UPDATED MINERAL RESOURCE ESTIMATE AND PRELIMINARY ECONOMIC ASSESSMENT ON THE CERRO CALICHE GOLD PROJECT, SONORA, MEXICO UTM NAD27 MEXICO ZONE 12N 536,540 m E AND 3,365,395 m N LONGITUDE 110°37'10" W AND LATITUDE 30°25' 12" N FOR SONORO GOLD CORP. NI 43-101 & 43-101F1 TECHNICAL REPORT Andrew Bradfield, P.Eng. Jarita Barry, P.Geo. Fred H. Brown, P.Geo. David Burga, P.Geo. D. Grant Feasby, P.Eng. Eugene Puritch, P.Eng., FEC, CET William Stone, Ph.D., P.Geo. P&E Mining Consultants Inc. Report 488 Effective Date: December 4, 2025 Signing Date: April 14, 2026 Table of Contents
EXECUTIVE SUMMARY 1
Property Location and Description 1
Accessibility, Climate, Local Resources, Infrastructure and Physiography 1
History 2
Geological Setting, Mineralization and Deposit Type 3
Exploration 3
Drilling 4
Sampling, Analyses and Data Verification 4
Mineral Processing and Metallurgy 5
Mineral Resource Estimate 5
Mining Methods 6
Recovery Methods 8
Project Infrastructure 9
Market Studies and Contracts 9
Environmental Studies, Permits and Social or Community Impacts 10
Capital and Operating Costs 10
Economic Analysis 12
Adjacent Properties 14
Risks and Opportunities 14
Conclusions 14
Recommendations 15
INTRODUCTION AND TERMS OF REFERENCE 16
Terms of Reference 16
Independent Site Visit 16
Effective Date 16
Sources of Information 17
Previous Technical Reports 17
Author Responsibilities 17
Units and Currency 18
RELIANCE ON OTHER EXPERTS 25
PROPERTY DESCRIPTION AND LOCATION 26
Location 26
Property Description and Mineral Tenure 27
Option Agreements 29
Cerro Caliche Concessions Option Agreement 29
Cabeza Blanca Concession Option Agreement 30
El Colorado Concession Option Agreement 31
Tres Amigos Concession Option Agreement 31
Rosario Concessions Option Agreement 32
Surface Rights 33
Mexican Mining Law 34
Environmental and Permitting 36
Environmental Liabilities 36
Required Permits and Status 37
Author Comments 37
ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY 38
Access 38
Climate 40
Infrastructure 41
Physiography 42
HISTORY 44
Sonoro Gold Corp. Company History 44
Prior Ownership 44
Project Historical Exploration and Development Results 46
Cambior Inc. Exploration (1990s) 47
Sidney Mining and Exploration (2000s) 47
Corex Exploration (2007 to 2008) 48
Paget Southern Resources (2011) 48
Historical Mineral Resource Estimates 48
Past Production 48
GEOLOGICAL SETTING AND MINERALIZATION 50
Regional Geology 50
Property Geology 52
Mineralization 54
Structural setting 54
Alteration 55
Significant Mineralized Vein Zones 56
Los Japoneses Zone (Including Cuervos, Boludito and Buena Vista) 58
Abejas, Veta del Oro, Rincon with Chinos NW and Chinos Altos Zones 60
Cabeza Blanca, Guadalupe, and El Colorado Zones 60
La Española Zone 63
DEPOSIT TYPE 64
Geological Deposit Model 64
Author Comments 66
EXPLORATION 67
Historical Exploration 67
Sonoro Exploration 67
Significant Results and Interpretation 72
Author Comments 73
DRILLING 74
Type and Extent 74
Historical Drilling Pre-2018 74
Sonoro Drilling 2018 to Present 74
Procedures 81
Historical Drilling 81
Collar Surveys 81
Down Hole Deviation Surveys 81
Logging 81
Sampling 81
Sonoro Drilling 82
Collar Surveys 82
Downhole Deviation Surveys 82
Logging 82
Sampling 83
SAMPLE Recovery 83
Sample Length Versus True Thickness 85
Summary of Drill Hole Locations and Intercepts 89
SAMPLE PREPARATION, ANALYSIS AND SECURITY 90
Historical Data 90
Cambior (1997) 90
Corex (2007 - 2008) 90
Paget (2011 - 2012) 95
Sonoro Sampling (2018 - 2021) 99
Sampling and Security 99
Reverse Circulation Drilling 99
Diamond Drilling 99
Sample Analyses 101
Bulk Density 101
2018-2021 Sonoro Quality Assurance/Quality Control Review 102
Performance of Certified Reference Materials 102
Performance of Blanks 106
Performance of Field Duplicates 107
Conclusions 108
DATA VERIFICATION 109
Database Verification 109
Database Validation 109
October 2025 Site Visit and Independent Sampling 109
Adequacy of Data 114
Conclusion 114
MINERAL PROCESSING AND METALLURGICAL TESTING 115
Metallurgical Test Programs 115
Interminera Metallurgical Program 115
Cyanide Test Column Results 116
Particle Size Distribution - Head Analysis 116
Size Distribution and Gold Content of Leach Tailings 118
Column Test Results 119
Conclusions and Recommendations from Interminera Program 122
McClelland Metallurgical Program 123
Bottle Roll Testing and Variability Testing Summary and Conclusions 125
Head Analysis Results and Cyanide Solubility Results 128
Bottle Roll Test Procedure and Results 130
Column Percolation Leach Test Procedures and Results 134
Summary and Conclusions 142
MINERAL RESOURCE ESTIMATES 143
Data Supplied 144
Economic Considerations 146
Mineralized Domains 146
Exploratory Data Analysis 147
Compositing 148
Treatment of Extreme Values 149
Continuity Analysis 149
Block Model 150
Bulk Density, Grade Estimation and Classification 150
Mineral Resource Estimate 151
Mineral Resource Sensitivity 152
Validation 154
MINERAL RESERVE ESTIMATES 156
MINING METHODS 157
Introduction 157
Pit Optimization 157
Pit Designs 160
Geotechnical Studies 161
Hydrogeological Studies 162
Mining Dilution and Mining Losses 162
Potentially Mineable Portion of the Mineral Resource 162
Open Pit Sequencing 163
Production Schedule 163
Open Pit Mining Practices 166
Drilling and Blasting 166
Loading and Hauling 167
Pit Dewatering 167
Auxiliary Pit Services and Support Equipment 167
Waste Material Storage 167
Support Facilities 168
Mining Manpower 168
RECOVERY METHODS 170
Summary 170
Plant Design 174
Design Criteria 174
Operating Schedule and Availability 175
16,000 tpd Process Plant Description 175
Primary Crushing Circuit 175
Primary Crushed Mineralized Material Stockpile and Reclaim 176
Secondary and Tertiary Crushing Circuit 176
Heap Leach Pad System and Solution Distribution 179
Carbon In Columns (CIC) Adsorption Circuit 179
Carbon Forwarding and Recovery Circuit 179
Reagent Handling and Storage 180
Assay and Metallurgical Laboratory 180
Water Supply 180
Domestic Services 180
