Vibra Energia SaBMFBOVESPA: VBBR3

GHG Inventory Verification Statement - 2024

· Issued by Vibra Energia Sa
Verification Statement

Nº 367.053/25

This Verification Statement documents that ABNT performed verification activities in compliance with the standard ISO 14064-3: 2007 and the verification specifications of the Brazilian GHG Protocol Programme.

VIBRA ENERGIA S.A.

Responsible for the Inventory: Lucas Freitas de Lima e Freitas

E-mail: lucasfreitas@vibraenergia.com.br

Associação Brasileira de Normas Técnicas - ABNT

Team Leader: Andreia Mendonça de Oliveira

E-mail: andreiamoliveira11@gmail.com

The Greenhouse Gases (GHG) Emissions reported by VIBRA ENERGIA S.A., in its emissions inventory from January 1st to December 31st, 2024, are verifiable and comply with the requirements of the Brazilian GHG Protocol Programme, detailed in the Specifications for Accounting, Quantification and Publication of Corporate Inventories of Greenhouse Gas Emissions (EPB).

Level of assurance

ABNT has assigned the following level of assurance to the verification process:

Verification with limited level of assurance.

"There is no evidence that the Organizations' greenhouse gas inventory for the year 2024 is not materially correct, is not a fair representation of the GHG data and information and has not been prepared in accordance with the Specifications of the Brazilian GHG Protocol Programme."

The limits of the verification process were:

There were no limitations in the process. The Organization opted for this level of assurance.



Verification Scope Description

The Organization's inventory of 2024 has been verified within the following scope:

Organizational boundaries

Operational boundaries

Operational Control approach Equity share approach

Scope 1

Scope 2 - Location-Based method

Scope 2 - Market-Based method
Scope 3

The following sources were excluded from the verification:

CO2 refills in fire extinguishers, as they are not significant sources.

Facilities visited

Facilities visited during the verification process:

Facility

Relation with holding

Address

Date

MATRIZ

MATRIZ

Rua Correia Vasques, 250, Cidade Nova , RIO DE

JANEIRO/RJ

26/02/2025

LUB

Unidade visitada

Av Fabor, 3200 , DUQUE DE

CAXIAS/RJ

25/02/2025

DERIO

Unidade visitada

Av Fabor, 3200 , DUQUE DE CAXIAS/RJ -

25/02/2025

BADUC

Unidade visitada

Rod. Washington Luiz - Vila Actura, Duque de Caxias RIO

DE JANEIRO - RJ,

27/02/2025

- BEGON (GO)

Unidade visitada

Av. Bruxelas, 250, Jardim Novo Mundo, GOIANIA/GO

10/03/2025

Total verified emissions (Operational Control approach)

GHG

Metric Tons of CO2 equivalent (tCO2e)

Scope 1

Scope 2 Location-based method

Scope 2 Market-based method

Scope 3

CO2

39.785,554

12.089,862

10.453,331

87.777.147,426

CH4

186,493

4,777

4,777

77.001,576

N2O

164,414

4,521

4,521

37.894,705

HFCs

44,766

-

-

-

PFCs

-

-

-

-

SF6

-

-

-

-

NF3

-

-

-

-

TOTAL

40.181,227

12.099,160

10.462,629

87.892.043,707

Biogenic CO2

6.524,328

-

-

14.727.091,054



Additional comments

Emission of gases not regulated by the Kyoto Protocol:

HCFC-22 (R22) 7,7440 tCO2e

Conflicts of interest

I, Andreia Mendonça de Oliveira, certify that no conflict of interest exists between VIBRA ENERGIA S.A. and ABNT, or any of the individual members of the verification team involved in the verification of the inventory, as defined in chapter 3.2.1 of the Verification Specifications of the Brazilian GHG Protocol

Andreia Mendonça de Oliveira

05/13/2025

(Team Leader)

Date

Digital signature recognition1

GHG Emissions Inventory Verifier's conclusion

As responsible for the verification activities of the GHG inventory of VIBRA ENERGIA S.A., we certify that the information contained herein are accurate.

Andreia Mendonça de Oliveira

05/13/2025

(Team leader)

Date

Digital signature recognition1

Lais Silva Marchiori

05/13/2025

(Independent reviewer)

Date

Digital signature recognition1

Authorization

I, Lucas Freitas de Lima e Freitas, accept the results of this verification statement.

05/13/2025

Lucas Freitas de Lima e Freitas

Date



Digital signature recognition1 Rio de Janeiro, May 13th, 2025.

Guy Ladvocat

Systems Certification Manager

1 By checking the box "digital signature recognition", I agree that this verification statement is considered "in writing" and "signed" for all purposes and any electronic records will be considered "in writing". Expressly waive any and all rights to deny the legal validity, the validity or enforceability of this verification statement and any documents related to it on the grounds that have been prepared and completed electronically.

This statement is supported by ABNT's standard service contract and procedures, valid only signed by the System Certification Manager. Its validity can be confirmed at the following address: https://www.abnt.org.br. For further information: sustentabilidade@abnt.org.br. CNPJ: 33.402.892/0001-06.



Earlier from Vibra Energia Sa

All Vibra Energia Sa news releases