Scoping Study confirms potential for a new WA lithium mine
Filed with ASX · · 24 pages · English
• A Scoping Study for Liontown’s 100%-owned Kathleen Valley Lithium-Tantalum Project, located 680km north-east of Perth in Western Australia’s Northeastern Goldfields, demonstrates the potential for a viable standalone lithium mining and processing operation. • The Scoping Study is based on: o A robust Mineral Resource Estimate of 21.2Mt @ 1.4% Li2O and 170ppm Ta2O5 which is 75% Measured and Indic
Earlier from Liontown
- LTR maintains momentum at its hard-rock lithium projects WA
- Latest assays confirm mineralisation over 1.3km at Buldania
- Liontown expands prospective lithium footprint at Buldania
- Amended - Metallurgy results from Kathleen Valley
- Highly encouraging metallurgy results from Kathleen Valley
Later from Liontown
- 16,000m resource expansion drilling program commences
- Kathleen Valley Scoping Study Presentation - January 2019
- High-grade lithium in met drilling at Kathleen Valley
- Investor Presentation February 2019
- Further high grade assays from Kathleen Valley
Follow Liontown into a list and get an email when it puts out news.
Follow Liontown