Work Program Commences at Gorge Lithium Project
Filed with ASX · · 4 pages · English
Phase 1 of the field program has begun, to include sampling and surface trenching along with geological mapping. Dialogue and consultation has begun with local First Nation communities. The program is designed to identify the extent of spodumene mineralisation and generate short term drill targets. The previously announced $1.5 million capital raise has been closed. Balkan Mining and Miner
Bayan Mining and Minerals Limited on 6ix
Earlier from Bayan Mining and Minerals
- Exceptional Rock Samples up to 6.8% Li2O at Gorge Project
- Rekovac Operations Update
- Balkan secures canadian lithium project
- EMEA (BIH) Pty Ltd Transaction Update
- BMM to expand its Balkan portfolio
Later from Bayan Mining and Minerals
- Balkan secures tango lithium project in Ontario
- Tango Lithium Project Update
- Increase in Ground at the Gorge Lithium Project in Canada
- Canadian Lithium portfolio strengthened
- 1.8M @ 3.75% LI20 assays from gorge lithium project
Follow Bayan Mining and Minerals into a list and get an email when it puts out news.
Follow Bayan Mining and Minerals