Definitive Engineering Study Progress: Achieved 90% design completion, reduced annual water consumption to 12 GL/yr, confirmed electrical load, finalized site layout, and appointed Mining Plus for updated Ore Reserve targeting 2026 release. Grid Connection Milestone: Secured draft Access Offer from Western Power for 89MW (winter) and 72MW (summer) capacity, ensuring reliable low-emissions power. R