---|
| ASN Applies for the State Park Mineral Rights at Green River | Oct 18, 2026 | Operations update | ASX |
|---|
| Appendix 3Y - Tim Murray | Oct 16, 2026 | Other filings | ASX |
|---|
| Appendix 3Y - Greg Knox | Oct 16, 2026 | Other filings | ASX |
|---|
| Appendix 3Y - Bruce Richardson | Oct 16, 2026 | Other filings | ASX |
|---|
| Notification of cessation of securities - ASN | Oct 16, 2026 | Financing | ASX |
|---|
| Incentives Increase Green River Post-Tax NPV8 to US$1.05B | Oct 6, 2026 | Other filings | ASX |
|---|
| Date of AGM and Closing Date for Director Nominations | Oct 1, 2026 | Meeting notice | ASX |
|---|
| Appendix 4G and Corporate Governance Statement | Sep 30, 2026 | Other filings | ASX |
|---|
| Annual Report to Shareholders | Sep 30, 2026 | Annual report | ASX |
|---|
| Application for Additional State Mineral Rights Approved | Sep 28, 2026 | Other filings | ASX |
|---|
| Strategic Offtake and Financing MoU with Wogen and Xcelsior | Sep 20, 2026 | Acquisition or disposal | ASX |
|---|
| Completion of Environmental Study at Yellow Cat | Sep 17, 2026 | Operations update | ASX |
|---|
| Replacement Announcement - $212 mill Additional Tax Credit | Sep 10, 2026 | Other filings | ASX |
|---|
| Anson Receives $212M Additional Tax Credit from Utah | Sep 10, 2026 | Other filings | ASX |
|---|
| ASN Receives $193M Incentive from Utah Inland Port Authority | Sep 3, 2026 | Operations update | ASX |
|---|
| Anson's Chief Financial Officer Resigns | Aug 31, 2026 | Management or board change | ASX |
|---|
| Anson Applies for Patents for Removal of Fe in Li Rich Brine | Aug 30, 2026 | Operations update | ASX |
|---|
| Issue of Shares and Cleansing Notice | Aug 28, 2026 | Financing | ASX |
|---|
| Application for quotation of securities - ASN | Aug 28, 2026 | Financing | ASX |
|---|
| Notification of cessation of securities - ASN | Aug 28, 2026 | Financing | ASX |
|---|
| Anson Exceeds EV Battery Grade Lithium Carbonate Standard | Aug 27, 2026 | Operations update | ASX |
|---|
| Yellow Cat Drilling Confirms Mineralisation Along Strike | Aug 24, 2026 | Operations update | ASX |
|---|
| Ceasing to be a substantial holder | Aug 17, 2026 | Ownership change notice | ASX |
|---|
| Results of General Meeting | Aug 14, 2026 | Meeting outcome | ASX |
|---|
| Critical Minerals Energy Transition Conference Presentation | Aug 11, 2026 | Operations update | ASX |
|---|
| Basis of Valuation of PRs Proposed to be Issued at EGM | Aug 6, 2026 | Other filings | ASX |
|---|
| Utah Backs Green River with Potential US$357.7 M Incentive | Aug 4, 2026 | Operations update | ASX |
|---|
| Webinar Presentation | Aug 3, 2026 | Other filings | ASX |
|---|
| Anson Wins Bid for FFSL Mineral Rights at Green River | Aug 2, 2026 | Acquisition or disposal | ASX |
|---|
| Green River Advances with Successful Downstream Test Work | Jul 30, 2026 | Operations update | ASX |
|---|
| Investor Webinar | Jul 29, 2026 | Other filings | ASX |
|---|
| Quarterly Activities and Cashflow Report | Jul 29, 2026 | Quarterly report | ASX |
|---|
| Anson to Conduct Western Block Exploration at Yellow Cat | Jul 28, 2026 | Operations update | ASX |
|---|
| Anson Seeks to Increase the Mineral Rights at Green River | Jul 26, 2026 | Acquisition or disposal | ASX |
|---|
| First Tranche Payment from POSCO Holdings | Jul 21, 2026 | Acquisition or disposal | ASX |
|---|
| Anson Applies for Additional SITLA Mineral Rights | Jul 15, 2026 | Operations update | ASX |
|---|
| Approval for Small Scale Mining Operation Application at GR | Jul 9, 2026 | Other filings | ASX |
|---|
| Anson Green River Lithium Project Engineering Study Update | Jul 8, 2026 | Operations update | ASX |
|---|
| Secures Strong Support from US Congress Reps for DoE Grants | Jul 6, 2026 | Operations update | ASX |
|---|
| Appoints Baker Hughes to Complete Green River Engineering | Jun 22, 2026 | Operations update | ASX |
|---|
| Anson and POSCO Sign Binding Agreement for DLE Demo Plant | Jun 10, 2026 | Operations update | ASX |
|---|
| Engineering Study Confirms Green River as Low-Cost Producer | May 19, 2026 | Operations update | ASX |
|---|
| POSCO Approves Agreement for DLE Demo Plant at Green River | May 13, 2026 | Material contract | ASX |
|---|
| A1 Lithium Admitted to US Defense Industrial Base Consortium | May 10, 2026 | Other filings | ASX |
|---|
| Anson Upgrades Green River JORC Resource Estimate by 650% | May 3, 2026 | Operations update | ASX |
|---|
| Updated Notice of Intent for Small Mining Operations for GR | Apr 20, 2026 | Operations update | ASX |
|---|
| Diamond Core Records Higher Effective Porosity at GR | Apr 19, 2026 | Other filings | ASX |
|---|
| Drilling Fluid from Mt Fuel-Skyline Tested Significant Li | Apr 12, 2026 | Operations update | ASX |
|---|
| Anson Completes Yellow Cat Drilling | Apr 7, 2026 | Operations update | ASX |
|---|
| Update on Cooperation between Anson and POSCO Holdings | Mar 31, 2026 | Operations update | ASX |
|---|
| Drilling Commenced AlongStrike YellowCat Historical Resource | Mar 23, 2026 | Operations update | ASX |
|---|
| ASN to Commence Yellow Cat Drilling to Extend Mineralisation | Feb 15, 2026 | Operations update | ASX |
|---|
| Anson Intersects Mississippian Horizon at Mt Fuel Well | Feb 5, 2026 | Operations update | ASX |
|---|
| High Concentration Lithium Chloride Sample to Nusano | Feb 4, 2026 | Operations update | ASX |
|---|
| Yellow Cat U-V Project Contains a Historical Resource | Feb 3, 2026 | Operations update | ASX |
|---|
| Quarterly Activities and Cashflow Report | Jan 29, 2026 | Quarterly report | ASX |
|---|
| Receives Approval of Revised Program at Mt Fuel-Skyline | Dec 16, 2025 | Operations update | ASX |
|---|
| ASN Signs MoU Lithium Chloride Offtake Agreement with Nusano | Dec 7, 2025 | Acquisition or disposal | ASX |
|---|
| Anson Successfully Raises A$14m to Advance Green River | Nov 20, 2025 | Financing | ASX |
|---|
| Trading Halt | Nov 18, 2025 | Trading halt or suspension | ASX |
|---|
| Anson Commences Re-entry at Mt Fuel-Skyline Geyser Well | Oct 20, 2025 | Other filings | ASX |
|---|
| Definitive Offtake Agreement with LG Energy Solution | Sep 23, 2025 | Material contract | ASX |
|---|
| Drillpad Earthworks at Mt Fuel-Skyline Geyser Well | Sep 7, 2025 | Operations update | ASX |
|---|
| Anson Submits APD for a Production Scale Disposal Well at GR | Aug 31, 2025 | Operations update | ASX |
|---|
| Anson to Conduct Test Work on Green River Diamond Core | Aug 25, 2025 | Operations update | ASX |
|---|
| Anson Placement to Advance the Green River Lithium Project | Aug 18, 2025 | Financing | ASX |
|---|
| Pause in Trading | Aug 15, 2025 | Trading halt or suspension | ASX |
|---|
| Bosydaba Flow Rate Meets Demonstration DLE Plant Requirement | Aug 7, 2025 | Other filings | ASX |
|---|
| Anson Successfully Polishes Green River Lithium Chloride | Jul 16, 2025 | Operations update | ASX |
|---|
| Bulk Green River Brine Shipment to POSCO in Korea | Jul 13, 2025 | Other filings | ASX |
|---|
| Anson Adds Strategic Claims at Green River Lithium Project | Jul 6, 2025 | Operations update | ASX |
|---|
| MoU with POSCO Holdings for DLE Demonstration Plant at GR | Jun 29, 2025 | Operations update | ASX |
|---|
| Static and Dynamic Petrel Model for Green River | Jun 19, 2025 | Other filings | ASX |
|---|
| 44% Higher Li Values at Green River after Aquifers Open Up | Jun 16, 2025 | Operations update | ASX |
|---|
| Maiden JORC Mineral Resources at Green River Lithium Project | Jun 10, 2025 | Operations update | ASX |
|---|
| Anson Successfully Negotiates Lower Royalty for Green River | May 18, 2025 | Other filings | ASX |
|---|
| Mt Fuel-Skyline Geyser Well Re-entry Approved by Utah Gov | May 14, 2025 | Operations update | ASX |
|---|
| Application to Re-enter Mt Fuel-Skyline Geyser Well Approved | May 11, 2025 | Operations update | ASX |
|---|
| Anson Applies to re-enter the Mt Fuel-Skyline Geyser Well | Apr 28, 2025 | Other filings | ASX |
|---|
| Downstream Polishing of Green River Lithium Chloride | Apr 9, 2025 | Operations update | ASX |
|---|
| Green River DLE Pilot Delivering Industry Leading Results | Mar 24, 2025 | Operations update | ASX |
|---|
| S&P DJI Announces March 2025 Quarterly Rebalance | Mar 7, 2025 | Other filings | ASX |
|---|
| Anson Receives Approval for Yellow Cat Exploration Drilling | Jan 5, 2025 | Operations update | ASX |
|---|
| Chemical Free Testwork Successfully Remove Iron from Brine | Nov 26, 2024 | Operations update | ASX |
|---|
| 2nd Geotech Engineering Survey for Green River DFS Completed | Oct 21, 2024 | Operations update | ASX |
|---|
| Completion of Oversubscribed Share Purchase Plan | Oct 16, 2024 | Financing | ASX |
|---|
| New Approval for Resource Expansion Drilling at Paradox | Oct 2, 2024 | Operations update | ASX |
|---|
| Anson Estimates a Zn-Pb-Ag Resource at the Surprise Deposit | Sep 30, 2024 | Other filings | ASX |
|---|
| US$330M Letter of Interest from Export-Import Bank of the US | Sep 23, 2024 | Financing | ASX |
|---|
| Anson Granted SITLA Blocks at Green River Lithium Project | Sep 22, 2024 | Operations update | ASX |
|---|
| $5 million Placement to advance the Green River Project | Sep 20, 2024 | Financing | ASX |
|---|
| State of Utah Re-Confirms Green River Brine Extraction Right | Sep 13, 2024 | Operations update | ASX |
|---|
| Anson Submits Notice of Intent to Drill at Yellow Cat | Aug 27, 2024 | Operations update | ASX |
|---|
| Underground Injection Control Permit Granted at Green River | Aug 25, 2024 | Operations update | ASX |
|---|
| Additional High Grade Critical Minerals Assays at Ajana | Aug 18, 2024 | Operations update | ASX |
|---|
| Drilling Programs at Mary Springs for Pb & Critical Minerals | Jul 21, 2024 | Operations update | ASX |
|---|
| Elevated Lithium Values in Brine Samples at Green River | Jul 17, 2024 | Operations update | ASX |
|---|
| Opportunity to Develop Critical Minerals at Mary Spring | Jul 15, 2024 | Other filings | ASX |
|---|
| Response to ASX Price Query | Jul 11, 2024 | Explanation request | ASX |
|---|
| Koch Technology Solutions Pilot Unit Delivered to GreenRiver | Jun 30, 2024 | Operations update | ASX |
|---|
| Anson and Koch Collaborate on Pilot Testing at Green River | Jun 24, 2024 | Operations update | ASX |
|---|
| Anson Pegs Strategic Tenement at its Ajana Project | Jun 10, 2024 | Operations update | ASX |
|---|
| Additional High Grade Critical Mineral Prospects at Ajana | Jun 4, 2024 | Operations update | ASX |
|---|
| Anson Discovers High-Grade Critical Minerals at Ajana | May 30, 2024 | Operations update | ASX |
|---|
| High Quality Li Assays from the Thick Mississippian Units | May 19, 2024 | Operations update | ASX |
|---|
| Approval from State of Utah for Brine Extraction -GreenRiver | May 7, 2024 | Operations update | ASX |
|---|
| Binding Offtake Term Sheet with LG Energy Solution | Apr 30, 2024 | Acquisition or disposal | ASX |
|---|
| Anson Extracts Brine from Mississippian Units at Green River | Apr 29, 2024 | Other filings | ASX |
|---|
| Completes Drilling of Bosydaba 1 Well to a Depth of 3,417m | Apr 21, 2024 | Operations update | ASX |
|---|
| Surveys Completed for Exploration to Commence at Yellow Cat | Apr 16, 2024 | Operations update | ASX |
|---|
| Successful Completion of Green River Sample Demo Plant | Apr 14, 2024 | Operations update | ASX |
|---|
| Green River Clastic Zones Deeper and Thicker than Paradox | Apr 3, 2024 | Other filings | ASX |
|---|
| Exceptional High-Grade Zn, Pb and Ag Mineralisation at Ajana | Mar 25, 2024 | Other filings | ASX |
|---|
| No Interconnectivity Btw Clastic Zones and Shallow Aquifers | Mar 11, 2024 | Operations update | ASX |
|---|
| Anson Continues Deep Drilling at Green River Lithium Project | Feb 27, 2024 | Operations update | ASX |
|---|
| Significant Assay Results Confirm Ni-Cr-Cu at Hooley Well | Feb 25, 2024 | Operations update | ASX |
|---|
| Anson Commences Mineral Resource Drilling at Green River | Feb 21, 2024 | Operations update | ASX |
|---|
| Drilling Intersects High Grade Zinc, Lead & Silver at Ajana | Feb 19, 2024 | Operations update | ASX |
|---|
| Site Works Underway for Drilling Program at Green River | Feb 11, 2024 | Operations update | ASX |
|---|
| Approvals Granted for Resource Drilling at Green River | Feb 4, 2024 | Operations update | ASX |
|---|
| Geotech Confirms Suitability for Processing Plant at Paradox | Jan 25, 2024 | Operations update | ASX |
|---|
| Conditional Use Permit Granted for Drilling at Green River | Jan 23, 2024 | Operations update | ASX |
|---|
| Commence of Demonstration Plant Construction at Green River | Nov 23, 2023 | Operations update | ASX |
|---|
| Widespread Pegmatites Discovered at Hooley Well Project | Nov 5, 2023 | Operations update | ASX |
|---|
| Anson Commences Ajana Base & Precious Metals Drilling | Nov 2, 2023 | Operations update | ASX |
|---|
| Updated Quarterly Activities and Cashflow Report | Oct 30, 2023 | Quarterly report | ASX |
|---|
| Anson to Fast Track Drilling Program at Yellow Cat | Oct 22, 2023 | Operations update | ASX |
|---|
| Geotech Program to Confirm Processing Plant Site at Paradox | Oct 18, 2023 | Operations update | ASX |
|---|
| Major Mineral Resource Upgrade at Paradox Lithium Project | Oct 15, 2023 | Operations update | ASX |
|---|
| Multiple Large REE Anomalies Identified at Hooley Well | Oct 10, 2023 | Operations update | ASX |
|---|
| Anson Confirms Site for Processing Plant at Green River | Oct 5, 2023 | Other filings | ASX |
|---|
| Plans for New JORC Resource Drilling Program at Green River | Oct 1, 2023 | Operations update | ASX |
|---|
| Anson to Target Ni-Cu-PGE Anomalies at Hooley Well Project | Sep 27, 2023 | Operations update | ASX |
|---|
| Proposal to Sample Historical Well to Test Green River Brine | Sep 25, 2023 | Other filings | ASX |
|---|
| Outstanding Geological Prospectivity at Green River Project | Sep 20, 2023 | Other filings | ASX |
|---|
| Anson Ramps-up Lithium Carbonate Production at Dem Plant | Sep 14, 2023 | Operations update | ASX |
|---|
| Anson Completes Acquisition of Strategic Land at Green River | Sep 12, 2023 | Acquisition or disposal | ASX |
|---|
| Groundwater Flow Model Confirms Pressure Remain Constant | Aug 6, 2023 | Operations update | ASX |
|---|
| First Lithium Carbonate Produced from Brines from Paradox | Aug 1, 2023 | Operations update | ASX |
|---|
| Anson Receives Key Air Quality Approval for Paradox Lithium | Jul 31, 2023 | Operations update | ASX |
|---|
| Anson Completes 3D Geological Model at Paradox Basin | Jul 19, 2023 | Operations update | ASX |
|---|
| Anson to Acquire Strategic Lithium Project in Paradox Basin | Jul 18, 2023 | Acquisition or disposal | ASX |
|---|
| Anson Commences Geotechnical Study at Green River | May 28, 2023 | Operations update | ASX |
|---|
| Paradox Lithium Plant Front End Engineering & Design Study | May 24, 2023 | Operations update | ASX |
|---|
| Anson to Acquire Land for Green River Li Processing Plant | May 22, 2023 | Acquisition or disposal | ASX |
|---|
| Strategic Expansion of Paradox Lithium Project | May 10, 2023 | Operations update | ASX |
|---|
| Positive Federal State from Site Inspection of Drill Sites | May 7, 2023 | Operations update | ASX |
|---|
| Site Works Underway for Western Strategy Drilling at Paradox | May 3, 2023 | Operations update | ASX |
|---|
| Approvals Received for Western Strategy Resource Drilling | Mar 21, 2023 | Operations update | ASX |
|---|
| Resource Definition Drilling to Commence at Green River | Mar 12, 2023 | Operations update | ASX |
|---|
| Artesian Brine Flow from Depth to Surface at Green River | Mar 5, 2023 | Operations update | ASX |
|---|
| S&P DJI Announces March 2023 Quarterly Rebalance | Mar 3, 2023 | Other filings | ASX |
|---|
| Suitability of Colorado River Water for DLE Process | Feb 21, 2023 | Operations update | ASX |
|---|
| Anson Delivers Positive Hydro Power Study at Paradox Project | Feb 20, 2023 | Other filings | ASX |
|---|
| Exploration Target Confirmed at Green River Lithium Project | Feb 14, 2023 | Other filings | ASX |
|---|
| Successful DLE Results on Mississippian Brines at Paradox | Feb 13, 2023 | Operations update | ASX |
|---|
| Anson Stakes Major New Strategic Lithium Brine Project | Jan 29, 2023 | Operations update | ASX |
|---|
| Western Strategy Resource Expansion Drilling to Commence | Jan 24, 2023 | Operations update | ASX |
|---|
| Major Project Milestone - Water Rights Secured for Paradox | Jan 22, 2023 | Operations update | ASX |
|---|
| Update on Exploration Programs for Lithium and REE | Dec 5, 2022 | Other filings | ASX |
|---|
| Anson Delivers 1Mt LCE Mineral Resource at Paradox | Nov 1, 2022 | Operations update | ASX |
|---|
| 25% Increase in Li Grade in Mississippian Unit at Cane Creek | Oct 9, 2022 | Other filings | ASX |
|---|
| Approval for Western Strategy Resource Expansion Drilling | Oct 4, 2022 | Operations update | ASX |
|---|
| New Lithium-Rich Horizons Discovered at Cane Creek 32-1 Well | Sep 28, 2022 | Operations update | ASX |
|---|
| Successful $50M Placement to Accelerate Paradox Development | Sep 16, 2022 | Financing | ASX |
|---|
| Cane Creek 32-1 Initial Assay Results Confirm Li Rich Brine | Sep 14, 2022 | Operations update | ASX |
|---|
| Paradox Lithium Project DFS Confirms Outstanding Economics | Sep 7, 2022 | Results | ASX |
|---|
| MOU with DLE Leader Sunresin to Develop Commercial Li Plant | Aug 25, 2022 | Operations update | ASX |
|---|
| Anson Reports Major Resource Upgrade at Paradox | Aug 21, 2022 | Operations update | ASX |
|---|
| Anson Targets New Zones in Drilling at Paradox | Aug 14, 2022 | Operations update | ASX |
|---|
| Resource Expansion Potential of New Western Expansion Claims | Aug 8, 2022 | Operations update | ASX |
|---|
| Further Increases in Lithium Grades at Paradox Project | Aug 3, 2022 | Other filings | ASX |
|---|
| Further 87% Increase in Li Grades of Mississippian Units | Jul 26, 2022 | Operations update | ASX |
|---|
| Further Strategic Expansion of Paradox Lithium Project Area | Jul 24, 2022 | Operations update | ASX |
|---|
| Additional High Lithium Results in Drilling at Paradox | Jul 17, 2022 | Operations update | ASX |
|---|
| Flow Rates Increase by More Than 140% in Drilling at Paradox | Jul 12, 2022 | Operations update | ASX |
|---|
| Mississippian Unit at LC2 Delivers 25% Increase in Lithium | Jul 10, 2022 | Operations update | ASX |
|---|
| Test on Historic Diamond Core to Fast Track Resource Upgrade | Jul 5, 2022 | Operations update | ASX |
|---|
| Anson Completes Drilling at Long Canyon No.2 | Jul 3, 2022 | Operations update | ASX |
|---|
| DFS Targeting Production Capacity of 10,000tpa Li2CO3 | Jun 5, 2022 | Operations update | ASX |
|---|
| Anson Takes First Brine Sample from Mississippian Unit | Jun 1, 2022 | Operations update | ASX |
|---|
| Approvals Granted for Next Phase Resource Expansion Drilling | May 31, 2022 | Operations update | ASX |
|---|
| High Pressure & Increased Flow Rates at Long Canyon Unit 2 | May 29, 2022 | Operations update | ASX |
|---|
| Anson Achieves First Mississippian Mineral-Rich Brine Flow | May 25, 2022 | Operations update | ASX |
|---|
| Resource Expansion Drilling Program Update | May 22, 2022 | Operations update | ASX |
|---|
| Updated MOU with TETRA Technologies for Paradox Lithium | Apr 5, 2022 | Material contract | ASX |
|---|
This page holds 200 of 431 filings.