Tennessee Valley AuthorityNYSE: TVC

Rockland Resources Applauds Kairos-Google Advanced Nuclear Fission Partnership With TVA and its Relevance to Global Beryllium Usage

· Issued by Tennessee Valley Authority via TheNewswire

(TheNewswire)

    Vancouver, British Columbia – TheNewswire - August 20, 2025, RocklandResources Ltd. (the “Company” or "Rockland")CSE:RKL (OTCQB: BERLF) (FSE: GB2), congratulatesKairos Power and Google on their groundbreaking collaboration with theTennessee Valley Authority (TVA). This landmark agreement will seepower supplied from Kairos’s Hermes 2 Generation IV small modularreactor (SMR) to offset Google’s data center electricity demandbeginning in 2030.

    https://www.cnbc.com/2025/08/18/google-kairos-nuclear-smr-tennessee-valley-authority-tva-data-center-ai.html

    A Milestone for Advanced Nuclear Energy

    This agreement underscores several industry firsts:

    • First Commercial Gen-IV PPA– TVA becomes the first U.S. utility to contract power from a fluoride salt-cooled high-temperature reactor. 

    • Scaling Clean Energy for AI– Google will secure clean energy attributes for up to 50 MWe of firm, carbon-free baseload power to support its data centers. 

    • Accelerating Deployment– Hermes 2 is designed to deliver 50 MWe from a single unit, supported through the DOE’s Advanced Reactor Demonstration Program. 

    • Path to 500 MWe– This project is a step toward Google and Kairos’s broader commitment to bring 500 MWe of advanced nuclear online by 2035. 

    Critical Minerals: The Beryllium Connection

    • As new reactor designs move closer to deployment, demand for critical minerals like beryllium is set to grow. 

    • This breakdown illustrates the beryllium requirement per reactor when using FLiBe (LiF-BeF) salt as a coolant (1) (2): 

    ⚡ Test Reactor (35 MWt): ~1.8 t Be

    ⚡ Hermes-2 (2×35 MWt): ~3.6 t Be

    ⚡ Mid-scale FHR (~150 MWe): ~20–25 t Be

    ⚡ Large-scale FHR (~400 MWe): ~40–55 t Be

    • With global production hovering at ~330–400 tonnes per year, a single fleet of advanced reactors could represent a significant new source of demand. 

    Click Image To View Full Size

    For those of us in mining, energy, and criticalminerals, the message is clear: beryllium supply security will beessential to enabling next-generation clean energy.

    “At Rockland, we view this agreement as a pivotalmoment for advanced nuclear energy and critical minerals alike,”said Will Rascan, President of Rockland Resources. “Just as Kairosand Google are charting a path to decarbonize power for AI datacenters, Rockland is working on its portfolio of beryllium projectslocated in the premium world production Spor Mountain district ofUtah.”

    AboutBeryllium

    Beryllium is a high-value, essential, light metal withwide applications in the aerospace, computer, telecommunications,electronics, medical, satellite, clean energy, and defense sectors.Anticipated future needs for beryllium, as well the limitation ofhaving only a single source for US domestic use, places beryllium asboth a critical and a strategic mineral according to US governmentsources. 

    About RocklandResources Ltd. - Exploring For Tomorrow’s Technology

    Rockland Resources Ltd. CSE:RKL (OTCQB: BERLF) (FSE: GB2) is specializing in beryllium discovery and development at its strategically located Meteor, Beryllium Butte and Claybank projects in the Spor Mountain region of Utah, USA. Spor Mountain is home to Materion’s NYSE:MTRN Spor Mountain Mine, the largest beryllium producer in the world and continuously mined since 1969. In 2024 the Fraser Institute ranked Utah as the prime jurisdiction in the world for mining investment. Rockland has a unique position in its jurisdiction, properties in Spor Mountain, and arecently assembled team with a great depth in the exploration,recovery and marketing of beryllium. 

    The Company also holds a 100%-interest in the Cole GoldMine, located in the western portion of the prolific Red Lake golddistrict of Ontario.

    References:

     (1) https://www.nrc.gov/docs/ML2127/ML21272A383.pdf

     (2) https://www.energy.gov/ne/articles/kairos-power-wraps-molten-salt-testing-project

    On Behalf of the Board ofDirectors

    Michael England, CEO & Director

    For further information, pleasecontact:

    Mike England

    Email: mike@engcom.ca

    Neither the Canadian SecuritiesExchange nor itsRegulation Services Provider accepts responsibility for the adequacy or accuracy of this release.

    Copyright (c) 2025 TheNewswire - All rights reserved.