Rio Tinto PlcLSE: RIO

Third Quarter Operations Review 2026

· Issued by Rio Tinto Plc

Key figures

  • Lithium : Production up 33% YTD despite adverse weather impacting Q3 operations. Fenix 1B ramp-up continues to progress well.
  • Foreign exchange: At US$0.70/A$, the full-year impact to unit costs is around $1.0/t relative to the guidance assumption of US$0.67/A$.
  • China's domestic iron ore production declined 8% YoY in Q3, affected by flooding, safety inspections and scheduled maintenance.
  • LME aluminium averaged $3,226/t in Q3, 23% above the 2025 average but below the four-year high reached in Q2.
  • Lithium carbonate prices averaged around $19,000/t in Q3, supported by healthy demand amid announcements of potential supply restarts in Australia and Africa.

On 6ix: 6ix.com/news/rio-tinto-third-quarter-operations-review-2026

Notice to ASX/LSE ‌Rio Tinto releases third quarter 2026 production results

14 October 2026

Strong operational performance at Oyu Tolgoi copper and Pilbara iron ore

Rio Tinto Chief Executive Simon Trott said: "We delivered strong operational performance in the third quarter. Oyu Tolgoi copper production increased 29% year-to-date, with the operation running at a ~450 kt annualised rate in the quarter, and global iron ore sales are up 3% year-to-date. The Simandou iron ore mine hit an annualised production run-rate of ~10 Mtpa (100% basis) in the quarter as the project continues to ramp up.

"We are finishing the year with momentum, with significant opportunities to accelerate improvements in safety, productivity and reliability through implementation of our operating system. We remain on track for a $1.8 billion annualised productivity benefit run-rate by the end of 2026. Our major projects remain on schedule and budget, underwriting our growth profile to 2030.

"We made further significant steps in decarbonising our business in the third quarter, with our Pacific Aluminium smelter repowering arrangements now well progressed.

"Today, we announce that we have achieved more than $2 billion1 of capital release year-to-date, as we actively manage our portfolio with discipline to maximise long-term value, as part of the $5 to 10 billion capital release program."

  1. Executive Summary
    • Operational excellence: ~1% YTD increase in copper equivalent (CuEq2) production, driven by growth from Oyu Tolgoi copper and Pilbara iron ore.

    • Copper: Oyu Tolgoi production increased by 27% YoY in Q3 and 29% YTD. At Kennecott, we successfully completed the rebuild of the flash converting furnace at end-August ahead of plan.

    • Iron ore: Q3 global iron ore sales were 90.8 Mt, up 3% YoY, while Pilbara sales increased 2% YoY. Simandou hit an annualised production run-rate of ~10 Mtpa (100% basis) in Q3 as the project ramps up and remains on track to reach a 60 Mtpa production run-rate during H2 20283.

    • Aluminium: Consistent, stable performance across the full operating system. Pacific smelter repowering arrangements are now well progressed, following the Tomago and Bell Bay power agreements in Q3.

    • Lithium: Production up 33% YTD despite adverse weather impacting Q3 operations. Fenix 1B ramp-up continues to progress well.

      Production and sales4

      Q3 2026

      vs Q3 2025

      vs Q2 2026

      9 MTHS

      2026

      vs 9 MTHS

      2025

      2026

      guidance12

      Guidance

      status

      Copper production (consolidated basis)

      kt

      205

      0% -4%

      646

      +1%

      800 - 870

      Unchanged

      Global iron ore production5 (100% basis)

      Mt11

      89.7

      +2% +3%

      259.6

      +4%

      NA

      NA

      Pilbara iron ore production (100% basis)

      Mt11

      83.4

      -1% 0%

      245.7

      255.3

      +3%

      NA

      NA

      Global iron ore sales6 (100% basis)

      Mt11

      90.8

      +3% +2%

      +3%

      343 - 366

      Unchanged

      Pilbara iron ore sales7 (100% basis)

      Mt11

      85.7

      +2% 0%

      243.3

      +4%

      323 - 338

      Unchanged

      Bauxite production

      Mt

      15.7

      -4% +4%

      44.2

      -6%

      58 - 61

      Unchanged

      Alumina production8

      Mt

      2.1

      +10% +3%

      6.1

      +9%

      7.6 - 8.0

      Unchanged

      Aluminium production9

      Mt

      0.8

      -2% 0%

      2.52

      0%

      3.25 - 3.45

      Unchanged

      Lithium carbonate equivalent (LCE) production10

      kt

      13.0

      +4% -11%

      40.3

      +33%

      61 - 64

      Unchanged

      (at lower end)

      1 Announced year-to-date. Completion and cash receipt is subject to entry into binding agreements and satisfaction of conditions precedent. We remain on track to announce around $5 billion in total of capital release initiatives by end 2026. 2 Copper equivalent (CuEq) volume = Rio Tinto's share of production volume / Volume conversion factor x Product price ($/t) / Copper price ($/t). Prices are based on long-term consensus prices. 3 The estimated annualised capacity of approximately 60 million dry tonnes per annum iron ore for the Simandou life of mine schedule was previously reported in a release to the Australian Securities Exchange (ASX) dated 6 December 2023 titled "Investor Seminar Presentation". Rio Tinto confirms that all material assumptions underpinning that production target continue to apply and have not materially changed. 4 Rio Tinto share unless otherwise stated. 5 Iron Ore production for Pilbara operations and Iron Ore Company of Canada (IOC) refers to saleable production (after crushing, screening and beneficiation). For Simandou, it represents ore ready for train loading at the SimFer mine gate: final (tertiary) crushing of Simandou ore takes place in China. 6 Includes all shipments from Pilbara and IOC, including those to our Portside trading business; excludes shipments from our Portside trading business. It also includes Simandou sales. At our Dec-2025 Capital Markets Day, we announced the move to guide on global iron ore sales (100%): indicated sales ranges (all on 100% basis) - Pilbara of 323 - 338 Mt, IOC of 15 - 18 Mt and Simandou of 5 - 10 Mt. For the Simandou value chain to China: at full production targeting a ~75-to-90-day cycle, with customer collection up to a further 30 days (mine to recognised sales). 7 Pilbara iron ore sales range remains subject to the timing of approvals for planned mining areas and heritage clearances. 8 QAL production included on a 100% basis. 9 Includes primary aluminium only. 10 Year-to-date 2025 represents production since March following completion of the Arcadium acquisition. Q1 2025 LCE production was 5.6kt (6.5kt on a 100% basis); LCE shipments were 3.8kt (5.0kt on a 100% basis). 11 Wet metric tonnes. 12 See further notes in Section 2, 2026 guidance.

  2. ‌Guidance Production/sales guidance is maintained1. Unit cost guidance is maintained2, 3, 4.

    Notes for the quarter:

    • Pilbara iron ore unit cash costs: impacts from external factors

      • Diesel: Higher diesel prices increased unit costs by $0.9/t YTD vs 2025 YTD. Assuming the current spot price of ~$175/bbl for Q4, the full-year impact is expected to increase to $1.1/t.

      • Foreign exchange: At US$0.70/A$, the full-year impact to unit costs is around $1.0/t relative to the guidance assumption of US$0.67/A$.

        2026 Guidance

        Pilbara iron ore unit cash costs, free on board (FOB) basis - US$ per wet metric tonne

        23.5 - 25.03

        Copper C1 net unit costs (Kennecott, Oyu Tolgoi and Escondida) - US cents per lb

        30 - 504

        1 Guidance remains subject to weather impacts.

        2 There will be timing differences between market rates and realised diesel prices due to contractual arrangements.

        3 Subject to the impact of higher diesel prices and foreign exchange. Based on Australian dollar exchange rate of 0.67.

        4 Gold price assumption is $4,026/oz (spot price as at 30 June 2026).

  3. Group update Expenditure on exploration and evaluation
    • YTD pre-tax and pre-divestment expenditure on exploration and evaluation charged to the Income Statement was $692 million compared with $537 million in 2025. Approximately 50% of the spend was by the Copper product group, 28% by central exploration and other operations, and 22% by the Iron Ore product group.

    • Copper accounts for the majority of total expenditure on exploration and evaluation (included in the Copper product group and central exploration).

      Capital release

      We are systematically redeploying capital into higher-returning opportunities. To date, we have entered arrangements to release more than US$2 billion1 for redeployment through our capital allocation framework.

      This comprises:

      • In July, we signed an agreement with Yindjibarndi WaterCo for the proposed sale of the Dampier Seawater Desalination Plant in Western Australia.

      • We have agreed the sale of land in Kitimat, British Columbia, Canada, to LNG Canada for their Phase II project. Completion expected in Q4.

      • We have entered into a non-binding arrangement for a lithium sales contract with a pre-payment component.

      • We have completed a number of smaller non-core asset disposals as part of our ongoing portfolio optimisation.

      We are progressing other opportunities, with further announcements expected in 2026 as we deliver the initial

      ~$5 billion of the $5-10 billion capital release program announced at Capital Markets Day 2025.

      1 Announced year-to-date. Completion and cash receipt is subject to entry into binding agreements and satisfaction of conditions precedent.

      Middle East conflict

      Ongoing disruptions in the Middle East continued to drive volatility in energy and freight markets. Operational impacts to Rio Tinto remained limited, with no material disruption to production or outbound supply chains. Rio Tinto's fuel availability remained adequate, supported by inventory buffers and alternative sourcing.

      Conditions in the Strait of Hormuz remain highly volatile, and we continue to monitor developments and maintain contingency plans for further disruption.

  4. ‌Our markets

    Global economy: global growth moderated slightly through Q3 due to persistent geopolitical and energy market uncertainty. Developed market activity remained strong, supported by ongoing AI-linked investment and resilient manufacturing output.

    Chinese economy: domestic economic activity moderated in Q3, with strong export demand and manufacturing activity partly offset by weaker domestic consumption and investment. August's industrial production grew 5% YoY, driven by a 17% YoY increase in high-tech manufacturing. Policy support remained focused on infrastructure, including grid and AI development.

    US economy: growth remained resilient, supported by AI-related investment, broader business spending and consumer demand. Inflation remained elevated, prompting the Federal Reserve to raise interest rates by 25 basis points in September.

    Copper
    • London Metal Exchange (LME) copper reached a record high of $6.74/lb ($14,850/t) in mid-August, supported by constrained mine supply, strong investor flows and optimism around AI-driven electricity demand. Prices averaged $6.40/lb ($14,110/t) for the quarter.

    • Copper mine supply remained constrained during Q3, with major storms in Chile adding to existing supply challenges. DRC production remained relatively resilient despite concerns around sulphur and sulphuric acid availability.

    • Uncertainty around potential US tariffs on refined copper cathode imports persisted through Q3, sustaining a premium between Chicago Mercantile Exchange (CME) and LME prices and driving continued US imports above underlying demand.

    • The copper concentrate market remained extremely tight in Q3, with spot treatment and refining charges ending the quarter at a record low of -$267/t. High sulphuric acid prices are helping to offset pressure on smelter economics.

      Iron ore
    • During Q3, iron ore prices were sustained in a narrow band around their $97/dmt 61% delivered (CFR) average. Higher seaborne freight costs compressed producer netbacks, particularly for longer haul Atlantic supply. Seaborne lump premiums rebounded by 33% QoQ, realigning to long-term historical average levels and the marginal cost of sintering in China.

    • China's finished steel consumption is estimated to have declined ~4% QoQ and ~2% YoY in Q3, while steel exports increased 3% YoY to a 122 Mt annualised rate, partly offsetting weaker domestic demand and supporting crude steel and pig iron production.

    • Seaborne iron ore supply declined 1% QoQ in Q3 in response to elevated operating and freight costs putting pressure on marginal supply. Of note, long-haul shipments outside Australia and Guinea declined by an estimated 8% MoM in September.

    • China's domestic iron ore production declined 8% YoY in Q3, affected by flooding, safety inspections and scheduled maintenance.

      Aluminium
    • LME aluminium averaged $3,226/t in Q3, 23% above the 2025 average but below the four-year high reached in Q2.

    • Middle East supply saw some recovery through Q3, with most of the smelting capacity curtailed earlier in the year remaining offline, while Chinese production remained close to its 45 Mt capacity cap.

    • The global aluminium market remained in deficit as ex-China demand showed early signs of recovery and reported inventories continued to decline. Regional physical premiums remained elevated, reflecting constrained metal availability and higher freight costs.

    • Australian FOB alumina prices increased 8% during Q3 to $355/t as the ex-China market tightened, while Chinese bauxite CIF prices remained supported by elevated Capesize freight costs.

      Lithium
    • Lithium carbonate prices averaged around $19,000/t in Q3, supported by healthy demand amid announcements of potential supply restarts in Australia and Africa.

    • Battery energy storage systems (BESS) remained the strongest source of lithium demand growth, with global shipments increasing 94% YoY in the first eight months of 2026 to an annualised rate of around 1,050 GWh. Total EV sales have moderated as policy support in China and North America continues to unwind.

    • Lithium demand is gaining further support from larger battery packs across vehicle models and strong growth in commercial EVs.

      Index prices

      Start of Q3 (01/07/26)

      End of Q3 (30/09/26)

      % change Start - end Q3

      Q2 2026

      average

      Q3 2026

      average

      % change

      QoQ

      Iron ore ($/dmt CFR China, 61% index)1

      98

      93

      (5)%

      105

      97

      (8)%

      Iron ore ($/dmt CFR China, 65% index)2

      113

      108

      (4)%

      122

      113

      (7)%

      Copper (LME spot, c/lb)

      597

      657

      +10 %

      605

      640

      +6 %

      Aluminium (LME spot, $/t)

      3,075

      3,204

      +4 %

      3,571

      3,226

      (10)%

      Lithium carbonate (spot, $/t CIF China, Japan & Korea)3

      20,250

      16,850

      (17)%

      22,043

      19,022

      (14)%

      1 Monthly average Platts (CFR) index for 61% iron fines from 1 January 2026.

      2 Fastmarkets Iron ore 65% Fe Brazil-origin fines, CFR Qingdao, $/dmt.

      3 Fastmarkets index for Lithium carbonate min 99.5% Li2CO3 battery grade.

  5. ‌Copper

    Rio Tinto production1 ('000 tonnes)

    Q3 2026

    vs Q3 vs Q2

    2025 2026

    9 MTHS

    2026

    vs 9 MTHS

    2025

    Copper

    Kennecott - Refined metal2

    12

    -10% -43%

    66

    -31%

    Escondida - Metal in concentrates

    63

    -29% -17%

    216

    -18%

    Escondida - Refined metal

    16

    +18% -18%

    53

    +25%

    Oyu Tolgoi - Metal in concentrates

    114

    +27% +17%

    312

    +29%

    Total copper production (consolidated basis1)

    205

    0% -4%

    646

    +1%

    1 Includes Oyu Tolgoi and Kennecott on a 100% consolidated basis, and Escondida on an equity share basis.

    2 We continue to process third party concentrate to optimise smelter utilisation, including 5 thousand tonnes of cathode produced from purchased concentrate in Q3 2026, and 25 thousand tonnes YTD. Purchased and tolled copper concentrates are excluded from reported production figures and guidance. Sales of cathodes produced from purchased concentrate are included in reported revenues.

    Kennecott

    • Q3:
      • After the flash converting breach in late June 2026, we successfully completed the rebuild -over approximately 70 days - at the end of August and the furnace has since returned to normal capacity. The outage drove lower cathode production in Q3.

      • Mined copper production increased QoQ on higher throughput, as Q2 was impacted by planned concentrator maintenance and a three-day safety stand-down in April. Grades and recoveries also increased.

      • As previously disclosed, geotechnical management activities in the open pit are ongoing to restore access to the planned mining areas.

      • Molybdenum production is expected to fall as planned through the rest of 2026 and into 2027 as the open-pit mining sequence moves into lower-molybdenum-bearing material, while gold production is expected to increase due to higher grades and recovery rates.

        • YoY:
          • Lower cathode production due to the flash converting furnace breach, with mined copper converted into matte and accumulated ahead of the flash converting furnace for subsequent processing to cathode. Note: Q3 2025 production was weak, impacted by a 45-day planned smelter shutdown which commenced in early September.

          • Higher mined copper due to the timing of the annual concentrator shutdown which occurred in the third quarter in 2025 versus the second quarter in 2026.

            Escondida
        • Q3: lower concentrate production, reflecting lower throughput caused by scheduled maintenance, a safety stand-down following a fatal incident, planned lower concentrate feed grades and severe weather disruptions.

        • YoY: lower concentrate production also reflected planned lower feed grades in line with mine sequence, scheduled maintenance, the safety stand-down and severe weather disruptions, partially offset by higher refined copper production.

          Oyu Tolgoi
        • Q3: increase in production driven by the continued ramp up of underground operations with higher recoveries.

        • YoY: increase in production driven by the ramp up of underground operations, higher ore grades and improved recovery rates. Q3 2025 was impacted by a planned concentrator shutdown; the equivalent shutdown this year occurred in Q2.

        • Open pit update: we have recently completed the latest phase of mining in a high gold-grade area of the pit and the next planned phases of the open pit mine sequence contain lower gold grades for the rest of 2026 and into 2027.

        • In June 2026, the Government of Mongolia agreed to commence work on resolution of the Entrée licence transfer for Panel 1. As this remains in progress, we continue to advance Panels 0 and 2 North followed by Panel 2 South. Panel 1 is expected to be the final panel brought into production. Mine plan options will continue to be assessed and optimised as appropriate.

        • As part of the periodic review required under the Shareholders Agreement, we formally signed the previously agreed adjustment to the Oyu Tolgoi shareholder loan interest rate during Q3.

        • Production ramp-up remains on track to reach an average of around 500 thousand tonnes of copper per year (100% basis and stated as recoverable metal) from 2028 to 20361, inclusive of ongoing sustaining capital expenditure associated with ramp-up activities.

      1 The ~500 thousand tonnes per annum copper production target (stated as recoverable metal) for the Oyu Tolgoi underground and open pit mines for the years 2028 to 2036 was previously reported in a release to the ASX dated 11 July 2023 "Investor site visit to Oyu Tolgoi copper mine, Mongolia". All material assumptions underpinning that production target and those production profiles continue to apply and have not materially changed.

  6. ‌Iron Ore Pilbara operations

    Rio Tinto share of production (Wet million tonnes)

    Q3 2026

    vs Q3 vs Q2

    2025 2026

    9 MTHS

    2026

    vs 9 MTHS

    2025

    Pilbara Blend and SP10 Lump1

    23.2

    -3% -1%

    69.0

    +4%

    Pilbara Blend and SP10 Fines1

    32.9

    -1% +1%

    96.8

    +3%

    Robe Valley Lump

    1.6

    -2% -5%

    4.9

    0%

    Robe Valley Fines

    2.3

    +19% -6%

    6.8

    +10%

    Yandicoogina Fines (HIY)

    11.2

    +3% +3%

    32.4

    +4%

    Total Pilbara production

    71.2

    -1% 0%

    209.9

    +3%

    Total Pilbara production (100% basis)

    83.4

    -1% 0%

    245.7

    +3%

    Rio Tinto share of sales (Wet million tonnes)

    Q3 2026

    vs Q3 vs Q2

    2025 2026

    9 MTHS

    2026

    vs 9 MTHS

    2025

    Pilbara Blend Lump

    17.6

    0% -1%

    50.4

    +31%

    Pilbara Blend Fines

    33.0

    -1% -1%

    94.3

    +28%

    Robe Valley Lump

    1.3

    0% -12%

    4.0

    +3%

    Robe Valley Fines

    2.5

    +12% -14%

    7.7

    +8%

    Yandicoogina Fines (HIY)

    11.3

    +5% 0%

    31.0

    +1%

    SP10 Lump1

    3.4

    +16% +47%

    8.5

    -56%

    SP10 Fines1

    5.2

    +64% +83%

    11.7

    -57%

    Total Pilbara sales2

    74.3

    +4% +3%

    207.7

    +4%

    Total Pilbara sales (100% basis)2

    85.7

    +2% 0%

    243.3

    +4%

    Total Pilbara sales (consolidated basis)2, 3

    76.2

    +4% +3%

    213.4

    +4%

    Production figures are sometimes more precise than the rounded numbers shown, hence small rounding differences may appear.

    1 SP10 includes other lower grade products.

    2 Sales includes material shipped from the Pilbara to our portside trading facility in China which may not be sold onwards by the group in the same period.

    3 While Rio Tinto has a 53% net beneficial interest in Robe River Iron Associates, it recognises 65% of the assets, liabilities, sales revenues and expenses in its accounts (as 30% is held through a 60% owned subsidiary and 35% is held through a 100% owned subsidiary). The consolidated basis sales reported here include Robe River Iron Associates on a 65% basis to enable comparison with revenue reported in the financial statements.

    • Q3 production: strong mine performance continued through Q3 supported by ongoing productivity initiatives.

    • Q3 sales: +2% YoY, supported by mine performance and sustained healthy port inventories.

      • Port outload capacity will be impacted during some quarters in 2027 and 2028 with several scheduled major capital projects underway (including Parker Point reclaimers) to improve system flexibility and prepare for the Rhodes Ridge project.

    • Q3 sales: 9% of sales priced by reference to the prior quarter's average index lagged by one month:

      • Remainder sold either on current quarter average, month average or on the spot market.

      • 26% of sales were made on a free on board (FOB) basis, with remainder sold including freight.

    • Q3 portside sales in China: 4.7 Mt (4.9 Mt in Q3 2025)

      • 71% of our portside sales were either screened or blended in Chinese ports.

      • End-September inventory levels at portside were 3.7 Mt, including 2.4 Mt of Pilbara product.

        Iron Ore Company of Canada (IOC)

        Production and sales (Wet million tonnes)

        Q3 2026

        vs Q3 vs Q2

        2025 2026

        9 MTHS

        2026

        vs 2025

        Pellets and concentrate production (Rio Tinto Share)

        2.2

        -5% +30%

        6.0

        -16%

        Pellets and concentrate production (100%)

        3.8

        -5% +30%

        10.2

        -16%

        Pellets and concentrate sales1 (100%)

        3.8

        -6% +20%

        10.2

        -14%

        1 Sales includes material shipped from IOC to our portside trading facility in China which may not be sold onwards by the group in the same period.

    • Q3 production: up 30% QoQ (down 5% YoY). Operational focus remains on progressively improving pit health. This has been supported by mine sequencing and an increase in total material movement.

    • Q3 sales: up 20% QoQ (down 6% YoY) reflecting higher concentrator feed and a return to normal in-load rates at the port following the ore dumper replacement.

      Simandou

      Production and sales (Wet million tonnes)

      Q3 2026

      vs Q3 vs Q2

      2025 2026

      9 MTHS

      2026

      vs 2025

      Fines production (Rio Tinto share)1,2

      1.1

      NA +273%

      1.7

      NA

      Fines production (100%)1,2

      2.5

      NA +273%

      3.7

      NA

      Fines shipped (100%)

      2.2

      NA +36%

      4.4

      NA

      Fines sales (100%)

      1.3

      NA +210%

      1.7

      NA

      1 Simandou production represents ore ready for train loading at the SimFer mine gate.

      2 2.3 Mt (100% SimFer) of crushed iron ore (1 Mt, Rio Tinto share) was produced in 2025 and was recorded for the first time in Q4 2025, some of which required reprocessing in 2026.

    • Q3 production: a ~10 Mtpa (100%) production run-rate was achieved in Q3. Fixed-plant commissioning and operational readiness continued to progress as planned, supporting the transition to permanent plant infrastructure in Q4.

    • Stockpiles: as at the end of September, 7.9 Mt of uncrushed ore was stockpiled at the mine, which contributes to 11.1 Mt across the entire system including the Guinean port, on ships and in China ports.

    • Q3 sales: 2.2 Mt (100%) was shipped to China and sales totalled 1.3 Mt.

      • Simandou value chain to China: at full production targeting a ~75-to-90-day cycle, with customer collection up to a further 30 days (mine to recognised sales).

  7. ‌Aluminium & Lithium Aluminium

    Rio Tinto share of production ('000 tonnes)

    Q3 2026

    vs Q3 vs Q2

    2025 2026

    9 MTHS

    2026

    vs 9 MTHS

    2025

    Bauxite

    15,745

    -4% +4%

    44,225

    -6%

    Bauxite third party shipments1

    11,574

    -2% +9%

    31,409

    -5%

    Alumina2

    2,071

    +10% +3%

    6,111

    +9%

    Aluminium

    842

    -2% 0%

    2,518

    0%

    Recycled aluminium

    69

    +3% -1%

    200

    -4%

    1 Reminder: Sangaredi's third-party bauxite shipments for 2025 and Q1 2026 were restated following a reclassification between internal and third-party shipments. This has no impact on total bauxite shipments.

    2 As stated in our Q1 2026 report, we have included QAL on a 100% basis from 2026.

    Bauxite
    • Q3: production increased 4% QoQ, as Weipa operations continued to recover from the Q1 weather disruption, partially offset by timing of a major maintenance on the off-loading line (10 days) at CBG (Sangaredi) in Guinea. Production was 4% lower YoY, primarily reflecting planned shutdowns at Weipa in August.

      Alumina
    • Q3: production increased 3% QoQ, with reliability improving at QAL, Yarwun and Vaudreuil. Production increased 10% YoY, primarily reflecting QAL being reported on a 100% basis from 2026.

    • Yarwun production is expected to reduce by 40% in Q4 2026, as announced in November 2025, due to tailings constraints. The change is expected to reduce annual production by approximately

      1.2 Mt and extend the refinery life to 2035.

      Aluminium
    • Q3: production was stable QoQ (down -2% YoY) with the completion of the planned Arvida smelter closure offset by improved performance across the remaining portfolio.

      • Kitimat: production increased YoY as the smelter operated at higher pot and amperage levels, supported by improved underlying performance and reservoir levels.

      • Boyne: production increased YoY, reflecting improved operating stability and higher output.

      • AP60 and Arvida: AP60 continued to ramp up, while the final Arvida potlines closed in June 2026 as planned.

    • Pacific smelter repowering arrangements: now well progressed, following the Tomago and Bell Bay power agreements in Q3 (see further details on page 18).

      Tariffs
    • Q3: all produced metal was shipped, with sales pricing, product mix and shipping destinations flexed to optimise outcomes in a changing market environment.

      H1 2026

      Q3 2026

      Total RTA shipments - US destination, kt1

      585

      255

      Total RTA tariff cost, $m

      773

      430

      Average mid-west premium duty paid2, $/tonne

      2,406

      2,420

      Average realised tariff costs - US destination, $/tonne

      1,322

      1,685

      1 Including both tariff impacted and exempt products.

      2 Mid-west premium duty paid applies to approximately 32% of our total volumes in Q3 2026.

      Recycled aluminium
    • Q3: recycled aluminium production was broadly stable QoQ and increased 3% YoY. Improved output at the remaining US facilities more than offset lower Canadian production. YTD volumes remained 4% below 2025, reflecting the closure of the Canton, Ohio facility in mid-2025 as part of the reshaping of the downstream portfolio.

      Lithium

      Rio Tinto share of production ('000 tonnes)

      Q3 2026

      vs Q3 vs Q2

      2025 2026

      9 MTHS

      2026

      9 MTHS vs 9 MTHS

      2025 2025

      Lithium carbonate

      12.2

      +9% -12%

      38.4

      26.7 +44%

      Lithium hydroxide

      5.8

      -4% +9%

      16.6

      13.3 +25%

      Spodumene

      0.0

      NA NA

      0.0

      9.1 NA

      Other specialities (LCE)

      1.2

      -32% +11%

      3.0

      3.4 -10%

      Total lithium carbonate equivalent (LCE) production1,2

      13.0

      +4% -11%

      40.3

      30.4 +33%

      1 The lithium value chain is vertically integrated and as a result production volumes are not additive. Lithium Carbonate Equivalent (LCE) is derived from volumes of lithium carbonate, lithium chloride, and spodumene concentrate. These compounds are used as feedstock in downstream production.

      2 Year-to-date 2025 represents production since March following completion of the Arcadium acquisition. Q1 2025 LCE production was 5.6kt (6.5kt on a 100% basis); LCE shipments were 3.8kt (5.0kt on a 100% basis).

    • Q3: impacted by planned maintenance and weather.

      • Olaroz: production was affected by planned annual maintenance and lower lithium concentration in the ponds following weather events.

      • Fenix: line 1B ramp-up is progressing well. Planned annual maintenance on Lines 0 and 1A, and severe weather in July, affected production during the quarter.

      • Sal de Vida: ramp-up is progressing slower than anticipated due to available uptime of key equipment.

    • YTD: 2025 YTD reflects Mt Cattlin in operation in Q1 2025 (now in care and maintenance since end of March 2025).

    • To note: full year production expected at the low end of the guidance range, primarily reflecting the slower ramp-up at Sal de Vida.

  8. ‌Borates and TiO2

    Rio Tinto share of production ('000 tonnes)

    Q3 2026

    vs Q3 vs Q2

    2025 2026

    9 MTHS

    2026

    vs 9 MTHS

    2025

    Borates - B2O3 content

    132

    +3% -4%

    396

    +5%

    Titanium dioxide slag - TiO2

    217

    -17% -4%

    662

    -12%

    We are advancing our strategic reviews and are actively testing the market for our Borates business and evaluating options for Rio Tinto Iron & Titanium.

    Borates
    • Q3: delivered solid production supported by continued strong market conditions.

      Iron & Titanium
    • Q3: continued to align production with market demand, operating six (of nine) furnaces in Quebec and three (of four) furnaces at Richards Bay Minerals.

  9. ‌Capital Projects

    Project Copper

    Project: Kennecott open pit extension

    Location: Utah, United States

    Total capital cost

    (100% unless

    otherwise stated) Status/Milestones

    $1.8bn • Stripping will continue through 2027 with sustainable ore

    Ownership: Rio Tinto (100%)

    Approval: 2019

    To note: The project scope includes mine

    stripping activities and some infrastructure

    development, including tailings facility

    expansion. The project will allow mining to

    continue into a new area of the orebody

    between 2026 and 2032.

    Project: Kennecott North Rim Skarn

    $0.6bn

    (NRS) underground development1

    ramp-up, with improving stope availability and higher ore

    movement through the quarter, while development advanced into

    Location: Utah, United States

    more favourable ground conditions.

    Ownership: Rio Tinto (100%)

    Capacity: around 250 kt through to 20332

    sequence and potential impacts are being assessed following an

    Approval: June 2023

    external geotechnical review.

    First production: Achieved Q4 2025

    To note: Original approval for $0.5bn with

    a further $0.1bn approved in December

    2024 for additional infrastructure and

    geotechnical controls.

    Iron ore

    Project: Brockman (Brockman Syncline 1)

    $1.8bn

    package, the administration building, awarded in July 2026.

    Location: WA, Australia

    Ownership: 100%

    and module delivery management.

    Capacity: 34 Mtpa

    Approval: March 2025

    Planned first production: 2027

    To note: The project is to extend the life

    of the Brockman regions in WA.

    Project: Hope Downs 2 (incl. Bedded

    $0.8bn

    Hilltop)

    (Rio Tinto share)

    civil works, haul roads and non-process infrastructure.

    Location: WA, Australia

    Great Northern Highway realignment opening.

    Ownership: Rio Tinto (50%) and Hancock

    Prospecting (50%)

    Capacity: 31 Mtpa

    Approval: June 2025

    Planned first production: 2027

    To note: The project is to extend the life

    of the Hope Downs 1 operation in WA.

    Project: West Angelas Sustaining

    $0.4bn

    (Rio Tinto share)

    Location: WA, Australia

    services contractors mobilised to site in Q3 2026.

    Ownership: Rio Tinto (53%), Mitsui Iron

    Ore (33%) and Nippon Steel (14%)

    Capacity: 35 Mtpa

    Approval: October 2025

    Planned first production: 2027

    To note: The project is to extend the life

    of the West Angelas hub in WA.

    • Through to early September, underground production continued to

    • A seismic event occurred on 10 September. The mine plan

    • Bulk earthworks progressed, with the final supporting infrastructure

    • Critical path items advancing, focus shift to construction execution

    • First production remains on track for 2027.

    • Construction remains ahead of plan, with strong progress across

    • Key infrastructure delivered - Hope Downs 2 Satellite Facility,

    • First production from haulage remains on track for 2027.

    • Construction activities progressed in line with plan.

    • All major contracts awarded with non-process infrastructure and

    • First production remains on track for 2027.

    production from the second phase of the pushback expected to be reached in H2 2027.

    Iron ore

    Project: Simandou

    Location: Guinea, Africa

    SimFer mine ownership: SimFer (85%), Government of Guinea (GoG) (15%) SimFer mine capacity: 60 Mtpa3 (27 Mtpa RT share)

    Approval: July 2024

    Start date: first shipment in December 2025

    To note: Investment in the Simandou high-grade iron ore project in Guinea in partnership with CIOH, a Chinalco-led consortium (the SimFer joint venture) and co-development of the rail and port infrastructure with Winning Consortium Simandou4 (WCS), Baowu and the Republic of Guinea (the partners) for the export of up to 120 Mtpa of iron ore mined by SimFer's and WCS's respective mining concessions.5 The SimFer joint venture6 will develop, own and operate a 60 Mtpa3 mine in blocks 3 & 4. WCS will construct the project's ~536 kilometre shared dual track main line, a 16 kilometre spur connecting its mine to the mainline as well as the WCS barge port, while SimFer will construct the ~70 kilometre spur line, connecting its mining concession to the main rail line, and the transhipment vessel (TSV) port.

    Aluminium

    $6.2bn (Rio Tinto share)

    • Ore continues being railed from the SimFer mine to the main rail line via the SimFer rail spur and shipped through the WCS port while construction of the SimFer port is finalised. Commissioning of key infrastructure remains targeted through 2026, supporting ramp up towards full production rates during H2 2028.

    • Non-managed infrastructure - our partners confirm that construction is progressing well and is on track.

    • SimFer mine is progressing to plan, with ~84% completed - bulk earthworks and permanent facilities construction continues, with load commissioning and first ore through one of the two primary crushers expected in Q4 2026.

    • SimFer rail infrastructure locomotive fleet continuing to expand inline with plan to support production ramp-up.

    • SimFer port and marine infrastructure continue to progress to plan with 92% completed - fabrication and assembly of trans-shipment vessels advancing with the first vessel arriving into Guinea late in the quarter. As part of commissioning activities, first ore through the Simfer port is expected in Q4 2026.

    • Workforce across all the SimFer scope of mine, rail and port is 17,430 with 75% Guinean participation.

      Project: Low-carbon AP60 aluminium smelter

      Location: Quebec, Canada

      Ownership: Rio Tinto (100%)

      Capacity: Project will add 96 new AP60 pots, increasing AP60 capacity by 160,000 tonnes of primary aluminium per annum Approval: June 2023

      Start date: First hot metal achieved in March 2026.

      To note: The investment includes up to

      $113 million of financial support from the Quebec government. This new capacity is expected to be in addition to 30,000 tonnes of new recycling capacity at Arvida, which has been rescheduled to open in H1 2027.

      Lithium

      Project: Rincon expansion

      Location: Salta province, Argentina Ownership: Rio Tinto (100%) Capacity: 60ktpa (battery grade lithium carbonate)

      Approval: December 2024

      Planned first production: 2028 with three-year ramp-up to full capacity

      To note: Project consists of the 3ktpa starter plant and 57ktpa expansion program. The mine is expected to have a 40-year7 life and operate in the first quartile of the cost curve.

      $1.5bn • Construction is nearing completion and demobilisation is

      underway.

      • Pot commissioning and ramp-up will continue through 2026, with full capacity targeted during 2027.

        $2.5bn • Construction is progressing across key areas, including major

        earthworks, concrete, tanks, and supporting infrastructure. The camp expansion is substantially complete, and first powerline has been energised.

      • First production remains on track for 2028.

    Lithium

    Project: Nemaska Lithium

    $1.1bn

    (Rio Tinto share)

    construction activity remains at reduced levels, while asset

    Location: Quebec, Canada

    preservation and site integrity activities continue.

    Ownership: Rio Tinto (53.9%) and

    Government of Québec (46.1%).

    alternatives continues with our partners, with a decision expected

    Capacity: 28ktpa LCE (100%)

    in Q4 2026.

    First production: planned in 2028

    To note: product is integrated lithium

    hydroxide.

    Iron & Titanium

    Project: Zulti South

    $0.35bn

    Location: Richards Bay, South Africa

    (Rio Tinto share)

    Ownership: Rio Tinto (74%), Blue

    Horizon Investments (24%) and Employee

    Share Participation Trust (ESPS) (2%)

    Capacity: Extend mine life to 2050

    Approval: March 2026

    Planned first production: Q4 2028

    To note: Construction commenced in H1

    2026 and will take 30 months to be

    completed with initial commercial

    production expected in Q4 2028. This first

    phase will support Richards Bay Mineral's

    (RBM's) supply of zircon and ilmenite,

    while the second phase will follow as part

    of the long-term development strategy.

    • Following the in-depth review of the Bécancour project,

    • The strategic review of the Whabouchi and Galaxy development

    • Early construction and site establishment continue to advance.

    1. The NRS Mineral Resources and Ore Reserves, together with the Lower Commercial Skarn (LCS) Mineral Resources and Ore Reserves, form the Underground Skarns Mineral Resources and Ore Reserves.

    2. The 250 thousand tonne copper production target for the Kennecott underground mines over the years 2023 to 2033 was previously reported in a release to the Australian Securities Exchange (ASX) dated 20 June 2023 "Rio Tinto invests to strengthen copper supply in US". All material assumptions underpinning that production target continue to apply and have not materially changed.

    3. The estimated annualised capacity of approximately 60 million dry tonnes per annum iron ore for the Simandou life of mine schedule was previously reported in a release to the Australian Securities Exchange (ASX) dated 6 December 2023 titled "Investor Seminar Presentation". Rio Tinto confirms that all material assumptions underpinning that production target continue to apply and have not materially changed.

    4. WCS is the holder of Simandou North Blocks 1 & 2 (with the Government of Guinea holding a 15% interest in the mining vehicle and WCS holding 85%) and associated infrastructure. WCS was originally held by WCS Holdings, a consortium of Singaporean company, Winning International Group (50%) and Weiqiao Aluminium (part of the China Hongqiao Group) (50%). On 19 June 2024, Baowu Resources completed the acquisition of a 49% share of WCS mine and infrastructure projects with WCS Holdings holding the remaining 51%. In the case of the mine, Baowu also has an option to increase to 51% during operations. During construction, SimFer will hold 34% of the shares in the WCS infrastructure entities with WCS holding the remaining 66%.

    5. WCS holds the mining concession for Blocks 1 & 2, while SimFer holds the mining concession for Blocks 3 & 4. SimFer and WCS will independently develop their mines.

    6. SimFer Jersey Limited is a joint venture between the Rio Tinto Group (53%) and Chalco Iron Ore Holdings Ltd (CIOH) (47%), a Chinalco-led joint venture of leading Chinese SOEs (Chinalco (75%), Baowu (20%), China Rail Construction Corporation (2.5%) and China Harbour Engineering Company (2.5%)). SimFer S.A. is the holder of the mining concession covering Simandou Blocks 3 & 4, and is owned by the Guinean State (15%) and SimFer Jersey Limited (85%). SimFer Infraco Guinée S.A. will deliver SimFer's scope of the co-developed rail and port infrastructure, and is co-owned by SimFer Jersey (85%) and the Guinean State (15%). SimFer Jersey will ultimately own 42.5% of La Compagnie du Transguinéen, which will own and operate the co-developed infrastructure during operations.

    7. The production target of approximately 53 kt of battery grade lithium carbonate per year for a period of 40 years was previously reported in a release to the ASX dated 4 December 2024 titled "Rincon Project Mineral Resources and Ore Reserves: Table 1". Rio Tinto confirms that all material assumptions underpinning that production target continue to apply and have not materially changed. Plans are in place to build for a capacity of 60 kt of battery grade lithium carbonate per year with debottlenecking and improvement programs scheduled to unlock this additional throughput. Capacity of 60ktpa is comprised of 3ktpa starter plant, 50ktpa full scale plant and 7ktpa additional optimisation.

  10. ‌Future Projects

    Project Status

    Copper: Resolution

    Location: Arizona, US

    Ownership: Rio Tinto (55%), BHP (45%)

    To note: proposed underground copper mine in the Copper Triangle, in Arizona.

    Copper: Winu Location: WA, Australia

    Ownership: Rio Tinto (70%), Sumitomo Metal Mining (SMM) (30%) To note: In late 2017, we discovered copper-gold mineralisation at the Winu project (Paterson Province in Western Australia). In 2021, we reported our first Indicated Mineral Resource. The pathway remains subject to regulatory and other required approvals. Project Agreement negotiations with the Martu Traditional Owner Group remains our priority.

    Copper: La Granja Location: Cajamarca, Peru

    Ownership: Rio Tinto (45%), First Quantum Minerals (55%)

    To note: In August 2023, we completed a transaction to form a joint venture with First Quantum Minerals (FQM) that will work to unlock the development of the La Granja project, one of the largest undeveloped copper deposits in the world, with potential to be a large, long-life operation. FQM acquired its stake for $105m. It will invest up to a further $546m into the joint venture to sole fund capital and operational costs to take the project through a feasibility study and toward development.

    Iron Ore: Rhodes Ridge Location: WA, Australia

    Ownership: Rio Tinto (50%), Mitsui & Co. (40%), AMB Holdings Pty Ltd (10%)2

    Capacity: 40 to 50 Mtpa

    First ore: end of decade

    To note: The Rhodes Ridge Joint Venture has approved a feasibility study to progress development of the first phase of the Rhodes Ridge project. The feasibility study will assess development of an operation with initial annual production capacity of 40 to 50 Mtpa.

    This study commenced in Q1 2026 as planned, and is expected to conclude in 2029. The development will use Rio Tinto's rail, port and power infrastructure.

    Following completion of the pre-feasibility study and with the environmental referral planned, we aim to progress toward reporting an initial Ore Reserve for Rhodes Ridge in 2026, contingent on continued review of all relevant modifying factors.

    • Surface resource delineation and definition drilling are ongoing; additional rigs planned for November 2026 and January 2027.

    • Underground cover-hole drilling commenced on 31 August, two months ahead of plan, with completion expected by end-October.

    • Underground enabling works to upgrade the existing infrastructure in Shafts 9 and 10 in preparation for material handling associated with underground development are progressing.

    • Engineering work to enable procurement of long lead items (power, hoisting) continue to advance following completion of the land exchange.

    • Land exchange commitments/benefits and engagement with Native American Tribes, local communities and regulators continue to progress. This includes a $54M Native American Trust.

    • On 29 September, the Ninth Circuit declined an en banc challenge to the land exchange; further appeal to the US Supreme Court remains possible.

    • The Project Agreement with Nyangumarta Warrarn Aboriginal Corporation was signed on 8 September 2026, marking a key project milestone.

    • The EPA released the Environmental Review Document for public review on 27 August 2026; the review period closes on 22 October 2026.

    • The mining lease was granted on the 22 September 2026.

    • The feasibility study for processing capacity up to 10 Mtpa remains on track for completion around the end of 2026.

    • Discussions continue with the Martu Traditional Owner Group to secure airstrip and water access.

    • Full potential exploration drilling underway.

    • Project development continues to focus on advancing permitting, baseline environmental and social studies and stakeholder engagement, following publication of the updated Mineral Resource in May 20261.

    • The feasibility study remains on track to be completed in 2029 subject to relevant approvals.

      Project Status

      Aluminium: Arctial partnership

      Location: Finland

      To note: Partnership agreement formed in 2025 with the Swedish investment company Vargas, Mitsubishi Corporation and other international and local industry partners to study a low carbon aluminium greenfield opportunity in Finland. As the strategic industrial partner, Rio Tinto will provide the Arctial partnership with access to its proven industry-leading AP60 technology and assist in what would be the first AP60 deployment in an aluminium smelter outside Quebec, Canada.

      Aluminium: Kangwinan Location: Queensland, Australia

      To note: Proposed expansion to increase annual bauxite production capacity from Rio Tinto's Weipa Southern operations, by up to 20 million tonnes, in addition to the current 23 million tonnes, and expand export capacity through the Amrun port. This would largely replace the tonnages lost when Gove and Andoom come to the end of their mine lives. Early works commenced in May 2025, with first production targeted as early as 2029.

    • The JV partners approved progressing the Arctial project into feasibility stage in Q3. A study team has been mobilised in Finland and work is underway.

    • Engagements on environmental permits continue to progress in parallel.

    • Continuing to progress through studies, approvals and early works. Final investment decision expected in Q4 2026.

      Lithium: 30 in 30

      Location: Argentina future hubs • Developing the blueprint in 2026 for two future hubs, targeting

      $30/kg capital intensity with a 30-month timeline for development and <$5/kg C1 operating costs.

      Lithium: Maricunga and Altoandinos Location: Atacama region, Chile

      To note: Binding agreement to form a joint venture (JV) with Codelco to develop and operate the high-grade Salar de Maricunga project. Binding agreement with ENAMI to form a JV to develop the Salares Altoandinos project.

    • Agreement closure expected in late 2026 / early 2027 (for both Maricunga and Altoandinos), subject to receipt of all applicable regulatory approvals and satisfaction of other customary closing conditions.

      1. The La Granja Mineral Resource estimate is sourced from First Quantum Minerals Ltd. Quote from the First Quantum release: "the Report was prepared in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") with an effective date of December 31, 2025."

      2. Mitsui holds its 40% interest through an entity named SPC Blue Pty Ltd and AMB holds its 10% interest through Rhodes Ridge Mining (No 1) Pty Ltd, a wholly owned subsidiary of Wright Prospecting Pty Ltd, that is managed and controlled by AMB.

  11. ‌Exploration and evaluation

    Commodities Advanced projects Greenfield/ Brownfield programs QoQ change

    Greenfield: Argentina1, Angola, Australia,

    Activities concluded in Laos.

    Copper Nuevo Cobre, Chile Canada, Chile, China, Colombia, Comita, Colombia Kazakhstan, Peru, Papua New Guinea,

    Serbia1, Türkiye1, USA and Zambia

    Strategic investment in Mogotes Metals relating to their Filo Sur1 project in Argentina.

    Iron Ore

    Pilbara, Australia

    Greenfield and Brownfield: Pilbara, Australia

    NA

    Bauxite

    Greenfield: Australia

    NA

    Lithium

    Greenfield: Australia

    Activities concluded in Rwanda.

    Other Chiri, Angola (diamonds) Kasiya1, Malawi (titanium) removed as project as part of strategic review

    1. Non-operated.

      • Overall, Rio Tinto has a strong portfolio of exploration projects with activity in 13 countries across five commodities. During the quarter, Rio Tinto continued to progress a range of high-quality copper exploration opportunities. This included making a strategic investment in Mogotes Minerals and forming a strategic & technical alliance covering the Filo Sur copper project in Argentina.

  12. ‌Third quarter public releases

22 July 2026 | Rio Tinto signs bio pellet supply agreement for Gladstone alumina refineries

27 July 2026 | Rio Tinto and WA Government sign agreements with Yindjibarndi WaterCo for proposed sale of Dampier Seawater Desalination Plant

29 July 2026 | Rio Tinto: Step-change in performance delivering higher shareholder returns

12 August 2026 | Perth Lynx and Rio Tinto strengthen commitment to growing basketball in WA

13 August 2026 | Rio Tinto welcomes agreement to secure long-term future of Tomago Aluminium

22 August 2026 | Perth Wildcats and Rio Tinto launch new elite development pathway for Pilbara basketballers

22 August 2026 | Rio Tinto celebrates 60 years in Western Australia

8 September 2026 | Ngarlawangga Aboriginal Corporation and Rio Tinto sign Interim Modernised Agreement

10 September 2026 | Nyangumarta Warrarn Aboriginal Corporation and Rio Tinto sign milestone agreement for Winu Project

15 September 2026 | Perth Wildcats and Rio Tinto strengthen partnership with three-year extension

21 September 2026 | Colours of our Country returns for its 21st year

22 September 2026 | ALNF and Rio Tinto partner to strengthen First Nations languages

28 September 2026 | Shougang Group and Rio Tinto commission an industrial-scale carbon capture trial facility for blast furnace gas

28 September 2026 | Rio Tinto and RevoCast partner to expand low-carbon aluminium billet supply in North America

Contacts

‌Please direct all enquiries to

media.enquiries@riotinto.com

Media Relations, United Kingdom

Matthew Klar

M +44 7796 630 637

David Outhwaite

M +44 7787 597 493

Media Relations, Australia

Matt Chambers

M +61 433 525 739

Alyesha Anderson M +61 434 868 118

Rachel Pupazzoni M +61 438 875 469

Bruce Tobin

M +61 419 103 454

Media Relations, Canada

Malika Cherry

M +1 418 592 7293

Vanessa Damha M +1 514 715 2152

Media Relations, US & Latin America

Jesse Riseborough M +1 202 394 9480

Investor Relations, United Kingdom

Rachel Arellano

M +44 7584 609 644

Laura Brooks

M +44 7826 942 797

Weiwei Hu

M +44 7825 907 230

Investor Relations, Australia

Tom Gallop

M +61 439 353 948

Eddie Gan-Och

M +61 477 599 714

Rio Tinto plc

6 St James's Square London SW1Y 4AD United Kingdom

T +44 20 7781 2000

Registered in England No. 719885

Rio Tinto Limited

Level 43, 120 Collins Street

Melbourne 3000 Australia

T +61 3 9283 3333

Registered in Australia ABN 96 004 458 404

This announcement is authorised for release to the market by Matthew Whyte, Rio Tinto's Group Company Secretary.

riotinto.com

UK LEI: 213800YOEO5OQ72G2R82 AU LEI: 529900X2VMAQT2PE0V24

Classification: 3.1 Additional regulated information required to be disclosed under the laws of a Member State

Forward-looking statements

This announcement includes "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. All statements other than statements of historical facts included in this announcement, including, without limitation, those regarding Rio Tinto's financial position, production guidance, business strategy, plans and objectives of management for future operations (including development plans and objectives relating to Rio Tinto's products, production forecasts and reserve and resource positions), are forward-looking statements. The words "intend", "aim", "project", "anticipate", "estimate", "plan", "believes", "expects", "may", "should", "will", "target", "set to" or similar expressions, commonly identify such forward-looking statement.

Such forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Rio Tinto, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such forward-looking statements are based on numerous assumptions regarding Rio Tinto's present and future business strategies and the environment in which Rio Tinto will operate in the future. A discussion of the important factors that could cause Rio Tinto's actual results, performance or achievements to differ materially from those in the forward-looking statements can be found in Rio Tinto's most recent Annual Report and accounts in Australia and the United Kingdom and the most recent Annual Report on Form 20-F filed with the United States Securities and Exchange Commission (the "SEC") or Form 6-Ks furnished to, or filed with, the SEC. Forward-looking statements should, therefore, be construed in light of the risk factors discussed in such documents, and undue reliance should not be placed on forward-looking statements. These forward-looking statements speak only as of the date of this announcement. Rio Tinto expressly disclaims any obligation or undertaking (except as required by applicable law, the UK Listing Rules, the Disclosure Guidance and Transparency Rules of the Financial Conduct Authority and the Listing Rules of the Australian Securities Exchange) to release publicly any updates or revisions to any forward-looking statement contained herein to reflect any change in Rio Tinto's expectations with regard thereto or any change in events, conditions or circumstances on which any such statement is based.

Nothing in this announcement should be interpreted to mean that future earnings per share of Rio Tinto plc or Rio Tinto Limited will necessarily match or exceed its historical published earnings per share. Past performance cannot be relied on as a guide to future performance.

‌Rio Tinto production summary Rio Tinto share of production

Quarter 9 Months % change

9 MTHS

2026

Q3 26

Q3 26

vs

Q3

Q4

Q1

Q2

Q3

2025

2026

vs

vs

9 MTHS

2025

2025

2026

2026

2026

9 MTHS

9 MTHS

Q3 25

Q2 26

2025

Principal

commodities

Alumina

('000 t)

1,888

1,969

2,038

2,002

2,071

5,623

6,111

+10%

+3%

+9%

Aluminium (Primary)

('000 t)

857

852

835

841

842

2,528

2,518

-2%

0%

0%

Bauxite

('000 t)

16,392

15,397

13,281

15,200

15,745

47,002

44,225

-4%

+4%

-6%

Copper (consolidated)

('000 t)

204

240

229

213

205

643

646

0%

-4%

+1%

Iron Ore (a)

('000 t)

74,168

80,515

70,045

72,949

74,573

210,124

217,567

+1%

+2%

+4%

Lithium carbonate

equivalent (LCE) (b)

('000 t)

12.5

15.4

12.7

14.6

13.0

30.4

40.3

+4%

-11%

+33%

Other Metals &

Minerals

Borates

('000 t)

128

124

128

137

132

377

396

+3%

-4%

+5%

Diamonds

('000 cts)

1,137

1,112

1,041

33

0

3,317

1,074

-100%

-100%

-68%

Gold (consolidated)

('000 oz)

167.8

205.8

175.1

159.5

169.1

413.5

503.8

+1%

+6%

+22%

Molybdenum

('000 t)

1.3

1.7

2.5

1.5

0.9

3.5

4.9

-31%

-38%

+41%

Salt

('000 t)

1,197

1,342

951

1,176

828

3,408

2,955

-31%

-30%

-13%

Silver - mined

('000 oz)

1,233

1,650

1,777

1,336

1,474

3,866

4,587

+20%

+10%

+19%

Silver - refined

('000 oz)

254

439

632

327

335

1,399

1,293

+32%

+2%

-8%

Titanium dioxide slag

('000 t)

261

222

218

227

217

753

662

-17%

-4%

-12%

Throughout this report, figures in italics indicate adjustments made since the figure was previously quoted on the equivalent page or reported for the first time. Production figures are sometimes more precise than the rounded numbers shown, hence small differences may result between the total of the quarter figures and the year to date figures.

  1. Iron Ore production for Pilbara operations and Iron Ore Company of Canada refers to saleable production (after crushing, screening and beneficiation). For Simandou, it represents ore ready for train loading at the SimFer mine gate: final (tertiary) crushing of Simandou ore takes place in China. Simandou value chain to China : at full production targeting a ~75-to-90-day cycle, with customer collection up to a further 30 days (mine to recognised sales).

  2. Year-to-date 2025 represents production since March following completion of the Arcadium acquisition. Q1 2025 LCE production was

5.6kt (6.5kt on a 100% basis); LCE shipments were 3.8kt (5.0kt on a 100% basis).

‌Rio Tinto interest

Q3 2025

Q4 2025

Q1 2026

Q2 2026

Q3 2026

9 MTHS

2025

9 MTHS

2026

ALUMINA

Production ('000 tonnes)

Jonquière (Vaudreuil)

100 %

323

351

349

322

332

1,018

1,003

Jonquière (Vaudreuil) specialty Alumina plant

100 %

26

29

28

28

31

81

87

Queensland Alumina

80 %

697

710

839

859

898

2,081

2,596

São Luis (Alumar)

10 %

98

98

98

97

96

281

291

Yarwun

100 %

743

781

724

695

715

2,162

2,134

Rio Tinto total alumina production

1,888

1,969

2,038

2,002

2,071

5,623

6,111

ALUMINIUM

Primary production ('000 tonnes)

Australia - Bell Bay

100 %

49

48

47

47

48

142

142

Australia - Boyne Island

74 %

94

93

91

92

95

277

278

Australia - Tomago

52 %

75

76

73

74

76

220

222

Canada - six wholly owned

100 %

397

386

378

379

374

1,176

1,132

Canada - Alouette (Sept-Îles)

40 %

60

63

63

63

63

183

190

Canada - Bécancour

25 %

30

30

29

29

29

88

87

Iceland - ISAL (Reykjavik)

100 %

51

52

52

53

53

150

157

New Zealand - Tiwai Point

100 %

82

83

82

83

84

232

249

Oman - Sohar

20 %

20

20

20

20

20

60

60

Rio Tinto total primary aluminium production

857

852

835

841

842

2,528

2,518

Recycled production ('000 tonnes)

Matalco

50 %

68

62

61

70

69

207

200

Rio Tinto total recycled aluminium production

68

62

61

70

69

207

200

BAUXITE

Production ('000 tonnes) (a)

Gove

100 %

3,244

3,040

3,109

3,229

3,154

9,688

9,491

Porto Trombetas

22 %

690

659

523

578

685

1,884

1,786

Sangaredi

(b)

1,671

1,676

1,746

1,986

1,610

5,988

5,342

Weipa

100 %

10,788

10,021

7,903

9,407

10,296

29,442

27,605

Rio Tinto total bauxite production

16,392

15,397

13,281

15,200

15,745

47,002

44,225

  1. Mine production figures for metals refer to the total quantity of metal produced in concentrates, leach liquor or doré bullion irrespective of whether these products are then refined onsite, except for the data for bauxite and iron ore which represent production of marketable quantities of ore plus concentrates and pellets.

  2. Rio Tinto has a 22.95% shareholding in the Sangaredi mine but benefits from 45.0% of production.

Rio Tinto interest

Q3 2025

Q4 2025

Q1 2026

Q2 2026

Q3 2026

9 MTHS

2025

9 MTHS

2026

BORATES

Production ('000 tonnes B2O3 content)

Rio Tinto Borates - borates

100 %

128

124

128

137

132

377

396

COPPER

Mine production ('000 tonnes) (a)

Bingham Canyon

100 %

18.5

38.4

34.7

20.2

33.7

86.7

88.6

Escondida

30 %

96.7

89.9

88.7

84.2

75.8

291.8

248.8

Oyu Tolgoi

66 %

58.9

68.6

67.1

63.9

74.9

159.2

205.9

Rio Tinto total mine production

174.1

196.9

190.5

168.3

184.5

537.8

543.3

Refined production ('000 tonnes)

Escondida

30 %

14.0

14.0

16.4

19.9

16.4

42.1

52.8

Kennecott (b)

100 %

13.0

38.4

34.0

20.4

11.7

95.2

66.0

Rio Tinto total refined production

27.0

52.4

50.5

40.3

28.0

137.3

118.8

Copper production - consolidated basis

('000 tonnes)

Kennecott (b) - Production of refined metal

13.0

38.4

34.0

20.4

11.7

95.2

66.0

Escondida - Mill production (metal in concentrates) (c)

88.3

83.9

76.5

76.0

63.0

264.2

215.5

Escondida - Refined production from leach plants

14.0

14.0

16.4

19.9

16.4

42.1

52.8

Oyu Tolgoi - Metal in concentrates

89.2

103.9

101.6

96.9

113.5

241.3

312.0

Rio Tinto total production - consolidated basis

204.4

240.3

228.6

213.2

204.5

642.8

646.3

  1. Mine production figures for metals refer to the total quantity of metal produced in concentrates, leach liquor or doré bullion irrespective of whether these products are then refined onsite, except for the data for bauxite and iron ore which represent production of marketable quantities of ore plus concentrates and pellets.

  2. We continue to process third party concentrate to optimise smelter utilisation, including 5 thousand tonnes of cathode produced from purchased concentrate in Q3 2026. Purchased and tolled copper concentrates are excluded from reported production figures and guidance. Sales of cathodes produced from purchased concentrate are included in reported revenues.

  3. Mill production was previously reported together with recoverable copper in ore stacked for leaching as mined production.

Rio Tinto

Q3

Q4

Q1

Q2

Q3

9 MTHS

9 MTHS

interest

2025

2025

2026

2026

2026

2025

2026

DIAMONDS

Production ('000 carats)

0

1,074

Diavik 100 % 1,137 1,112 1,041 33 3,317

GOLD

Metal in concentrates production ('000 ounces) (a)

Bingham Canyon

100 %

19.0

37.6

36.3

20.4

33.2

80.2

89.9

Escondida

30 %

10.6

9.6

15.7

11.9

12.3

36.1

39.9

Oyu Tolgoi

66 %

91.2

104.7

81.2

84.0

81.6

196.2

246.8

Rio Tinto total mine production

120.8

151.9

133.3

116.3

127.1

312.4

376.6

Refined production ('000 ounces)

78.8

Kennecott (b) 100 % 19.4 31.3 37.9 21.5

19.5

85.4

Metal in concentrates production ('000 ounces) (a) - consolidated basis

Bingham Canyon

19.0

37.6

36.3

20.4

33.2

80.2

89.9

Escondida

10.6

9.6

15.7

11.9

12.3

36.1

39.9

Oyu Tolgoi

138.2

158.6

123.1

127.3

123.6

297.2

374.0

Rio Tinto total mine production -consolidated basis

167.8

205.8

175.1

159.5

169.1

413.5

503.8

  1. Mine production figures for metals refer to the total quantity of metal produced in concentrates, leach liquor or doré bullion irrespective of whether these products are then refined onsite, except for the data for bauxite and iron ore which represent production of marketable quantities of ore plus concentrates and pellets.

  2. We continue to process third party concentrate to optimise smelter utilisation, including 5 thousand tonnes of cathode produced from purchased concentrate in Q3 2026. Purchased and tolled copper concentrates are excluded from reported production figures and guidance. Sales of cathodes produced from purchased concentrate are included in reported revenues.

Rio Tinto interest

Q3 2025

Q4 2025

Q1 2026

Q2 2026

Q3 2026

9 MTHS

2025

9 MTHS

2026

IRON ORE

Production ('000 tonnes) (a)

Hamersley mines

(b)

58,574

63,972

55,828

57,369

58,073

165,633

171,270

Hope Downs

50 %

4,742

4,819

4,074

4,607

4,788

13,556

13,469

Iron Ore Company of Canada

59 %

2,348

2,187

2,023

1,714

2,236

7,152

5,973

Robe River - Pannawonica (Mesas J and A)

53 %

3,588

4,077

3,618

4,145

3,923

11,086

11,686

Robe River - West Angelas

53 %

4,917

4,436

4,246

4,817

4,444

12,697

13,506

Simandou

45% (g)

0

1,023

257

297

1,108

0

1,663

Rio Tinto iron ore production ('000 tonnes) (a)

74,168

80,515

70,045

72,949

74,573

210,124

217,567

Breakdown of Production:

Pilbara Blend and SP10 Lump (c)

24,003

25,557

22,326

23,487

23,220

66,574

69,032

Pilbara Blend and SP10 Fines (c)

33,357

35,974

31,468

32,455

32,897

94,187

96,820

Robe Valley Lump

1,663

1,672

1,539

1,714

1,630

4,879

4,882

Robe Valley Fines

1,924

2,405

2,079

2,431

2,294

6,207

6,804

Yandicoogina Fines (HIY)

10,873

11,697

10,354

10,850

11,189

31,125

32,393

Pilbara iron ore production ('000 tonnes)

71,820

77,305

67,766

70,937

71,229

202,972

209,932

IOC Concentrate

936

785

1,010

442

789

3,063

2,241

IOC Pellets

1,411

1,402

1,013

1,272

1,447

4,089

3,732

IOC iron ore production ('000 tonnes)

2,348

2,187

2,023

1,714

2,236

7,152

5,973

Simandou iron ore production ('000 tonnes) (f)

45% (g)

0

1,023

257

297

1,108

0

1,663

Sales ('000 tonnes)

Breakdown of Sales:

Pilbara Blend Lump

17,668

19,081

14,976

17,832

17,589

38,602

50,397

Pilbara Blend Fines

33,353

34,602

27,792

33,501

33,034

73,697

94,327

Robe Valley Lump

1,330

1,371

1,173

1,503

1,326

3,874

4,002

Robe Valley Fines

2,233

2,615

2,276

2,909

2,505

7,103

7,689

Yandicoogina Fines (HIY)

10,764

12,421

8,485

11,284

11,276

30,749

31,044

SP10 Lump (c)

2,938

3,637

2,744

2,314

3,398

19,379

8,456

SP10 Fines (c)

3,155

4,975

3,740

2,831

5,175

27,019

11,746

Pilbara iron ore sales ('000 tonnes) (d)

71,441

78,702

61,186

72,173

74,302

200,423

207,661

Pilbara iron ore sales - consolidated basis ('000 tonnes) (d) (e) 73,431 80,586 62,998 74,197

76,204

205,954

213,399

IOC Concentrate

1,056

837

676

653

686

2,978

2,015

IOC Pellets

1,306

1,376

1,258

1,203

1,535

4,044

3,997

IOC Iron ore sales ('000 tonnes) (d)

2,363

2,212

1,934

1,856

2,221

7,022

6,011

Simandou iron ore sales ('000 tonnes) (h)

45% (g)

0

0

0

190

589

0

779

  1. Mine production figures for metals refer to the total quantity of metal produced in concentrates, leach liquor or doré bullion irrespective of whether these products are then refined onsite, except for the data for bauxite and iron ore which represent production of marketable quantities of ore plus concentrates and pellets. Iron Ore production for Pilbara operations and Iron Ore Company of Canada refers to saleable production (after crushing, screening and beneficiation). For Simandou, it represents ore ready for train loading at the SimFer mine gate: final (tertiary) crushing of Simandou ore takes place in China.

  2. Includes 100% of production from Paraburdoo, Mt Tom Price, Western Turner Syncline, Marandoo, Yandicoogina, Brockman, Nammuldi, Silvergrass, Channar, Gudai-Darri, Eastern Range and Western Range mines. Whilst Rio Tinto owns 54% of the Eastern Range and the Western Range mines, under the terms of the joint venture agreement, Hamersley Iron manages the operation and is obliged to purchase all mine production from the joint venture and therefore all of the production is included in Rio Tinto's share of production.

  3. SP10 includes other lower grade products.

  4. Sales includes material shipped to our portside trading facility in China which may not be sold onwards in the same period.

  5. While Rio Tinto has a 53% net beneficial interest in Robe River Iron Associates, it recognises 65% of the assets, liabilities, sales revenues and expenses in its accounts (as 30% is held through a 60% owned subsidiary and 35% is held through a 100% owned subsidiary). The consolidated basis sales reported here include Robe River Iron Associates on a 65% basis to enable comparison with revenue reported in the financial statements.

  6. Simandou production represents ore at the SimFer mine gate before train loading. Final crushing is undertaken in China, hence, Simandou mine gate production is not considered to be saleable production.

  7. Represents the Rio Tinto equity share of SimFer Jersey (53% owned by Rio Tinto), which owns 85% of the SimFer mine (Blocks 3&4).

  8. Simandou value chain to China: at full production targeting a ~75-to-90-day cycle, with customer collection up to a further 30 days (mine to recognised sales).

Rio Tinto

Q3

Q4

Q1

Q2

Q3

9 MTHS

9 MTHS

interest

2025

2025

2026

2026

2026

2025

2026

LITHIUM

Production ('000 tonnes)

Lithium carbonate

(a)

11.2

13.9

12.4

13.9

12.2

26.7

38.4

Lithium hydroxide

100 %

6.0

5.1

5.5

5.3

5.8

13.3

16.6

Spodumene

100 %

0.0

0.0

0.0

0.0

0.0

9.1

0.0

Other lithium specialities (LCE)

100 %

1.7

1.3

0.8

1.1

1.2

3.4

3.0

Total lithium carbonate equivalent (LCE) production (b)

12.5

15.4

12.7

14.6

13.0

30.4 (c)

40.3

  1. Lithium carbonate quantities reflect Rio Tinto's 66.5% ownership in Olaroz, 100% ownership in Fénix

  2. The lithium value chain is vertically integrated and as a result production volumes are not additive. Lithium Carbonate Equivalent (LCE) is derived from volumes of lithium carbonate, lithium chloride, and spodumene concentrate. These compounds are used as feedstock in downstream production.

  3. Year-to-date 2025 represents production since March following completion of the Arcadium acquisition. Q1 2025 LCE production was 5.6kt (6.5kt on a 100% basis); LCE shipments were 3.8kt (5.0kt on a 100% basis).

0.9

4.9

MOLYBDENUM

Mine production ('000 tonnes) (a)

Bingham Canyon 100 % 1.3 1.7 2.5 1.5

3.5

  1. Mine production figures for metals refer to the total quantity of metal produced in concentrates, leach liquor or doré bullion irrespective of whether these products are then refined onsite, except for the data for bauxite and iron ore which represent production of marketable quantities of ore plus concentrates and pellets.

828

2,955

SALT

Production ('000 tonnes)

Dampier Salt 68 % 1,197 1,342 951 1,176

3,408

SILVER

Metal in concentrates production ('000 tonnes) (a)

Bingham Canyon

100 %

282

556

536

287

471

1,178

1,294

Escondida

30 %

583

653

834

658

537

1,690

2,029

Oyu Tolgoi

66 %

369

441

406

392

466

998

1,264

Rio Tinto total mine production

1,233

1,650

1,777

1,336

1,474

3,866

4,587

Refined production ('000 ounces)

Kennecott (b)

100 %

254

439

632

327

335

1,399

1,293

  1. Mine production figures for metals refer to the total quantity of metal produced in concentrates, leach liquor or doré bullion irrespective of whether these products are then refined onsite, except for the data for bauxite and iron ore which represent production of marketable quantities of ore plus concentrates and pellets.

  2. We continue to process third party concentrate to optimise smelter utilisation, including 5 thousand tonnes of cathode produced from purchased concentrate in Q3 2026. Purchased and tolled copper concentrates are excluded from reported production figures and guidance. Sales of cathodes produced from purchased concentrate are included in reported revenues.

Rio Tinto

Q3

Q4

Q1

Q2

Q3

9 MTHS

9 MTHS

interest

2025

2025

2026

2026

2026

2025

2026

TITANIUM DIOXIDE SLAG

Production ('000 tonnes)

Rio Tinto Iron & Titanium (a)

100 %

261

222

218

227

217

753

662

(a) Quantities comprise 100% of Rio Tinto Fer et Titane and Rio Tinto's 74% interest in Richards Bay Minerals (RBM).

Production figures are sometimes more precise than the rounded numbers shown, hence small differences may result between the total of the quarter figures and the year to date figures.

Rio Tinto percentage interest shown above is at 30 September 2026.

‌Rio Tinto interest

Q3 2025

Q4 2025

Q1 2026

Q2 2026

Q3 2026

9 MTHS

2025

9 MTHS

2026

ALUMINA

Smelter Grade Alumina - Aluminium Group

Alumina production ('000 tonnes)

Australia

Queensland Alumina Refinery - Queensland

80 %

871

887

839

859

898

2,601

2,596

Yarwun refinery - Queensland

100 %

743

781

724

695

715

2,162

2,134

Brazil

São Luis (Alumar) refinery

10 %

984

984

977

973

957

2,812

2,907

Canada

Jonquière (Vaudreuil) refinery - Quebec (a)

100 %

323

351

349

322

332

1,018

1,003

(a) Jonquière's (Vaudreuil's) production shows smelter grade alumina only and excludes hydrate produced and used for specialty alumina.

31

87

Speciality Alumina - Aluminium Group Speciality alumina production ('000 tonnes) Canada

Jonquière (Vaudreuil) plant - Quebec 100 % 26 29 28 28 81

Rio Tinto percentage interest shown above is at 30 September 2026. The data represents production and sales on a 100% basis unless otherwise stated.

Rio Tinto interest

Q3 2025

Q4 2025

Q1 2026

Q2 2026

Q3 2026

9 MTHS

2025

9 MTHS

2026

ALUMINIUM

Primary Aluminium

Primary aluminium production ('000 tonnes)

Australia

Bell Bay smelter - Tasmania

100 %

49

48

47

47

48

142

142

Boyne Island smelter - Queensland

74 %

127

127

124

125

130

377

379

Tomago smelter - New South Wales

52 %

145

148

141

143

147

426

431

Canada

Alma smelter - Quebec

100 %

122

123

120

122

123

362

365

Alouette (Sept-Îles) smelter - Quebec

40 %

149

158

158

159

158

458

474

Arvida smelter - Quebec

100 %

34

24

20

13

0

106

33

Arvida AP60 smelter - Quebec

100 %

15

16

15

17

22

45

53

Bécancour smelter - Quebec

25 %

118

119

117

117

115

351

349

Grande-Baie smelter - Quebec

100 %

58

58

57

57

58

171

172

Kitimat smelter - British Columbia

100 %

103

101

105

108

110

305

322

Laterrière smelter - Quebec

100 %

64

63

62

62

63

188

187

Iceland

ISAL (Reykjavik) smelter

100 %

51

52

52

53

53

150

157

New Zealand

Tiwai Point smelter

100 %

82

83

82

83

84

232

249

Oman

Sohar smelter

20 %

101

100

99

102

101

301

302

Recycled Aluminium

Recycled aluminium production ('000 tonnes)

Matalco

50 %

135

124

121

140 139

415 400

Rio Tinto percentage interest shown above is at 30 September 2026. The data represents production and sales on a 100% basis unless otherwise stated.

Rio Tinto Q3

interest 2025

Q4 2025

Q1 2026

Q2 2026

Q3 2026

9 MTHS

2025

9 MTHS

2026

BAUXITE

Bauxite production ('000 tonnes)

Australia

Gove mine - Northern Territory

100 % 3,244

3,040

3,109

3,229

3,154

9,688

9,491

Weipa mine - Queensland

100 % 10,788

10,021

7,903

9,407

10,296

29,442

27,605

Brazil

Porto Trombetas (MRN) mine

22 % 3,134

2,997

2,379

2,627

3,113

8,563

8,118

Guinea

Sangaredi mine (a)

23 % 3,712

3,725

3,880

4,414

3,578

13,307

11,872

Rio Tinto share of bauxite shipments

Share of total bauxite shipments ('000 tonnes)

16,396

15,102

13,427

15,305

15,871

46,456

44,603

Share of third party bauxite shipments ('000 tonnes) (b)

11,843

10,638

9,221

10,614

11,574

33,131

31,409

  1. Rio Tinto has a 22.95% shareholding in the Sangaredi mine but benefits from 45.0% of production.

  2. Sangaredi's third-party bauxite shipments for 2025 and Q1 2026 were restated following a reclassification between internal and third-party shipments. This has no impact on total bauxite shipments.

Rio Tinto interest

Q3 2025

Q4 2025

Q1 2026

Q2 2026

Q3 2026

9 MTHS

2025

9 MTHS

2026

BORATES

US

Borates ('000 tonnes) (a)

100 %

128

124

128

137

132

377

396

(a) Production is expressed as B2O3 content.

Rio Tinto interest

Q3 2025

Q4 2025

Q1 2026

Q2 2026

Q3 2026

9 MTHS

2025

9 MTHS

2026

COPPER & GOLD

Escondida 30 %

Chile

Sulphide ore to concentrator ('000 tonnes)

36,721

35,628

34,225

35,862

31,429

106,100

101,517

Average copper grade (%)

0.94

0.91

0.88

0.85

0.81

0.99

0.85

Contained copper ('000 tonnes)

294.2

279.7

255.1

253.5

210.0

880.8

718.5

Contained gold ('000 ounces)

35.3

31.9

52.5

39.7

40.9

120.2

133.1

Contained silver ('000 ounces)

1,942

2,176

2,780

2,193

1,790

5,634

6,764

Recoverable copper in ore stacked for leaching ('000 tonnes) (a)

28.1

20.0

40.7

27.3

42.8

91.9

110.8

Refined production from leach plants:

Copper cathode production ('000 tonnes)

46.5

46.7

54.8

66.4

54.7

140.4

175.8

Sales of metals:

Copper in concentrates ('000 tonnes) (b)

258

278

252

234

211

853

696

Copper cathode ('000 tonnes)

38

50

50

72

48

138

170

Gold ('000 ounces) (b)

35

32

52

40

41

120

133

Silver ('000 ounces) (b)

1,942

2,176

2,780

2,193

1,790

5,634

6,764

  1. The calculation of copper in material mined for leaching is based on ore stacked at the leach pad.

  2. Payable metals in concentrates.

Rio Tinto percentage interest shown above is at 30 September 2026. The data represents production and sales on a 100% basis unless otherwise stated.

Rio Tinto interest

Q3 2025

Q4 2025

Q1 2026

Q2 2026

Q3 2026

9 MTHS

2025

9 MTHS

2026

COPPER & GOLD (continued)

Kennecott

Bingham Canyon mine

100 %

Utah, US

Ore treated ('000 tonnes)

5,928

11,249

10,168

6,640

9,726

25,897

26,534

Average ore grade:

Copper (%)

0.37

0.41

0.41

0.36

0.40

0.40

0.40

Gold (g/t)

0.16

0.18

0.17

0.13

0.20

0.15

0.17

Silver (g/t)

2.11

2.31

2.32

1.95

2.23

2.04

2.19

Molybdenum (%)

0.047

0.027

0.046

0.049

0.028

0.034

0.040

Copper concentrates produced ('000 tonnes)

75

162

152

83

139

381

375

Average concentrate grade (% Cu)

24.6

23.2

22.8

24.2

24.2

22.7

23.6

Production of metals in copper concentrates:

Copper ('000 tonnes) (a)

18.5

38.4

34.7

20.2

33.7

86.7

88.6

Gold ('000 ounces)

19.0

37.6

36.3

20.4

33.2

80.2

89.9

Silver ('000 ounces)

282

556

536

287

471

1,178

1,294

Molybdenum concentrates produced ('000 tonnes):

3.3

4.2

5.7

3.7

2.6

8.5

12.0

Molybdenum in concentrates ('000 tonnes)

1.3

1.7

2.5

1.5

0.9

3.5

4.9

Kennecott smelter & refinery

100 %

Copper concentrates smelted ('000 tonnes)

131

194

98

167

151

417

416

Copper anodes produced ('000 tonnes) (b)

27.8

37.9

19.7

25.4

13.8

97.5

58.9

Production of refined metal:

Copper ('000 tonnes) (c)

13.0

38.4

34.0

20.4

11.7

95.2

66.0

Gold ('000 ounces) (d)

19.4

31.3

37.9

21.5

19.5

85.4

78.8

Silver ('000 ounces) (d)

254

439

632

327

335

1,399

1,293

Sales of refined metal:

Copper ('000 tonnes) (c)

10.2

41.9

33.4

20.9

10.5

92.7

64.8

Gold ('000 ounces)

17.7

29.7

36.0

20.8

18.5

82.2

75.2

Silver ('000 ounces)

230

427

604

328

325

1,355

1,257

  1. Includes a small amount of copper in precipitates.

  2. New metal excluding recycled material.

  3. We continue to process third party concentrate to optimise smelter utilisation, including 5 thousand tonnes of cathode produced from purchased concentrate in Q3 2026. Purchased and tolled copper concentrates are excluded from reported production figures and guidance. Sales of cathodes produced from purchased concentrate are included in reported revenues.

  4. Includes gold and silver in intermediate products.

Rio Tinto percentage interest shown above is at 30 September 2026. The data represents production and sales on a 100% basis unless otherwise stated.

Rio Tinto interest

Q3 2025

Q4 2025

Q1 2026

Q2 2026

Q3 2026

9 MTHS

2025

9 MTHS

2026

COPPER & GOLD (continued)

Oyu Tolgoi mine

66 %

Mongolia

Ore Treated ('000 tonnes) - Open Pit

7,282

7,926

7,334

6,639

7,390

21,588

21,363

Ore Treated ('000 tonnes) - Underground

2,870

3,406

3,500

3,263

3,768

8,503

10,531

Ore Treated ('000 tonnes) - Total

10,153

11,332

10,834

9,902

11,159

30,090

31,894

Average mill head grades:

Open Pit

Copper (%)

0.54

0.55

0.54

0.53

0.51

0.48

0.53

Gold (g/t)

0.58

0.62

0.46

0.52

0.38

0.40

0.45

Silver (g/t)

1.13

1.16

1.08

1.11

1.12

1.07

1.10

Underground

Copper (%)

2.16

2.20

2.16

2.28

2.36

2.11

2.27

Gold (g/t)

0.63

0.59

0.61

0.61

0.65

0.60

0.62

Silver (g/t)

4.87

4.94

4.81

4.98

5.14

4.71

4.98

Total

Copper (%)

1.00

1.05

1.06

1.11

1.14

0.94

1.10

Gold (g/t)

0.59

0.61

0.51

0.55

0.47

0.45

0.51

Silver (g/t)

2.19

2.29

2.29

2.38

2.48

2.10

2.38

Copper concentrates produced ('000 tonnes)

394.9

464.3

465.3

406.6

493.4

1,079.9

1,365.3

Average concentrate grade (% Cu)

22.6

22.4

21.8

23.8

23.0

22.3

22.9

Production of metals in concentrates:

Copper in concentrates ('000 tonnes)

89.2

103.9

101.6

96.9

113.5

241.3

312.0

Gold in concentrates ('000 ounces)

138.2

158.6

123.1

127.3

123.6

297.2

374.0

Silver in concentrates ('000 ounces)

559

668

616

594

706

1,512

1,915

Sales of metals in concentrates (a):

Copper in concentrates ('000 tonnes)

80.9

92.4

105.1

98.8

106.8

225.0

310.6

Gold in concentrates ('000 ounces)

121.2

144.2

137.5

127.7

118.4

269.9

383.5

Silver in concentrates ('000 ounces)

474

557

614

568

623

1,327

1,805

(a) Sales of metals in concentrates refer to the payable metals in concentrates collected by customers from the Mongolia/China border.

Rio Tinto interest

Q3 2025

Q4 2025

Q1 2026

Q2 2026

Q3 2026

9 MTHS

2025

9 MTHS

2026

DIAMONDS

Diavik Diamonds

100 %

Northwest Territories, Canada

Ore processed ('000 tonnes)

515

489

442

0

0

1,419

442

Diamonds recovered ('000 carats)

1,137

1,112

1,041

33

0

3,317

1,074

Rio Tinto percentage interest shown above is at 30 September 2026. The data represents production and sales on a 100% basis unless otherwise stated.

Rio Tinto Q3

interest 2025

Q4 2025

Q1 2026

Q2 2026

Q3 2026

9 MTHS

2025

9 MTHS

2026

IRON ORE

Rio Tinto Iron Ore

Western Australia

Pilbara Operations

Saleable iron ore production ('000 tonnes)

Hamersley mines

(a) 58,574

63,972

55,828

57,369

58,073

165,633

171,270

Hope Downs

50 % 9,484

9,639

8,148

9,214

9,576

27,112

26,938

Robe River - Pannawonica (Mesas J and A)

53 % 6,769

7,693

6,826

7,820

7,403

20,917

22,049

Robe River - West Angelas

53 % 9,276

8,370

8,011

9,088

8,385

23,956

25,484

Total production ('000 tonnes)

84,104

89,674

78,813

83,491

83,437

237,618

245,741

Breakdown of total production:

Pilbara Blend and SP10 Lump (b)

28,545

29,678

26,031

27,644

27,381

78,371

81,056

Pilbara Blend and SP10 Fines (b)

37,917

40,606

35,603

37,176

37,464

107,205

110,243

Robe Valley Lump

3,138

3,155

2,903

3,234

3,075

9,206

9,212

Robe Valley Fines

3,631

4,538

3,923

4,586

4,328

11,711

12,837

Yandicoogina Fines (HIY)

10,873

11,697

10,354

10,850

11,189

31,125

32,393

Breakdown of total shipments:

Pilbara Blend Lump

21,142

21,362

16,799

20,858

20,025

46,106

57,683

Pilbara Blend Fines

38,477

39,448

32,170

37,831

36,947

86,760

106,948

Robe Valley Lump

2,510

2,588

2,214

2,835

2,503

7,310

7,551

Robe Valley Fines

4,214

4,934

4,294

5,488

4,726

13,402

14,507

Yandicoogina Fines (HIY)

10,764

12,421

8,485

11,284

11,276

30,749

31,044

SP10 Lump (b)

3,643

4,720

3,996

3,559

4,522

21,665

12,076

SP10 Fines (b)

3,597

5,787

4,430

3,409

5,683

28,982

13,521

Total shipments ('000 tonnes) (c)

84,346

91,259

72,387

85,264

85,681

234,973

243,331

Iron Ore Company of Canada

59 %

Newfoundland & Labrador and Quebec in Canada

Saleable iron ore production:

Concentrates ('000 tonnes)

1,594

1,337

1,720

753

1,344

5,216

3,816

Pellets ('000 tonnes)

2,403

2,388

1,724

2,166

2,464

6,964

6,355

IOC Total production ('000 tonnes)

3,998

3,725

3,444

2,919

3,808

12,180

10,171

Shipments:

Concentrates ('000 tonnes)

1,799

1,425

1,151

1,112

1,168

5,072

3,431

Pellets ('000 tonnes)

2,225

2,343

2,143

2,049

2,614

6,886

6,806

IOC Total Shipments ('000 tonnes) (c)

4,024

3,768

3,294

3,161

3,782

11,958

10,237

Simandou

45% (e)

Simandou iron ore production ('000 tonnes) (d)

0

2,271

570

660

2,460

0

3,691

Simandou iron ore sales ('000 tonnes)

0

0

0

422

1,307

0

1,729

Global Iron Ore Totals

Iron Ore Production ('000 tonnes) (f)

88,102

95,670

82,828

87,070

89,705

249,798

259,604

Iron Ore Sales ('000 tonnes) (g)

88,369

95,027

75,681

88,847

90,770

246,931

255,297

  1. Includes 100% of production from Paraburdoo, Mt Tom Price, Western Turner Syncline, Marandoo, Yandicoogina, Brockman, Nammuldi, Silvergrass, Channar, Gudai-Darri, Eastern Range and Western Range mines. Whilst Rio Tinto owns 54% of the Eastern Range and the Western Range mines, under the terms of the joint venture agreement, Hamersley Iron manages the operation and is obliged to purchase all mine production from the joint venture and therefore all of the production is included in Rio Tinto's share of production.

  2. SP10 includes other lower grade products.

  3. Sales includes material shipped to our portside trading facility in China which may not be sold onwards in the same period.

  4. Simandou production represents crushed ore at the SimFer mine gate before train loading. Final crushing is undertaken in China, hence, Simandou mine gate production is not considered to be saleable production. There is 7.9Mt (100% SimFer) stockpiled uncrushed ore at the Simfer mine.

  5. Represents Rio Tinto's equity share of SimFer Jersey (53% owned by Rio Tinto), which owns 85% of the SimFer mine (Blocks 3&4).

  6. Iron Ore production for Pilbara operations and Iron Ore Company of Canada (IOC) refers to saleable production (after crushing, screening and beneficiation). For Simandou, it represents ore ready for train loading at the SimFer mine gate: final (tertiary) crushing of Simandou ore takes place in China.

  7. Includes all shipments from Pilbara and IOC, including those to our Portside trading business; excludes shipments from our Portside trading business. For the Simandou value chain to China: at full production targeting a ~75-to-90-day cycle, with customer collection up to a further 30 days (mine to recognised sales).

Rio Tinto percentage interest shown above is at 30 September 2026. The data represents production and sales on a 100% basis unless otherwise stated.

Rio Tinto interest

Q3 2025

Q4 2025

Q1 2026

Q2 2026

Q3 2026

9 MTHS

2025

9 MTHS

2026

LITHIUM

Lithium production ('000 tonnes)

Lithium carbonate (a)

(a)

14.0

17.1

14.9

16.4

14.2

32.9

45.5

Lithium hydroxide

100 %

6.0

5.1

5.5

5.3

5.8

13.2

16.6

Spodumene

100 %

0.0

0.0

0.0

0.0

0.0

9.1

0.0

Other lithium specialities (LCE)

100 %

2.1

0.9

0.8

1.1

1.2

3.7

3.0

Total lithium carbonate equivalent (LCE) production (b)

15.2

18.4

15.3

17.1

15.0

33.7 (c)

47.4

Third party shipments ('000 tonnes)

Lithium carbonate (a)

(a)

11.5

14.9

9.8

10.4

10.6

21.4

30.8

Lithium hydroxide

100 %

4.6

6.4

4.1

4.8

4.7

10.7

13.6

Spodumene

100 %

30.6

0.0

0.0

0.0

0.0

53.2

0.0

Other lithium specialities (LCE)

100 %

0.4

0.4

0.6

0.7

0.8

1.1

2.1

Total lithium carbonate equivalent shipments ('000 LCE)

20.2

21.4

14.2

15.7

15.8

39.4 (c)

45.8

  1. Lithium carbonate quantities reflect our 100% share of Olaroz shipments, of which Rio Tinto's ownership is 66.5%.

  2. The lithium value chain is vertically integrated and as a result production volumes are not additive. Lithium Carbonate Equivalent (LCE) is derived from volumes of lithium carbonate, lithium chloride, and spodumene concentrate. These compounds are used as feedstock in downstream production.

  3. Year-to-date 2025 represents production since March following completion of the Arcadium acquisition. Q1 2025 LCE production was 5.6kt (6.5kt on a 100% basis); LCE shipments were 3.8kt (5.0kt on a 100% basis).

SALT

Dampier Salt (a) 68 %

Western Australia

Salt production ('000 tonnes) 1,751 1,963 1,392 1,720

4,322

1,211

4,986

217

662

TITANIUM DIOXIDE SLAG

Rio Tinto Iron & Titanium 100 %

Canada and South Africa

(Rio Tinto share) (a)

Titanium dioxide slag ('000 tonnes) 261 222 218 227

753

  1. Quantities comprise 100% of Rio Tinto Fer et Titane and Rio Tinto's 74% interest in Richards Bay Minerals' production. Ilmenite mined in Madagascar is being processed in Canada.

Rio Tinto percentage interest shown above is at 30 September 2026. The data represents production and sales on a 100% basis unless otherwise stated.

Company analysis

Earlier from Rio Tinto

All Rio Tinto news releases