Queenston MNGTSX: QMI

Queenston Reports Positive Drill Results at Upper Beaver

· Issued by Queenston MNG via CNW
TORONTO, July 27 /CNW/ - Queenston Mining Inc. (QMI-TSX) announces
results of the first phase drilling program on the 100% owned Upper Beaver
gold property located in Gauthier Township, near Kirkland Lake, Ontario. This
program forms part of the $3 million exploration initiative the Company has
embarked upon on its Kirkland Lake holdings.
The highlight of the drilling is the intersection of a gold horizon in
the first four holes of the program over a strike length of 200m. Significant
values include, 5.9 g/t over 2.1m and 8.5 g/t over 1.9m in hole UB05-01,
14.3 g/t over 3.0m in hole UB05-03 and 9.2 g/t over 4.0m in hole UB05-04. This
horizon, referred to as the "Contact Zone", occurs south and below the Upper
Beaver Mine which between 1919-71 produced 130,000 oz. of gold to a depth of
380m and has an historic, pre-NI 43-101 indicated resource of 180,000 tonnes
grading 7.9 g/t gold and 1.2% copper. A list of the 8 holes (3,160m) completed
during the first phase of the drilling program are outlined on the table
below.

<<

-------------------------------------------------------------------------
                                                 Inter-
Hole     Coord-    Dip      Az     From    To     val   Cu   Gold   Zone
No.      inates (degrees)(degrees)  (m)    (m)    (m)   (%)  (g/t)
-------------------------------------------------------------------------
UB05-01  14+85E,                                                    Upper
         6+00N     -75      228    114.6  119.8   5.2  0.2    2.7 Contact
-------------------------------------------------------------------------
                                                                    Upper
                including          115.7  117.8   2.1  0.4    5.9 Contact
-------------------------------------------------------------------------
                                                                    Upper
                                   129.8  149.6  19.8  0.1    2.0 Contact
-------------------------------------------------------------------------
                                                                    Upper
                including          129.8  132.0   2.2    -    4.2 Contact
-------------------------------------------------------------------------
                                                                    Upper
                   and             136.5  139.9   3.4  0.3    5.4 Contact
-------------------------------------------------------------------------
                                                                    Upper
                   and             138.0  139.9   1.9  0.5    8.5 Contact
-------------------------------------------------------------------------
                                                                    Upper
                                   145.0  146.0   1.0    -    7.4 Contact
-------------------------------------------------------------------------
UB05-02  14+85E,                                                    Upper
         6+00N     -55      228     99.3  100.4   1.1    -    1.4 Contact
-------------------------------------------------------------------------
UB05-03  16+70E,                                                    Upper
         4+65N     -70      235    155.1  164.8   9.7    -    0.9 Contact
-------------------------------------------------------------------------
                                                                    Upper
                                   172.0  173.0   1.0    -    4.0 Contact
-------------------------------------------------------------------------
                                                                    Upper
                                   214.6  217.6   3.0  0.2   14.3 Contact
-------------------------------------------------------------------------
UB05-04  16+70E,                                                    Upper
         4+65N     -83      235    212.0  213.9   1.9  0.2    3.5 Contact
-------------------------------------------------------------------------
                                                                    Lower
                                   292.3  301.3   9.0  0.1    4.6 Contact
-------------------------------------------------------------------------
                                                                    Lower
                including          297.3  301.3   4.0  0.2    9.2 Contact
-------------------------------------------------------------------------
                                                                    Lower
                                   324.4  325.5   1.0  0.1    5.5 Contact
-------------------------------------------------------------------------
UB05-05  12+05E,
         9+95N     -70      235                               NSV
-------------------------------------------------------------------------
UB05-06  15+00E,
         12+50N    -55      180    177.5  178.7   1.2    -    3.9 Central
-------------------------------------------------------------------------
                                   477.2  478.2   1.0  0.6    4.5 Central
-------------------------------------------------------------------------
                                   493.2  494.1   0.9  0.7    7.1 Central
-------------------------------------------------------------------------
                                   513.3  515.4   2.1  0.9    1.6 Central
-------------------------------------------------------------------------
                                   530.7  532.0   1.3  0.8    3.3 Central
-------------------------------------------------------------------------
UB05-07  12+00E,
         13+75N    -55      180                               NSV
-------------------------------------------------------------------------
UB05-08  20+95E,
         12+50N    -50      180    512.7  521.6   8.9  0.1    0.7 Central
-------------------------------------------------------------------------
                including          514.7  515.5   0.8  0.2    2.1 Central
-------------------------------------------------------------------------
(NSV (equal sign) No Significant Values)

Diamond drill holes UB05-01 to -05 targeted a contact horizon between
upper mafic volcanic rocks of the Kinojevis Group and lower felsic pyroclastic
and cherty sediments of the Gauthier Group. This horizon was traced by an
earlier IP geophysical survey over a strike length of 900m and was only
partially tested by previous historic drilling.
The Upper Contact Zone represents a series of altered, mineralized zones
in silicified, epidotized, carbonated, and brecciated mafic volcanic rocks
containing magnetite, chalcopyrite, pyrite and pyrrhotite. Holes UB05-01 and  
- 02 drilled on the same section were successful in intersecting the zone 25m
and 80m respectively west of historic drill hole UB91-12 which intersected
5.4 g/t gold over 15.4m. The Upper Contact intersections in holes UB05-03 and
UB05-04 (14.3 g/t Au over 3.0m and 3.5 g/t Au over 1.9m respectively) occur on
the same zone 200 m southeast of holes -01 and -02. Hole UB05-05 was drilled
along the geophysical trace of the Contact horizon 400m northwest of holes    
-01 and -02 and appears to have been collared south of the target horizon. The
Upper Contact Zone remains open along strike and down dip to the northeast.
The Lower Contact Zone represents a fractured and mineralized zone in
cherty, sericitic, chloritic sediments containing disseminated chalcopyrite,
magnetite and pyrite. This zone was intersected in hole UB05-04 where a 9.0m
interval assayed 4.6 g/t Au including 9.2 g/t Au over 4.0m. 1989 drill hole 
UB-89-04 is interpreted to have intersected the same horizon down dip and 500m
to the north assaying 8.7 g/t Au over 11.6m. The Lower Contact Zone is open
along strike and to the north beneath the workings of the Upper Beaver Mine.
Diamond drill holes UB05-06, -07 and -08 tested a structure interpreted
to strike east-west through a syenitic plug located north of the mine
workings. Previous historic drilling in the plug assumed a north-south trend
and intersected high-grade gold values including 48.9 g/t Au over 6.5m in hole
UB90-02. Recent hole UB05-06, drilled from north to south, intersected a
narrow, brecciated vein zone in syenite ("Central Zone") assaying 3.9 g/t Au
over 1.2m followed by four magnetite-chalcopyrite vein zones hosted in
conglomerate with a best assay interval of 7.1 g/t Au over 0.9m. Holes UB05-07
and UB05-08 drilled 300m west and 600m east respectively of UB05-06 targeted
the projected east-west trend of the Central Zone along two IP anomalies. Hole
UB05-07 intersected a series of shear and breccia zones containing anomalous
gold and copper values in mafic volcanic rocks and UB05-08 intersected an
altered, mineralized conglomerate unit assaying 0.7 g/t Au over 8.9m.
The first phase drilling program continues at Upper Beaver targeting a
series of IP anomalies on the northern portion of the property. On completion,
a second phase of drilling is planned to follow-up the encouraging results
encountered in the Upper and Lower Contact Zones.
The Upper Beaver program is supervised and planned by Queenston's Chief
Geologist and qualified person Wayne R. Benham, P.Geo. employing a QA/QC
program consistent with National Instrument 43-101 and industry best
practices. The drill core is logged and split and half-core samples are
analyzed by standard fire assay with atomic absorption or gravimetric finish
at Swastika Laboratories Ltd. of Swastika, Ontario. The significant assay
intervals in holes UB05-01 to -04 were verified using a metallic sieve assay
procedure.

>>
%SEDAR: 00008330E

Queenston MNG on 6ix

Earlier from Queenston MNG

Later from Queenston MNG

All Queenston MNG news releases