21 October 2026 SOIL SURVEY EXTENDS UNDRILLED WATSONS COPPER–ZINC CORRIDOR TO 3KM HIGHLIGHTS • Additional pXRF soil sampling extends the Watsons copper–zinc anomalous corridor from approximately 2.4km to 3km, an increase of approximately 25% • Execution of a land access agreement over the...
Undrilled Watsons Cu-Zn Soil Corridor Extended to 3 km
Filed with ASX ·
6ix is reading this filing.
Earlier from Exultant Mining
- Watsons pXRF Soil Survey Confirms 2.4km Copper-Zinc Corridor
- High-Grade Zn-Pb-Ag Extend Balerion at Depth
- Black Hammer Advances with Three Priority Cu-Au Targets
- Final Balerion Hole Intersects Sulphide-Bearing Shear Zone
- Balerion Drilling Intersects Sulphide-Bearing Contact Zone
