Shafter Major Permitting Secured
Filed with ASX · · 8 pages · English
Following completion of a detailed regulatory and administrative verification program, Black Bear Minerals (ASX: BKB; OTCQX: BKBMF) ("Black Bear Minerals" or "the Company") is pleased to confirm that all material permits referenced in a 2018 Preliminary Economic Assessment1 (PEA) of the Shafter Silver Project (“Shafter” or “the Project”) are valid, current, and transferable where required. The rev
Black Bear Minerals Limited on 6ix
Earlier from Black Bear Minerals
- Quarterly Activities/Appendix 5B Cash Flow Report
- Gold Strike Extended 280m from Drilling at Rebel Peak
- Drilling Commences at Shafter Silver Project
- High Grade Silver and Base Metals in Shafter Stockpiles
- Exceptional High-Grade Rock Chip Samples Outside Foreign MRE
Later from Black Bear Minerals
- High-Grade Silver Intercepted Outside Shafter MRE
- Black Bear Mineral - HIGH-GRADE SILVER INTERCEPTED OUTSIDE SHAFTER MRE
- Independence Project MRE Increased to 2.2Moz
- Ausenco Awarded Restart Studies & EFA Engagement
- Exceptional High-Grade Silver Results at Shafter Project
Follow Black Bear Minerals into a list and get an email when it puts out news.
Follow Black Bear Minerals