6 March 2024
Kavango Resources
("Kavango" or "the Company")
Zim: Maiden 5,860/oz Indicated Gold Resource
Kavango Resources plc (LSE:KAV), the Southern Africa focussed metals explorer, is pleased to announce that it has received a maiden Resource Estimate (the "Resource Estimate") for the largest tailings dump at the Nara Gold Project ("Nara") in Zimbabwe.
The Resource Estimate highlights the potential for the tailings dump to provide Kavango with a significant near-term source of gold production and early, non-dilutive free cash flow.
HIGHLIGHTS
- The Resource Estimate concludes that the two Nara tailings dumps tested together contain:
- An Indicated Mineral Resource of 293,000 tonnes ("t") at an average of 0.62 grams per tonne ("g/t") gold, for a total of 5,860 ounces gold contained.
- An inferred resource of 11,900t at 0.66g/t gold, for a total of 253 ounces gold contained.
- Some 96% of the Mineral Resource has been categorised as Indicated thus placing it into a relatively high resource category for the early stage of the project, demonstrating confidence in the continuity of the material.
- Future extraction costs will be operational, with no mining required.
- The Mineral Resource Estimate also identified upside potential at the tailings dump, highlighting the opportunity to increase tonnage at as-yet-untested depths.
- Kavango is now assessing options to commercialise the gold in the Nara tailings dump.
- The Company plans to use free cash flow generated by any tailings production to advance its wider exploration activities targeting large-scale, bulk-mineable metal deposit discoveries in Zimbabwe.
Kavango currently has an exclusive 2-year option to buy Nara (announced >>> 26 June 2023).
Ben Turney, Chief Executive of Kavango Resources, commented:
"This Maiden Resource Estimate for gold for the Nara tailings dumps is the first Mineral Resource Estimate Kavango has delivered.
It's a milestone moment for our company and reflects the speed at which we are growing in Zimbabwe.
Given that this is a tailings dump, all material has already been mined and there are no further mining costs. The Resource Estimate and high resource category achieved underline the commercial potential at Nara.
While our primary objective is to discover larger-scale, bulk minable gold deposits, the 6,000 ounces of gold in the main tailings dump present an early opportunity for commercialising this project.
The free cash flow we could generate from processing the gold in the Nara tailings can help fund both our development of this project and our wider exploration across Zimbabwe's highly prospective, under-explored greenstone belts.
We will now commence metallurgical test work to optimise plant design to enable future gold production."
Background
Kavango signed an exclusive two-year option to acquire the Nara Gold Project in June 2023 (announced >>> 26 June 2023).
Nara covers four historic mines with total recorded production of more than 90,000oz in the first half of the 20th Century. These mines also produced credits of tungsten and silver. There is a 30-year plus history of small-scale mining & custom milling on the property.
No drilling or modern exploration has been carried out to assess the >4km of strike potential at Nara, meaning that longer term there is significant potential for Kavango to explore for hard-rock resources, and for which it is ultimately targeting >1 million oz. gold potential.
Near-term cash flow potential also exists at Nara within the project's historical tailings dumps. These are the focus of the current resource estimate.
In Q4 2023, Kavango engaged a contractor to carry out auger sampling on two of the tailings dumps at Nara. Each hole was drilled using an engine-driven hydraulic auger with a 50 millimetre ("mm") rotating spiral enclosed within a core barrel. Samples were extracted at 1.5 meter ("m") intervals at an average mass of 1.51 kilograms ("kg"), placed in plastic bags, ticketed, and sealed.
Analysis of these samples was subsequently carried out by a laboratory in Zimbabwe. The samples were pulverised, split, weighed into 500 gram ("g") aliquots and bottle rolled for 24 hours in 0.2 % CN at a pH of 10.5 to 11. The solutions were analysed for gold via atomic adsorption spectrometry (AAS).
Of the samples, 10% were selected for fire assay. This was utilised to provide an indication of 'recovered' grade of gold in the bottle roll versus total gold content.
Resource estimation was carried out in February 2024 by Dr John Arthur, a UK based independent resource consultant. Mineral Resource classification categories and subsequent reporting are summarised in the following table. The Mineral Resource Statement presented has been classified in accordance with the requirements of the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC 2012 Edition). The Competent Person who assumes responsibility for reporting of the Mineral Resource is Dr John Arthur who is a Competent Person as defined by the JORC Code 2012 Edition, having more than 5 years experience that is relevant to the style of mineralisation and type of deposit described herein, and to the activity for which he accepts responsibility. The effective date of the Mineral Resource statement is 5 March 2024.
Updated surface topography and original basal topography along with surveyed drill collars were used to model the volumetric domains for the larger East and smaller West dumps. Auger drilling results were validated and composited prior to Exploratory data analysis (EDA) which established the nature of the variography and indicated anisotropic ranges of between 40-60m for the gold grade distribution within the individual dump domains. Analysis was carried out separately for the two dumps. Following validation of the variography and appropriate kriging neighbourhood analysis (KNA) a parent block model using 10x10x4m blocks was established which, given the drill spacing of 20x20m and 1.5m sample interval (on average) was considered appropriate and was confirmed by the KNA analysis. The parent model was subsequently sub-blocked to allow a better fit to the domain boundaries and Ordinary kriging was carried out on gold grade values within the parent blocks. Density data is limited and a value of 1.76t/m3 was applied globally based on the results obtained from 6 sites across the dumps and the average expected value of sand material benchmarked from various sources.
The classification of the majority of the material into the Indicated category is considered to be conservative and is primarily due to the lack of detailed density information. Dr Arthur considers that a significant tonnage of material could be subsequently upgraded to the Measured Mineral Resource category given a relatively small amount of work to establish detailed density analysis across the two dumps.
Mineral Resource Statement
Table 1. Nara Tailings Mineral Resource statement, effective date 5 March 2024
Domain | Category | Tonnes (Kt) | SG | Au (g/t) | Au (oz) |
NARA East & West | Measured | - | - | - | - |
Indicated | 292.94 | 1.76 | 0.62 | 5860 | |
Meas + Ind | 292.94 | 1.76 | 0.62 | 5860 | |
Inferred | 11.9 | 1.76 | 0.66 | 253 |
NOTES:
1. Mineral Resources estimated using 0.0 (zero)Au.g/t cut-off grade and presented on a 100% (of bottle roll value)-basis
2. Mineral Resources include mineralisation which may subsequently be evaluated and classified as Ore Reserves following appropriate technical and economic study.
3. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, marketing, or other relevant issues. Notwithstanding, it is considered that the reported Mineral Resources show reasonable prospects for eventual economic extraction.
4. The quantity and grade of reported Inferred resources in this estimation are uncertain in nature and there has been insufficient exploration to define these Inferred Resources as an Indicated or Measured Mineral Resource. It is uncertain if further exploration will result in upgrading them to an Indicated or Measured Mineral Resource category.
5. Contained metal and tonnes figures in totals may differ due to rounding.
Next Steps
Kavango intends to carry out metallurgical test work to assess further the potential recovery of gold, reagent consumption, and operating parameters for a possible future facility to process Nara's gold tailings.
Kavango will also carry out additional density measurements, which the consultant recommends may allow for a portion of the resource to be upgraded to a Measured Mineral Resource category.
The Company will follow this up with a study aimed at commercialising Nara's gold tailings opportunity to achieve early cashflow.
Kavango intends to investigate potential upside in the Mineral Resource Estimate identified by Dr. Arthur's work.
Multiple holes stopped short due to intersecting items such as past concrete infrastructure, meaning there is potential for the tonnage to increase.
Likewise, some grade enrichment with depth was also seen in multiple holes, potentially as a result of gravity concentration. Given that not all holes reached target depth this may offer additional contained gold beyond the original target depths scoped out for the auger drilling.
THIS ANNOUNCEMENT CONTAINS INSIDE INFORMATION FOR THE PURPOSES OF ARTICLE 7 OF REGULATION 2014/596/EU WHICH IS PART OF DOMESTIC UK LAW PURSUANT TO THE MARKET ABUSE (AMENDMENT) (EU EXIT) REGULATIONS (SI 2019/310) ("UK MAR"). UPON THE PUBLICATION OF THIS ANNOUNCEMENT, THIS INSIDE INFORMATION (AS DEFINED IN UK MAR) IS NOW CONSIDERED TO BE IN THE PUBLIC DOMAIN.
Further information in respect of the Company and its business interests is provided on the Company's website at www.kavangoresources.com and on Twitter at #KAV.
For further information please contact:
Kavango Resources plc
Ben Turney
+46 7697 406 06
First Equity (Broker)
+44 207 374 2212
Jason Robertson
Kavango Competent Person Statement
The technical information contained in this announcement pertaining to the Nara Tailings Resource Estimate has been read and approved by Dr John Arthur. Dr Arthur is Chartered Geologist (FGS) with some 28 years' experience in the minerals industry. He has a PhD from Cardiff university. Dr Arthur has sufficient experience that is relevant to the exploration programmes and geology of the main styles of mineralisation and deposit types under consideration to act as a Qualified Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'.
APPENDIX 1
JORC Code, 2012 Edition - Table 1 NARA TAILINGS effective date 5 March 2024
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria | JORC Code explanation | Commentary |
Sampling techniques | · Nature and quality of sampling (eg cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as limiting the broad meaning of sampling. · Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used. · Aspects of the determination of mineralisation that are Material to the Public Report. · In cases where 'industry standard' work has been done this would be relatively simple (eg 'reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30 g charge for fire assay'). In other cases more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (eg submarine nodules) may warrant disclosure of detailed information. | · Samples were extracted as auger samples at 1.5 m intervals at an average mass of 1.51 kg. · These were placed in plastic bags, ticketed, and sealed. · Samples were split using a riffle splitter. A duplicate, standard (CRM) and blank were inserted every 20th sample. Samples were re-ticketed to ensure numerical continuity and were batched in coated clean poly-weave sacks. |
Drilling techniques | · Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of diamond tails, face-sampling bit or other type, whether core is oriented and if so, by what method, etc). | · Each hole was drilled using an engine-driven hydraulic auger with a 50 mm rotating spiral enclosed within a core barrel. · Samples were extracted as auger samples at 1.5 m intervals. |
Drill sample recovery | · Method of recording and assessing core and chip sample recoveries and results assessed. · Measures taken to maximise sample recovery and ensure representative nature of the samples. · Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to preferential loss/gain of fine/coarse material. | · All samples were weighed. · No relationship was noted between sample size and grade. · Some holes stopped short of final depth due to hitting concrete infrastructure. This may result in under-reporting of grade as deeper (potentially enriched) portions could sometimes not be sampled. · Drilling was carried out "dry" and recovery is therefore high with no perceptible preferential loss of either fine or coarse material. |
Logging | · Whether core and chip samples have been geologically and geotechnically logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies. · Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc) photography. · The total length and percentage of the relevant intersections logged. | · Logging was limited to colour and textural descriptions given the nature of the tailings. This is considered sufficient for the style of deposit. · All intervals were logged, using the same sample intervals as the assay samples. |
Sub-sampling techniques and sample preparation | · If core, whether cut or sawn and whether quarter, half or all core taken. · If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry. · For all sample types, the nature, quality and appropriateness of the sample preparation technique. · Quality control procedures adopted for all sub-sampling stages to maximise representivity of samples. · Measures taken to ensure that the sampling is representative of the in situ material collected, including for instance results for field duplicate/second-half sampling. · Whether sample sizes are appropriate to the grain size of the material being sampled. | · Samples were split using an appropriately sized riffle splitter, aiming at a >500g sample weight for analysis. · The riffle splitter was cleaned with compressed air between samples. · The 500g sample size is considered representative for the particle size. · A duplicate, standard (CRM) and blank were inserted every 20th sample. · Field duplicates were derived from the primary sample using the balance of the sample. |
Quality of assay data and laboratory tests | · The nature, quality and appropriateness of the assaying and laboratory procedures used and whether the technique is considered partial or total. · For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in determining the analysis including instrument make and model, reading times, calibrations factors applied and their derivation, etc. · Nature of quality control procedures adopted (eg standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (ie lack of bias) and precision have been established. | · A company audit was made of the assay laboratory before it was engaged. · The bottle roll technique uses a cyanide leach and is a partial analysis method. · 10% of samples were analysed by Fire Assay as a further check. This in all but one sample reported a higher grade (as was expected). The target of this work was however to estimate leachable rather than total gold, and for which bottle roll is considered most appropriate. · Round robin and accreditation results for the laboratory were reviewed and considered acceptable. · The company's QAQC samples, including standards, are considered to confirm acceptable bias and precision, with no contamination issues identified. |
Verification of sampling and assaying | · The verification of significant intersections by either independent or alternative company personnel. · The use of twinned holes. · Documentation of primary data, data entry procedures, data verification, data storage (physical and electronic) protocols. · Discuss any adjustment to assay data. | · The Company's internal CP reviewed sampling and visited site to confirm that protocols had been followed. · No twinned holes were used. · Logged data was securely recorded and backed up. · Assay data was received as assay certificates and cross checked against sample submission data to ensure a correct match. |
Location of data points | · Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation. · Specification of the grid system used. · Quality and adequacy of topographic control. | · All holes were set out by a professional survey company using Differential GPS. · Map datum is standard for the region of UTM35S Arc 1950. · Location of actual holes was observed to vary by up to 40cm from laid out position. Overall accuracy therefore is to be considered as +-40cm in X and Y, and approximately +-10cm in Z axis. |
Data spacing and distribution | · Data spacing for reporting of Exploration Results. · Whether the data spacing and distribution is sufficient to establish the degree of geological and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s) and classifications applied. · Whether sample compositing has been applied. | · The auger drill sites were designed according to a grid with 20 m line spacing and 20 m sample spacing. · This is considered appropriate for the Mineral Resource and Ore Reserve estimation procedure and classifications. · Compositing was not required. |
Orientation of data in relation to geological structure | · Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which this is known, considering the deposit type. · If the relationship between the drilling orientation and the orientation of key mineralised structures is considered to have introduced a sampling bias, this should be assessed and reported if material. | · The greatest variation is likely to be vertically, through stratification as feed material sources varied over time. · The vertical orientation of the holes allows for close to 90° intersection angle with the stratification within the dumps · The relatively short sample length (1.5m) allows for relatively accurate definition of variation in source feed, colour, grain size. · No bias is considered to have resulted. |
Sample security | · The measures taken to ensure sample security. | · Samples were stored in a locked company compound at site and in a locked container in Bulawayo. They were shipped onwards to the analytical facility by a reliable courier. |
Audits or reviews | · The results of any audits or reviews of sampling techniques and data. | · The auger sampling process was recorded on video and is considered acceptable by both the internal and external CP. · Riffle splitting of sub-samples was reviewed by the Company's internal CP and is considered acceptable. · The Resource Consultant reviewed all data, and spot checked 10% of values versus logs. |
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria | JORC Code explanation | Commentary |
Mineral tenement and land tenure status | · Type, reference name/number, location and ownership including agreements or material issues with third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical sites, wilderness or national park and environmental settings. · The security of the tenure held at the time of reporting along with any known impediments to obtaining a licence to operate in the area. | · The mineral Claims are held by a third party with whom Kavango holds a valid Option agreement Call Option Agreement dated 23 June 2023. · The 45 Claims under the agreement cover 415 hectares, and the Call Option Agreement is valid for two years to 23 June 2025, during which Kavango has exclusive access to the Claims. · Under the Call Option Agreement Kavango will need to pay the licence holder a fee before expiry, following which Kavango will own 100%. · There is established mining activity in the area. An environmental permit is held by the Claims holder. |
Exploration done by other parties | · Acknowledgment and appraisal of exploration by other parties. | · The Nara project covers four historic mines with total recorded production of more than 90,000oz in the first half of the 20th Century. These mines also produced credits of tungsten and silver. There is a 30-year plus history of small-scale mining & custom milling on the property. · No drilling or modern exploration has been carried out to assess the property. |
Geology | · Deposit type, geological setting and style of mineralisation. | · The resource is a tailings deposit.The Nara prospect is located within the Filabusi Greenstone Belt, sitting astride the Redwing Shear Zone, which hosts gold mineralisation. Seven formations have been identified at Filabusi and these are grouped into Lower and Upper greenstones of the Bulawayan Group as in the adjoining Mberengwa belt. There is apparent unconformity between the Lower and Upper greenstones. · Historical reports and longitudinal sections show mining of at least two parallel orebodies and a third oblique splay. The southern or footwall reef consists of massive boudinage quartz veins, and the northern hangingwall reef consists of quartz stringers, both hosted within mafic schist. Both types of reefs are set in highly sheared and laminated chlorite- and carbonated biotite-feldspar-schists, with the proportion of biotite increasing towards the quartz. There is congruence between one of the reefs and the splay, with the first type truncating the second along strike east of the old main shaft. · The area around the Nara project contains 139 historic gold mines with a combined production of greater than 1.7Moz gold. These mines have been predominantly narrow, high-grade oxide production. · There are currently no active large mines. The area is instead serviced by stamp mills, receiving ore from tribute miners. |
Drill hole Information | · A summary of all information material to the understanding of the exploration results including a tabulation of the following information for all Material drill holes: o easting and northing of the drill hole collar o elevation or RL (Reduced Level - elevation above sea level in metres) of the drill hole collar o dip and azimuth of the hole o down hole length and interception depth o hole length. · If the exclusion of this information is justified on the basis that the information is not Material and this exclusion does not detract from the understanding of the report, the Competent Person should clearly explain why this is the case. | · These data are provided as an appendix in the Mineral Resource Report to the Company. |
Data aggregation methods | · In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum grade truncations (eg cutting of high grades) and cut-off grades are usually Material and should be stated. · Where aggregate intercepts incorporate short lengths of high grade results and longer lengths of low grade results, the procedure used for such aggregation should be stated and some typical examples of such aggregations should be shown in detail. · The assumptions used for any reporting of metal equivalent values should be clearly stated. | · No weighted averages have been used. · No higher cut has been used, as not considered appropriate. · Samples are generally of a consistent length. · Only gold values are included. |
Relationship between mineralisation widths and intercept lengths | · These relationships are particularly important in the reporting of Exploration Results. · If the geometry of the mineralisation with respect to the drill hole angle is known, its nature should be reported. · If it is not known and only the down hole lengths are reported, there should be a clear statement to this effect (eg 'down hole length, true width not known'). | · The auger holes are considered perpendicular to stratification from when tailings were laid down. · Down hole lengths will therefore approximate to true widths. |
Diagrams | · Appropriate maps and sections (with scales) and tabulations of intercepts should be included for any significant discovery being reported These should include, but not be limited to a plan view of drill hole collar locations and appropriate sectional views. | · These are contained in separate resource report. |
Balanced reporting | · Where comprehensive reporting of all Exploration Results is not practicable, representative reporting of both low and high grades and/or widths should be practiced to avoid misleading reporting of Exploration Results. | · All grades and widths have been reported. |
Other substantive exploration data | · Other exploration data, if meaningful and material, should be reported including (but not limited to): geological observations; geophysical survey results; geochemical survey results; bulk samples - size and method of treatment; metallurgical test results; bulk density, groundwater, geotechnical and rock characteristics; potential deleterious or contaminating substances. | · Density data was collected from 6 points across the tailings using a volumetric metal box to obtain a measure of in-situ density. The weight of this was then divided by the volume to provide the density. · No metallurgical work has yet been carried out, however the bottle roll testwork provides a strong indication of the leachability of the tailings. · No deleterious materials were observed in the dumps or samples. |
Further work | · The nature and scale of planned further work (eg tests for lateral extensions or depth extensions or large-scale step-out drilling). · Diagrams clearly highlighting the areas of possible extensions, including the main geological interpretations and future drilling areas, provided this information is not commercially sensitive. | · There may be scope to extend the resource at depth. · Additional nearby dumps may become available in the future. |
Section 3 Estimation and Reporting of Mineral Resources
(Criteria listed in section 1, and where relevant in section 2, also apply to this section.)