Stockpile and tailings evaluation underway at Linka Tungsten
Filed with ASX · · 5 pages · English
Summary by 6ix AI
Viking Mines Limited has announced the commencement of a field program at the Linka Tungsten Project to evaluate historical tailings and ore stockpiles. The program aims to assess the potential for reprocessing tailings as a low-cost supplemental feedstock and validate the high-grade potential of stockpiles. Advanced metallurgical testing is ongoing, with the goal of producing a premium concentrate from primary mineralization. The company plans to transition into a second phase of fieldwork later this month, which will include detailed mapping and trench sampling.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Story so far
Earlier from Viking Mines
- Viking commences trading on US OTC markets
- VKA gravity survey de-risks Linka & identifies targets
- Vikings Linka project achieves 63.6% WO3 concentrate
- Expanded Linka geophysics defines intrusive system
- Geophysical surveys identify priority targets at Linka
Later from Viking Mines
- Quarterly Report for the period ended 31 March 2026
- Conceptual process established for linka tungsten project
- Linka Tungsten project maiden drill campaign fully permitted
- Linka project - fieldwork identifies additional stockpiles
- Linka Metallurgy success delivers 62.5%WO3 at 59.8% recovery
Follow Viking Mines into a list and get an email when it puts out news.
Follow Viking Mines