SAM Survey Highlights New Targets Devon Gold Project Amended
Filed with ASX · · 47 pages · English
• The survey was designed to cover a structurally complex and strongly gold mineralised area SE of Devon, including Hill East. Previously reported drilling results intersected mineralisation at shallow depth including1: o 5m @ 4.01 g/t Au from 6m (20HERC001) o 9m @ 3.04 g/t Au from surface (20HERC002) o 6m @ 3.43 g/t Au from 15m (20HERC005) o 27m @ 2.04 g/t Au from 2m (20HERC032) o 4m @ 6.3 g/t Au
Story so far
Earlier from Matsa Resources
- SAM Survey Highlights New Targets at Devon Gold Project
- RIU Conference Presentation
- Drilling Identifies 2.4KM Gold Trend Lake Rebecca Proj.
- Receipt of AOP Shares - Lake Rebecca Project
- 31 December 2020 Quarterly Reports
Later from Matsa Resources
- Australian Energy Conference 17-18 March Presentation
- Renounceable Rights Issue Prospectus
- Initial High Grade Resource at Devon Lake Carey Gold Project
- Devon Pit Scoping Study Delivers Excellent Results
- Supplementary Prospectus
Follow Matsa Resources into a list and get an email when it puts out news.
Follow Matsa Resources