Boab Metals LtdASX: BML

Testwork Improves Metal Recovery & Concentrate Grades

· Issued by Boab Metals Ltd

Filed with ASX · · 11 pages · English

Summary by 6ix AI

Boab Metals Ltd has announced interim results from metallurgical testwork at its Sorby Hills Lead-Silver-Zinc Project, which shows improved metal recovery and concentrate grades at the Norton Deposit. The testwork indicates a significant increase in lead recovery and confirms silver recovery levels, which will be incorporated into the upcoming front end engineering and design study. These results support a potential reassessment of the Ore Reserve at the Norton Deposit, enhancing the project's economic viability.

Written by 6ix AI from the company’s filing. How 6ix writes summaries

Boab Metals Ltd on 6ix

In the deck

Earlier from Boab Metals

Later from Boab Metals

All Boab Metals news releases