SEMAFO IncTSX: SMF

The bankable feasibility study of the Mana project is completed

· Issued by SEMAFO Inc via CNW
SEMAFO    TSX-SMF

MONTREAL, QC, Aug. 18 /CNW Telbec/ - SEMAFO (TSX - SMF) is pleased to
announce that the bankable feasibility study of its Mana gold project in
Burkina Faso was recently submitted jointly by Breton Banville International
inc. (BBA) and Micon International Limited (Micon) consulting firms. BBA was
responsible for reviewing and updating the study, as well as editing the
geological report to comply with National Instrument 43-101 standards. Micon
was responsible for the sign-off of the study. All amounts are in U. S.
dollars, unless otherwise indicated.

HIGHLIGHTS
----------

-    Proven and probable mineral reserves: 7.2 million tonnes grading
     2.82 g/t at $380 gold price;
-    Gold contained : 652,000 ounces;
-    Average production rate:  - 105,000 ounces per year for the
                                 first 3 years;
                               - 79,000 ounces per year for the last
                                 3 years;
-    Average mine operating cost: $254 per ounce; and
-    Initial capital cost : $48.5 million.

Using a price of gold of $380 per ounce, the study presents total mineral
reserves of 7.2 million tonnes of ore at an average grade of 2.82 g/t
including the Nyafe and Wona deposits and containing 652,000 ounces of gold.
Using a price of gold of $425 per ounce (as estimated by Semafo), the total
mineral reserves stands at 8.0 million tonnes of ore at an average grade of
2.75 g/t Au containing 706,000 ounces of gold.
The study proposes a 6-year mine life producing gold at the average rate
of 105,000 ounces per year for the first three years and 79,000 ounces for the
last three years of the mine life. With a recovery rate of 85 %, a CIL plant
will produce a total of 552,800 ounces of gold. The average overall strip
ratio will be of 3.6 to 1. The Wona deposit will provide 92% of the tonnage
extracted and 82% of the gold produced. The oxide portion of ore will
represent 80% of the tonnage milled, 90% of which will come from Wona and 80%
of the gold produced.
Using a price of gold of $380 per ounce, the total (Wona and NyafDe)
mineral resources (including mineral reserves) stand as follows:

<<
      ---------------------------------------------------------
                    By Mineral Resource Category
      ---------------------------------------------------------
       Category    Tonnage (t)    Grade (g/t Au)    Ounces Au
      ---------------------------------------------------------
       Measured      6,973,700         2.51           564,600
      ---------------------------------------------------------
       Indicated     4,841,200         3.08           481,300
      ---------------------------------------------------------
       TOTAL        11,814,900         2.74         1,045,900
      ---------------------------------------------------------
       Inferred      7,472,200         2.31           557,000
      ---------------------------------------------------------
>>

The project initial capital costs are evaluated at $48.5M and the cash
operating costs estimated at $254 per ounce. Using a price of gold of $400 per
ounce, the base case generates a project Internal Rate of Return (IRR) of
20.7%, an NPV of $21.5M and a payback period of 2 years.

<<
      ---------------------------------------------------------
        Gold price ($ / oz)    IRR (%)    NPV (in million $)
      ---------------------------------------------------------
            400 (base case)       20.7          21.5
      ---------------------------------------------------------
                  410             23.9          26.1
      ---------------------------------------------------------
                  420             27.1          30.7
      ---------------------------------------------------------
                  430             30.2          35.3
      ---------------------------------------------------------
                  440             33.3          39.9
      ---------------------------------------------------------
>>


The project capital costs are evaluated at US$48.5M and the cash costs
planned at US$254 per ounce, using a price of gold of US $400 per ounce. At
US$420, the IRR reaches 27.1%.
The study signed off by BBA/Micon is based on the work of the following
external consulting firms to support the necessary data to complete the
original Feasibility Study prepared by Reminex. They are:

-    Geostat Systems International- Canada, for geological and
     geostatistical modeling;
-    SGS-Ghana, for metallurgical tests and environmental impact study;
-    Mintek-South Africa, for metallurgical and mill design;
-    Orway Mineral Consultants, Australia, for crushing and milling
     design;
-    Reminex Valorisation-Morocco, for metallurgical tests;
-    Reminex IngDenierie-Casablanca, original feasibility study;
-    Knight Piesold-Canada, for pits design and tailings dam design;
-    CID-Morocco, for water dam and pumping station design;
-    Antea and Geopole-Morocco, for hydrological studies;
-    Maptek/KRJA Systems-UK, for mine planning; and
-    Socrege-Burkina Faso, for environmental impact study.

Following the reception of the feasibility study, Semafo is currently
working with the Government of Burkina Faso to obtain the necessary permits.

The common shares of Semafo are traded on The Toronto Stock Exchange
under the symbol "SMF".


Semafo is a mining company whose mission is to explore, develop and mine
major gold deposits in West Africa. Semafo currently operates the Kiniero
mine in Guinea, the Samira Hill mine in Niger and is developing the Mana
project in Burkina Faso

More extensive information on Semafo can be found on our home page at
http://www.semafo.com

NO REGULATORY AUTHORITY HAS APPROVED OR DISAPPROVED THE CONTENT OF THIS
RELEASE

SEMAFO Inc on 6ix

Earlier from SEMAFO

Later from SEMAFO

All SEMAFO news releases