Commodities

Sitka Files Technical Report

Vancouver, British Columbia--(Newsfile Corp. - July 10, 2026) - Sitka Gold Corp. (TSXV: SIG) (FSE: 1RF) (OTCQX: SITKF) ("Sitka" or the "Company") announces that it has filed a technical report on its 100% owned RC Gold Project in the Yukon Territory. The technical report, titled "RC Gold Project, NI 43-101 Technical Report, Dawson Mining District, Yukon Territory" is dated July 10, 2026 and has an effective date of February 25, 2026. The technical report is available on SEDAR+ (www.sedarplus.ca)

Sitka Gold Corp.July 10, 20266 min read
Sitka Files Technical Report

About this update from Sitka Gold Corp.

Vancouver, British Columbia--(Newsfile Corp. - July 10, 2026) - Sitka Gold Corp. (TSXV: SIG) (FSE: 1RF) (OTCQX: SITKF) ("Sitka" or the "Company")  announces that it has filed a technical report on its 100% owned RC Gold Project in the Yukon Territory. The technical report, titled "RC Gold Project, NI 43-101 Technical Report, Dawson Mining District, Yukon Territory" is dated July 10, 2026 and has an effective date of February 25, 2026. The technical report is available on SEDAR+ ( www.sedarplus.ca ) and on the Company's website at www.sitkagoldcorp.com . Mineral Resource Statement The RC Project hosts an indicated MRE of 1,291,000 ounces of gold and an inferred MRE of 3,829,000 ounces of gold (see Table A below) hosted within three at surface, road-accessible pit constrained deposits. The 60,000 metre drill program planned for 2026 is focused on expanding all three known deposits in addition to testing other high potential targets in close proximity to the current resources. To view an enhanced version of this graphic, please visit: https://images.newsfilecorp.com/files/6144/304852_ae215e6dd4b15b7e_001full.jpg * Notes for Blackjack Resources: 1. Mineral resource estimate prepared by Ronald G. Simpson of GeoSim Services Inc. with an effective date of January 21, 2025. 2. Mineral Resources are estimated consistent with CIM Definition Standards and reported in accordance with NI 43-101. 3. Mineral resources are not mineral reserves and do not have demonstrated economic viability. 4. Mineral resources are constrained by an optimized pit shell using the following assumptions: US$2000/oz Au price; a 45° pit slope; assumed metallurgical recovery of 85%; mining costs of US$2.00 per tonne; processing costs of US$10.00 per tonne; G&A of US$4.00/t. 5. The base case cut-off of 0.3 g/t Au is believed to provide a reasonable margin over operating and sustaining costs for open- pit mining and processing 6. Totals may not sum due to rounding. ** Notes for Rhosgobel and Eiger Resources: 1. Mineral resource estimate prepared by Ronald G. Simpson of GeoSim Services Inc. with an effective date of February 25, 2026 2. Mineral Resources are estimated consistent with CIM Definition Standards and reported in accordance with NI 43-101. 3. Mineral resources are not mineral reserves and do not have demonstrated economic viability. 4. Mineral resources are constrained by an optimized pit shell using the following assumptions: US$3000/oz Au price; a 45° pit slope; assumed metallurgical recovery of 85%; mining costs of US$2.50 per tonne; processing costs of US$14.00 per tonne; G&A of US$4.00/t. 5. The base case cut-off of 0.3 g/t Au is based on a gold price of US$2500/oz and believed to provide a reasonable margin over operating and sustaining costs for open-pit mining and processing 6. Totals may not sum due to rounding.

View stock analysis, news, and events for Sitka Gold Corp.

the CompanyRC Gold ProjectMineral ResourceSitkaMineral resource estimatetechnical reportYukon Territorymineral reservesRonald G. Simpsontungsten trioxide

More from Sitka Gold Corp.

All Sitka Gold Corp. news →