Cvw Sustainable Royalties Inc.TSXV: CVW

Titanium Corporation announces 2006 development program

TORONTO, April 26 /CNW/ - Titanium Corporation Inc. (TSX-V:TIC) is
pleased to announce its 2006 program with a focus on the production of zircon
in the first phase of commercial development. In light of the strength of
zircon markets and the opportunity this represents, the Company is evaluating
entering the zircon markets sooner, thereby reducing development costs and
providing earlier cash flow. In this regard, Titanium Corporation plans to
initially conduct an on-site 2006 pilot program involving a mineral
concentrator facility designed to assess the recovery of heavy minerals from
the oil sands tailings pipeline along with the recovery of hydrocarbons
associated with the minerals recovery process. The mineral concentrator
facility will be constructed in Australia and shipped to Fort McMurray,
Alberta, for commissioning during the Summer of 2006. In addition, the
Company's existing Bulk Sampling facility, which operated on-site in 2005,
will be an integral part of this program. Inclusive of operating costs, the
pilot program is expected to cost approximately CAD $3 million.
Subsequently, Titanium Corporation intends to commence the first phase of
commercial development, focusing on the production of zircon. This decision
was made after continual evaluation of heavy minerals markets and development
options. The commercial zircon facility would be constructed in place of the
previously planned Phase 1 demonstration plant.
Global demand for zircon continues to outpace supply, driven by new
demand from China and other Asian countries, particularly in the ceramics
industry. In contrast, the market for titanium chloride feedstock (the raw
material to produce titanium dioxide "TiO2" pigment) is currently in balance.
Pricing for chloride feedstock remains static and this market is likely to
become increasingly competitive in the near term due to recently announced new
projects. Therefore, Titanium Corporation is examining other uses for its
titanium-bearing minerals and the appropriate timing of market entry. This
removes the need to generate large industrial-sized titanium mineral samples -
the primary reason for the demonstration plant.
Titanium Corporation Inc. will host a conference call about these
announcements at 9 am Toronto/New York time (EDT) on Thursday April 27, 2006.
The toll-free conference call dial-in number to participate is 1-888-603-6873
and the toll/international dial-in number is 1-973-582-2706. A replay of the
conference call will be available from 6:15pm EDT on April 27, 2006 until
midnight EDT on May 4, 2006; toll-free at 1-877-519-4471 and
toll/international at 1-973-341-3080, replay Pin Number 7332881.

About Titanium Corporation
--------------------------
Titanium Corporation Inc. is a Toronto-based mineral development company
whose shares are listed on the TSX Venture Exchange under the symbol "TIC",
U.S. clearing symbol "TITUF", CUSIP Number: 88833T104. The Company's mission
is to become the first titanium and zircon sand producer from Canada's oil
sands. Through extensive research, including the construction and successful
operation of a pilot facility, the Company has developed proprietary
technology to recover valuable titanium-bearing minerals and zircon from oil
sands tailings. For more information, please visit
www.titaniumcorporation.com.

Disclosure regarding forward-looking statements
Note: This press release contains projections and forward-looking
information that involve various risks and uncertainties regarding future
events. Such forward-looking information can include without limitation
statements based on current expectations which are based on assumptions and
are subject to a number of risks and uncertainties and are not guarantees of
future performance of the Corporation. These risks and uncertainties could
cause actual results and the Corporation's plans and objectives to differ
materially from those expressed in the forward-looking information. Actual
results and future events could differ materially from those anticipated in
such information. These risks and uncertainties are more particularly
described on page 24 in the Risk Factors section of Titanium Corporation's
Annual Information Form which was filed on SEDAR (www.sedar.com) January 18,
2005, as updated by the Corporation's Annual and Quarterly Management's
Discussion and Analysis. Most notably these risks and assumptions include
risks associated with the market price of zircon and titanium products, costs
of construction and operation of facilities, and assumptions about
construction, timing and delivery. These and all subsequent written and oral
forward-looking information are based on estimates and opinions of management
on the dates they are made and expressly qualified in their entirety by this
notice. The Corporation assumes no obligation to update forward-looking
information should circumstances or management's estimates or opinions change.

The TSX Venture Exchange has not reviewed and does not accept
responsibility for the adequacy and accuracy of this release.