Anson Green River Lithium Project Engineering Study Update
Filed with ASX · · 2 pages · English
Summary by 6ix AI
The study is being coordinated by Sedgman and aims to integrate various components of the project, including extraction and processing. An in-person meeting was held in Las Vegas with key stakeholders to discuss the next steps, and the study is expected to be completed by January of the following year. This announcement has been authorized by the Executive Chairman of Anson Resources Limited.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Anson Resources Limited on 6ix
Story so far
Earlier from Anson Resources
- Secures Strong Support from US Congress Reps for DoE Grants
- Appoints Baker Hughes to Complete Green River Engineering
- Anson and POSCO Sign Binding Agreement for DLE Demo Plant
- Engineering Study Confirms Green River as Low-Cost Producer
- Anson Resources Engineering Study Confirms Green River as a Future Low-Cost Producer
Later from Anson Resources
- Approval for Small Scale Mining Operation Application at GR
- Anson Applies for Additional SITLA Mineral Rights
- First Tranche Payment from POSCO Holdings
- Anson Seeks to Increase the Mineral Rights at Green River
- Anson to Conduct Western Block Exploration at Yellow Cat
Follow Anson Resources into a list and get an email when it puts out news.
Follow Anson Resources