Key figures

  • Fairway oil production up 11% on prior quarter
  • Company divests 10% Working Interest in Fairway for A$6.2m
  • The total purchase price is A$6.2m (US$5.8m) after a reduction of US$0.2m in accordance with conditions of the sale.

On 6ix: 6ix.com/news/target-energy-limited-issues-june-2014-quarterly-report

WEST PERTH, AUSTRALIA--(Marketwired - Aug 1, 2014) -  US-focused oil and gas producer Target Energy Limited ("Target") (OTCQX: TEXQY) (ASX: TEX) is pleased to issue its Quarterly Report for the quarter ending 30 June 2014.

  • Fairway oil production up 11% on prior quarter
  • Company maintains high level of activity in Permian Basin
  • 5 wells drilled back-to-back at Fairway in Q1/Q2 2014
  • Production set to rise as new wells are stimulated
  • Drilling of further 5 Fairway wells to commence in August 2014
  • Company divests 10% Working Interest in Fairway for A$6.2m

1. Operations
Permian Basin, Texas

1.1. Fairway Project - Howard & Glasscock Counties (Target 35%-60% WI)

On 30 June 2014, Target Energy executed a transaction in which the Company sold a 10% working interest in its Fairway leases.

Further details regarding the transaction are included in Section 5.1 below.

1.2. Drilling

1.2.1. Wagga Wagga #2 (Target 35% WI)

The Wagga Wagga #2 well is situated approximately 706 metres (2,316 ft) south of Wagga Wagga #1 in Glasscock County. Drilling commenced on 16 April 2014 and concluded with the well reaching its Total Depth at 2,984m (9,790 ft) on 30 April 2014 (Table 1). Analysis of wireline log data indicated that that the well had encountered potential pay in the Wolfberry section and Fusselman Carbonate. The well was completed as an oil producer.

Well Reporting Summary - Wagga Wagga #2
Name and Type of WellWagga Wagga #2, Step Out/Appraisal (Oil)
Well LocationGlasscock Co, Texas
Lease DescriptionE/2 S221, Block 29, A-496; W&NW RR Co Survey
TEX Working Interest35%
Report Date7:00 pm 1/05/14 (Western Aust Standard Time) /
6:00 am 1/05/14 (USA Central Daylight Time)
Current Depth:2,984.0m (Total Depth). All reported depths are measured below the Rotary Table (RT) on the rig floor.
ProgressWell spudded 04:00 on 15 April 2014. Drill to Total Depth at 2,984.0m (9,790 ft). Run wireline logs; run and cement 5 1/2" production casing to 2,984.0m.

Table 1

1.2.2. Homar #1 (Target 50% WI)

Drilling commenced at Homar #1 well on 5 May 2014, with the well reaching a Total Depth of 3,292m (10,800 ft) on 29 May 2014 (Table 2). Homar #1 experienced strong oil and gas shows throughout the Wolfberry section as well as a strong show in the Fusselman Carbonate. The well was completed as an oil and gas producer.

Well Reporting Summary - Homar #1
Name and Type of WellHomar #1, Oil Exploration Well
Well LocationHoward Co, Texas
Lease DescriptionS24, Bl 35 A-1538; T&P RR Co Survey, Howard Co
TEX Working Interest50%
Report Date7:00 pm 5/06/14 (Western Aust Standard Time) /
6:00 am 5/06/14 (USA Central Daylight Time)
Current Depth:3,292 m (Total Depth). All reported depths are measured below the Rotary Table (RT) on the rig floor.
ProgressDrill ahead to 3,292m (10,800 ft); run and cement production casing. Rig released on 4 June 2014.

Table 2

1.2.3. Ballarat 185 #1 (Target 50% WI)

Drilling commenced at Ballarat 185 #1, approximately 5 kms east of the Sydney lease in Glasscock County, on 7 June 2014 with the well reaching its Total Depth of 3,030m (9,942 ft) on 28 June 2014 (Table 3). Wireline logs indicate potential pay in the Ellenburger, Fusselman and Wolfberry sections. The well will be tested in the Ellenburger and Fusselman zones prior to a decision regarding timing of a fracture stimulation program.

Well Reporting Summary - Ballarat 185 #1
Name and Type of WellBallarat 185 #1, Oil Exploration Well
Well LocationGlasscock County, Texas
Lease DescriptionS185, Bl 28, A-815 and A-A483, Waco & Northwestern Survey
TEX Working Interest50%
Report Date7:00 pm 1/07/14 (Western Aust Standard Time) /
6:00 am 1/07/14 (USA Central Daylight Time)
Current Depth:3,030 m. (Total Depth) All reported depths are measured below the Rotary Table (RT) on the rig floor.
ProgressDrill ahead to 1,114m (3,655 ft); run and cement intermediate casing. Drill ahead to 3,030m (9,942 ft); run wireline logs. Run and cement production casing. Rig released on 1 July 2014.

Table 3.

1.3. Completions

1.3.1. Wagga Wagga #2 (Target 35% WI)

A 7-stage fracture stimulation of the Wolfberry section was performed on Wagga Wagga #2 on 7 July 2014 after testing in the Fusselman Carbonate and the Devonian yielded only minor oil. The stimulation covered an interval of 440 metres, using approximately 23,000 barrels of load water. To date approximately 37% of the load water has been recovered, with oil flowing with the load water. At last report the well was flowing 31 BOPD with 178 BW (Table 4).

Well Reporting Summary - Wagga Wagga #2
Name and Type of WellWagga Wagga #2, Oil & Gas producer
Well LocationGlasscock Co, Texas
LeaseS221, Block 29, A-496; W&NW RR Co Survey, Glasscock Co
TEX Working Interest35%
Geological Rock TypeWolfberry - carbonates, shales and minor sandstone
Depth of Zones Tested2,453m - 2,893m
Type of Tests UndertakenOngoing flow-back after fracture stimulation
Duration of Tests UndertakenFlowback commenced 9 July 2014
Hydrocarbon Phases RecoveredOil, Gas
Other recovery8,830 Barrels of Load Water (total load now recovered: 38%)
Choke Size UsedVarious
Flow Rates31 BOPD + 178 BWPD (24 July 2014)
Number of Fracture Stimulations7 zones stimulated
Material Volumes of Non-Hydrocarbon GasesNil

Table 4

1.3.2. BOA 12 #3 (Target 50% WI)

A 4-stage fracture stimulation of the Wolfberry section was performed at BOA 12 #3 on 2 May 2014. The program covered a 225 m interval, using approximately 15,700 barrels of load water. The well was put on pump on 15 May 2014 and averaged 65 BOPD with 139 BWPD Water and 43 mcf of gas until 31 May 2014 (Table 5), at which time the well production was combined with that of BOA 12 #1.

Well Reporting Summary - BOA 12 #3
Name and Type of WellBOA 12 #3, Step Out/Appraisal (Oil)
Well LocationHoward Co, Texas
PermitS12, Block 33 T-2S, A-1353, T&P RR Survey
TEX Working Interest50%
Geological Rock TypePermian to Mississippian Shales & Carbonates
Depth of Zones Testedapp 2,800m - 3,000m
Type of Tests UndertakenFlowback, post-fracture stimulation
Duration of Tests Undertaken17 days
Hydrocarbon Phases Recovered1,144 Barrels of Oil (34%) + 427mcf gas from 22 May
Other recovery2,370 Barrels of Water (66%); app 6,800 barrels of load still water to recover
Choke Size UsedOn Pump
Flow RatesAverage: 65 BOPD + 139 BWPD + 43 mcf (15-31 May 2014)
Number of Fracture StimulationsFour stages
Material Volumes of Non-Hydrocarbon GasesNil

Table 5

1.3.3. Homar #1 (Target 50% WI)

A 5-stage fracture stimulation of the lower Wolfberry section was performed at Homar #1 on 8 July 2014. The program covered a 328 m interval, using approximately 17,300 barrels of load water. Flowback commenced on 9 July -- the well has so far recovered approximately 52% of the load water (9,000 BW) with oil flow having commenced on 15 July 2014. Flow rates will be reported once levels have sufficiently stabilised.

1.3.4. BOA North #4 (Target 50% WI)

BOA North #4 is presently awaiting fracture-stimulation.

Forward Program

2014 Drilling Program

A further five wells are planned to be drilled in the Fairway Project including new wells on the Company's BOA, Darwin, Ballarat, Bunbury and Taree lease-holdings.

2. Current Indicative 2014 Drilling Schedule

Estimated
Timing*
ProspectLocationTarget
Working Interest (WI)
August 2014BOA North #5Howard Co, Tx50%
Aug/Sep 2014Bunbury #1Howard Co, Tx60%#
September 2014Taree #1Glasscock Co, Tx60%#
Q4 2014Ballarat #2Glasscock Co, Tx50%
Q4 2014Darwin #4Howard Co, Tx50%

*Timing indicative only - actual order, timing and well selection will vary.
#Bunbury, Taree WI will reduce to 50% following Second Closing of sale to Aurora Energy Partners.

3. Production (1 Apr - 30 Jun)

ProjectTEX WIGross Gas Prodn in Period (mmcf)Cumulative Gross Gas Prodn (mmcf)Net Gas Prodn in Period (mmcf)Cumulative Net Gas Prodn
(mmcf)
Gross Oil Prodn in period (BO)Cumulative Gross
Oil Prodn (BO)
Net Oil Prodn in Period (BO)Cumulative Net Oil Prodn
(BO)
Section 2825%16.52,380.64.1595.148091,38512022,846
E. Chalkley35%2.459.30.820.81,459115,70551140,497
Merta25%10.8407.12.7101.81445,250361,312
Fairway+35%-60%45.5204.726.0121.623,703116,29713,01168,567
Total75.23,051.733.7839.225,785328,63613,677133,223

Net Production is scaled to Target's Working Interest, before royalties; mmcf = million cubic feet; mmcfgd = million cubic feet of gas per day; BO = barrels of oil, BOPD = barrels of oil per day, BOEPD = barrels of oil equivalent per day (Target reports a thermal equivalent when combining gas and oil production, where 1BOE = 6 mcf).

+ Net Oil and Gas Production reduced on 1 May 2014 to reflect 10% WI sale in relevant producing interests.

4. Lease Holdings

ProjectLease / UnitBasinDescriptionDepth LimitsTEX WI At 31 March 2014TEX WI
At 30 June 2014
RoyaltyGross AcresNet Acres
Fairway
*BOAPermianS12, Block 33, T-2S, A-1353; T&P RR Co Survey, Howard CoNone60%50%25%640.0320.0
*DarwinPermianS44, Block 33, T-1S, A-1292; T&P RR Co Survey, Howard CoNone60%50%25%640.0320.0
BunburyPermianS102 A-1405; S103 A-1405; S104 A-1495; Bl 29 W&NW RR Co, Howard CoNone60%60%25%918.0550.8
*BallaratPermianS 184 & 185, Bl 28, A-815 & A-A483; W&NW RR Survey, Glasscock CoNone60%50%25%355.7177.8
TareePermianS193, Bl 28, A-815 and A-A483; W&NW RR Co Survey, Glasscock CoNone60%60%25%320.0192.0
SydneyPermianS188 Block 29 A-170; W&NW RR Co Survey, Glasscock CoNone60%60%25%480.0288.0
UnnamedPermianS4, Block 32, T-2-S, A-1354; T & P RR Co Survey, Howard CoNone60%60%25%610.0366.0
*HomarPermianS24, Bl 35 A-1640; S26 Bl 35 A-1415; T&P RR Co Survey, Howard CoNone60%50%25%260.0130.0
*Wagga WaggaPermianS221, Block 29, A-496; W&NW RR Co Survey, Glasscock CoNone45%35%25%305.0106.8
Merta
Merta No. 1 Well Gas Unit No. 2Gulf CoastS3 A-219 International and Great Northern RR Co Survey, Wharton Co7,650 ft - 7,880 ft25%25%25.7%303.075.7
Section 28
SML #A-1, A-3 UnitGulf CoastSt Martin PhNone25%25%28%40.010.0
SML #A-2 UnitGulf CoastSt Martin PhNone25%25%28%40.010.0
E Chalkley
Unit Agreement: CK W RA SUGulf CoastS11, 13, 14 &15, T12S-R6W, Cameron Ph8,000 ft - 10,000 ft35%35%30.5%714.9250.2
* Changes effective 1 May 2014Total56262797.3

5. Corporate

5.1. Sale of 10% Interest in Fairway Project to Victory Energy

On 2 July 2014, Target Energy, through its wholly owned subsidiary TELA Garwood LP ("TELA Garwood"), confirmed the sale of a 10% working interest in its Fairway Project to Aurora Energy Partners ("Aurora"), a company associated with Victory Energy Corporation (OTCQX: VYEY).

A Purchase and Sale Agreement ("PSA") was signed by TELA Garwood and Aurora on 30 June 2014, with an effective date of 1 May 2014. In response to external delays in completing conveyancing of titles, the PSA split the closing of the sale into two parts.

  • The first part ("First Closing") was completed on 30 June 2014, with Aurora making an immediate payment of A$2.7m (US$2.5m) to TELA Garwood and in return TELA Garwood assigning to Aurora a 10% working interest in its Darwin, BOA and Wagga Wagga production leases and in various other leases.
  • Subject to the completion of the outstanding conveyancing items, the Second Closing is scheduled for 31 July 2014, at which time Aurora will pay the outstanding balance of A$3.5m (US$3.3m) to TELA Garwood and in return TELA Garwood will complete the balance of the assignments.
  • The total purchase price is A$6.2m (US$5.8m) after a reduction of US$0.2m in accordance with conditions of the sale.

Laurence Roe
Managing Director

NOTE: In accordance with ASX Listing Rules, any hydrocarbon reserves and/or drilling update information in this report has been reviewed and signed off by Mr Laurence Roe, B.Sc, Managing Director of Target Energy Limited, who is a member of the Society of Exploration Geophysicists and has over 30 years' experience in the sector. He consents to the reporting of that information in the form and context in which it appears.

CONTACT INFORMATION
Media Inquiries:
USA
Bradley Holmes
Target Investor Relations (Houston)
+1 713 304 6962 cell
+1 713 654 4009 direct

Laurence Roe
Target Energy
+1 713 275 9800 direct

Australia
Ross Dinsdale
Business Development Manager (Perth)
+61 429 702 970 cell
+61 8 9476 9000 direct

Victory Oilfield Tech, Inc. on 6ix

Earlier from Victory Oilfield Tech

Later from Victory Oilfield Tech

All Victory Oilfield Tech news releases