Toro Energy Ltd has released a press release.
Wiluna Uranium Project Studies Continue
Filed with ASX ·
6ix hasn’t read this filing yet.
Story so far
Earlier from Toro Energy
- Wiluna Uranium Project potential significant value increase
- Assays Show Exceptional 4.5m Massive Ni Sulphide @ 3.91% Ni
- More Massive Nickel Sulphides Discovered & Fundraising
- Further Diamond Drilling Starts at Dusty Nickel Discovery
- Reverse Circulation Drilling Completed at Golden Ways
Later from Toro Energy
- Gold intercepts confirm prospectivity of Golden Ways
- Next phase drilling at Dusty Nickel Project
- 22.4g/t gold surface sample 1.3km south expands Golden Ways
- 2021 Diamond Drilling Campaign Commences at Dusty
- $2.125m fundraising and CPA terminates
Follow Toro Energy into a list and get an email when it puts out news.
Follow Toro Energy