SLB LimitedNYSE: SLB

SLB N and Ormat Advance EGS Development with Data-Driven Site Selection in Nevada

· Issued by SLB Limited

Summary by 6ix AI

SLB and Ormat Technologies have selected Desert Peak in Nevada as the preferred location for a planned enhanced geothermal system (EGS) pilot, which creates or improves underground heat reservoirs to produce geothermal energy. The choice followed SLB's evaluation of multiple Ormat-operated geothermal fields across Nevada.

Key details

  • SLB compared the candidate sites using geological interpretation, geomechanical analysis (how rock behaves under stress) and development inputs.
  • The companies say Desert Peak was the strongest candidate based on technical potential and development practicality, and that it is close to existing infrastructure and has defined corridors for potential well placement between known structural features.
  • The next stage is an appraisal phase, with planned new magnetotelluric (underground electrical) and seismic surveys to build a 3D mechanical earth model, plus well placement and stimulation program design.
  • The work builds on the companies' October 2025 agreement to co-develop integrated geothermal assets and move EGS from pilot to commercial deployment.

What’s still pending

  • The pilot is planned, and the appraisal phase is still to refine the development concept and reduce remaining uncertainty.

6ix AI wrote this summary from the release below and checked it against the release.

Desert Peak selected following integrated subsurface and geomechanical evaluation across multiple geothermal fields

SLB and Ormat Technologies have selected Desert Peak in Nevada as the preferred location for a planned enhanced geothermal system (EGS) pilot, following a multi-site evaluation across existing geothermal fields.

Understanding subsurface conditions is critical to the successful industrialization of EGS activities. Early evaluation, modeling and simulation of subsurface conditions help reduce uncertainty because geology, stress conditions and heat distribution directly influence project feasibility and long-term reservoir performance.

SLB evaluated multiple Ormat-operated geothermal fields across Nevada using an integrated subsurface workflow. The approach combined geological interpretation, geomechanical analysis and development inputs to enable consistent comparison across candidate sites and address key EGS challenges, including stimulation efficiency, fluid flow consistency, parasitic losses, water loss, and geochemical complications.

Desert Peak emerged as the strongest candidate based on its combination of technical potential and development practicality. The site also benefits from proximity to existing infrastructure, along with defined corridors for potential well placement between known structural features.

With the site selected, the appraisal phase will further refine the development concept and reduce remaining uncertainty. Planned activities include new magnetotelluric and seismic surveys to support development of a 3D mechanical earth model for fracture, thermal, hydraulic and mechanical analysis, as well as optimized well placement and stimulation program design.

This approach reflects SLB and Ormat's view that a focus on structured, data-driven evaluation is needed to improve development predictability and reduce execution risk in complex geothermal environments, and to scale and industrialize EGS. The work builds on the companies' October 2025 agreement to co-develop integrated geothermal assets and progress EGS from pilot to commercial deployment.

SLB Limited on 6ix

Earlier from SLB

Later from SLB

All SLB news releases