Vertex Power-up Gravity Gold Plant at Reward
Filed with ASX · · 13 pages · English
Summary by 6ix AI
Vertex Minerals Ltd. has announced an update on the gravity gold plant at the Reward Gold Mine, indicating that the power-up phase is complete and mechanical commissioning is underway. The refurbishment and installation of the processing facility have progressed safely and efficiently, with a focus now on commissioning the operating circuits. The new plant is designed for gravity processing only, featuring unique qualities such as low operating costs and minimal environmental impact. The company aims to commence gold production from existing stockpiles and develop the high-grade Reward Mine in the near future.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Story so far
Earlier from Vertex Minerals
- Placement and Convertible loan to further Advance Reward
- Acquires Rig to Advance Exploration at Reward below Resource
- VTX to Incorporate TOMRA Ore Sorter at Reward Gold Plant
- $3.8M Placement to Advance the High-Grade Reward Gold Mine
- Trading halt
Later from Vertex Minerals
- Convertible Loan Funding Completed
- Gold Ore Commission Underway
- Vertex Commissions Laser Ore Sorter
- Vertex Prepares First Gold from Plant Commissioning for Sale
- Vertex Identifies Fully Developed Stope Block for Production
Follow Vertex Minerals into a list and get an email when it puts out news.
Follow Vertex Minerals