SEMAFO TSX-SMF
MONTREAL, Aug. 19 /CNW Telbec/ - SEMAFO (TSX - SMF) is pleased to
announce that the bankable feasibility study of its Mana gold project in
Burkina Faso was recently submitted jointly by Breton Banville International
inc. (BBA) and Micon International Limited (Micon) consulting firms. BBA was
responsible for reviewing and updating the study, as well as editing the
geological report to comply with National Instrument 43-101 standards. Micon
was responsible for the sign-off of the study. All amounts are in U.S.
dollars, unless otherwise indicated.
HIGHLIGHTS
----------
- Proven and probable mineral reserves: 7.2 million tonnes grading
2.82 g/t at $380 gold price;
- Gold contained: 652,000 ounces: 434,000 proven and 218,000 probable
- Average production rate: - 105,000 ounces per year for the first
3 years;
- 79,000 ounces per year for the last
3 years;
- Average mine operating cash cost: $254 per ounce; and
- Initial capital cost: $48.5 million.
Using a price of gold of $380 per ounce, the study presents total mineral
reserves of 7.2 million tonnes of ore at an average grade of 2.82 g/t
including the Nyafe and Wona deposits and containing 652,000 ounces of gold
(details in the table below). Using a price of gold of $425 per ounce (as
estimated by Semafo), the total mineral reserves stand at 8.0 million tonnes
of ore at an average grade of 2.75 g/t Au containing 706,000 ounces of gold.
<<
-------------------------------------------------------------------------
Mineral Reserves by category ((at) $380 per ounce)
-------------------------------------------------------------------------
Category Tonnage (t) Grade (g/t Au) Ounces Au
-------------------------------------------------------------------------
Proven 5,398,000 2.50 434,000
-------------------------------------------------------------------------
Probable 1,788,400 3.70 218,000
-------------------------------------------------------------------------
TOTAL 7,186,400 2.82 652,000
-------------------------------------------------------------------------
>>
The study proposes a 6-year mine life producing gold at the average rate
of 105,000 ounces per year for the first three years and 79,000 ounces for the
last three years of the mine life. Based on an average recovery rate of 85 %,
a CIL plant will produce a total of 552,800 ounces of gold. The average
overall strip ratio will be of 3.6 to 1. The Wona deposit will provide 92% of
the tonnage extracted and 82% of the gold produced. The oxide portion of ore
will represent 80% of the tonnage milled, 90% of which will come from Wona and
80% of the gold produced.
Using a price of gold of $380 per ounce, the total (Wona and NyafDe)
mineral resources (including mineral reserves) stand as follows:
<<
-------------------------------------------------------------------------
Mineral Resource by category
-------------------------------------------------------------------------
Category Tonnage (t) Grade (g/t Au) Ounces Au
-------------------------------------------------------------------------
Measured 6,973,700 2.51 564,600
-------------------------------------------------------------------------
Indicated 4,841,200 3.08 481,300
-------------------------------------------------------------------------
TOTAL 11,814,900 2.74 1,045,900
-------------------------------------------------------------------------
Inferred 7,472,200 2.31 557,000
-------------------------------------------------------------------------
>>
The project initial capital costs are evaluated at $48.5M and the cash
operating costs estimated at $254 per ounce. Using a price of gold of $400 per
ounce, the base case generates a project Internal Rate of Return (IRR) of
20.7%, an NPV of $21.5M and a payback period of 2 years. A sensitivity
analysis on gold is presented as follows:
<<
-------------------------------------------------------------------------
Gold price ($ / oz) IRR (%) NPV (in million $)
-------------------------------------------------------------------------
400 (base case) 20.7 21.5
-------------------------------------------------------------------------
410 23.9 26.1
-------------------------------------------------------------------------
420 27.1 30.7
-------------------------------------------------------------------------
430 30.2 35.3
-------------------------------------------------------------------------
440 33.3 39.9
-------------------------------------------------------------------------
The project capital costs are evaluated at US$48.5M and the cash costs
planned at US$254 per ounce, using a price of gold of US $400 per ounce. At
US$420, the IRR reaches 27.1%.
The study signed off by BBA/Micon is based on the work of the following
external consulting firms to support the necessary data to complete the
original Feasibility Study prepared by Reminex. They are:
- Geostat Systems International-Canada, for geological and
geostatistical modeling;
- SGS-Ghana, for metallurgical tests and environmental impact study;
- Mintek-South Africa, for metallurgical and mill design;
- Orway Mineral Consultants, Australia, for crushing and milling design;
- Reminex Valorisation-Morocco, for metallurgical tests;
- Reminex IngDenierie-Casablanca, original feasibility study;
- Knight Piesold-Canada, for pits design and tailings dam design;
- CID-Morocco, for water dam and pumping station design;
- Antea and Geopole-Morocco, for hydrological studies;
- Maptek/KRJA Systems-UK, for mine planning; and
- Socrege-Burkina Faso, for environmental impact study.
Following the reception of the feasibility study, Semafo is currently
working with the Government of Burkina Faso to obtain the necessary permits.
The common shares of Semafo are traded on The Toronto Stock Exchange
under the symbol "SMF".
Semafo is a mining company whose mission is to explore, develop
and mine major gold deposits in West Africa. Semafo currently
operates the Kiniero mine in Guinea, the Samira Hill mine
in Niger and is developing the Mana project in Burkina Faso
NO REGULATORY AUTHORITY HAS APPROVED OR DISAPPROVED THE CONTENT OF THIS
RELEASE
The bankable feasibility study of the Mana project is completed
Earlier from SEMAFO
- Semafo achieves a record production at a cash operating cost of $217 per ounce
- Semafo achieves record production at Samira Hill and Kiniero
- Semafo's gold prospect in Ghana acquired by Birim
- Semafo's board forms special committee which appoints Westwind as financial advisor
- Record production for the first quarter of 2005
Later from SEMAFO
- Semafo announces record third quarter production
- SEMAFO cuts 4.11 g/t Au Over 27 Meters and 3.97 g/t Au Over 25 Meters on its Boulondjonga SW prospect
- SEMAFO achieves a record production at a cash operating cost of $216 per ounce
- SEMAFO reduces its hedging program and indebtedness, for an amount of 28.7 million USD
- Increase in mineral reserves by 37% at the Kiniero Gold Mine
Follow SEMAFO into a list and get an email when it puts out news.