Pt Barito Pacific TbkIDX: BRPT

BRPT Annual Public Expose - 12 Nov 2025

· Issued by PT Barito Pacific Tbk
Impact

Beyond

Returns

Company Presentation

Publix Expose 2025

PT Barito Pacific Tbk

Nov 2025



P A G E 2



Key Discussions

01 02 03 04 05

Barito Pacific: Group Overview

Business Overview: Chemical & Infrastructure and Energy

Financial Update: 9M25

Growth Initiatives: Investing in Tomorrow's growth

ESG:

Purposeful Growth



01

Barito Pacific Group Overview


Leading Petrochemical and Energy with Integrated and Diversified Portfolio



P A G E 4



01

Group Overview

Over 40 years of Contribution to National Development

Transforming into an integrated chemical solution and leading energy player



Key Milestone I: Petrochemical Integration

Key Milestone II:

Diversification to Energy

Key Milestone III: Unlocking diversified growth engines to power next wave of transformation

  • Barito Pacific established

    1979

  • Barito Pacific

    go public

    1993

  • Chandra Asri and Tri Polyta merger

  • SCG Chemicals Co. Ltd acquired 30.0% stakes on Chandra Asri

    2011

    2021

  • Chandra Asri successfully completes Rights Issue, Thai Oil as strategic partner on CAP2 project (15%)

  • BREN IPO

  • Acquisition of wind portfolio

  • Acquisition of power plant under Chandra Daya Investasi

    2023

  • Completed acquisition of SECP - change to Aster Chemical Park

  • Subsequent Acquisition of PE High density plant from Chevron in Bukom

  • CDI IPO

    2025

    2007

    2008

    • Acquired 70,0% PT Chandra Asri and subsidiary, PT Styrindo Mono Indonesia

    • Acquired 77,93% PT Tri Polyta Indonesia Tbk

      2018

    • Barito Pacific acquired Star Energy

    • Signed conditional PPA with PLN for Jawa 9 & 10 (2 x 1,000MW)

      2022

    • Establishment of Barito Renewables (BREN)

    • Green Consolidation through acquisition of additional stakes on WW, Salak, and Darajat

      2024

      • Chandra Asri Changed its name to Chandra Asri Pacific with two key pillars, chemical & Infrastructure

      • Solidifying position in infra thru Chandra Daya Investasi (CDI)

P A G E 5



01

Group Overview

Group Structure

Listed on the IDX since 1993, Barito Pacific has a market capitalization of c.US$13.4b as of Sep 2025

Barito Pacific's largest shareholder is Prajogo Pangestu

with a 71.36% stake as of Sep 2025

Rating Pefindo: idA+ (Stable)

Chemical & Infrastructure Energy Property

38.55% (1)

Mkt. Cap of c.US38bn as at Sep, 2025

  • Indonesia's largest and only integrated petrochemical company. Operates a world scale naphtha cracker.

  • Rating Pefindo: idAA- (Stable)

64.7%

Mkt. Cap of c.US57bn as of Sep,2025

100% 100%

34%

  • 2,000 MW ultra supercritical coal-fired power project

  • Consortium with PLN and KEPCO

    100%

    • Office complex (Wisma Barito Pacific 1 and 2) in Jakarta

    • Operator of Integrated industrial park: 60 ha

    • Mambruk Anyer Resort

    • Patimban Industrial estate: 600 ha

      80%

      60% 45%

      Barito Wind Energy

      Chemical & Refinery

      Infrastructure solution

      JV

      Michellin

    • One of the largest operators in Indonesia and in the world.

    • 910 MW installed capacity

    • Ratings (M/F):

      • SEG Wayang Windu: Ba3/BB-

100% 51%

  1. As at 18 Sep 2025 Direct 34.63% and indirect 3.9%

    • SEG Salak & Darajat: Baa3/BBB- Sidrap I Sukabumi Sidrap II Lombok



P A G E 6



01

Group Overview Barito Pacific Core Portfolio






Diversified & Integrated Chemical and Energy Player

  1. Chemical & Infrastructure

  2. Energy

  3. Property



Integrated Petrochemical complex

4.2Mtpa Capacity

  • Strategic Vital National Object



Chemical

Aster Chemicals & Energy (ACE) Pte ltd

  • Located in P Bukom & Jurong in Singapore

  • Refinery 237 kbd crude processing

  • Ethelyne cracker: 1.1Mtpa

Geothermal Renewable Energy with 910.3MW capacity



Renewable

  • Baseload power



    Wind Power Farm 78.75MW capacity

  • The 1st wind farm in Indonesia

    • Office tower in CBD area of Jakarta



      Office

    • Designed with Green Concept



      Residential

    • Exclusive residential with six cluster

      • +/-50ha of a land plot in

      Western Jakarta

    • Soft launch in 2024



      Energy

      Renewables capacity 989MW

      • 110ha in Western Jakarta



        Industrial

      • 600ha JV in Patimban

      • 120MW CCPP, solar rooftops



        Infrastructure

        Water Solution

      • 4,045lps



        Storage

      • Jetty & Tank service for chemical and refined petroleum



      • 5 jetties: 166,000 DWT

        Logistics

      • 5 vessels under operation

      • To own 15 vessels in the future

2 x 1,000MW USC Coal-Fired Power Plant



Power Plant

  • Ultra Supercritical Coal-Fired power project developed under a BOOT scheme

  • COD in April 2025

  • Designed as a one-stop solution

    for industries and business to operate seamlessly with a clean and green environment



    Hospitality

  • Located in the popular holiday destination with 2 hour driving distance from Jakarta

  • 153 bedrooms at +/- 7ha landscape

02



Business Overview


P A G E 8



02

Business Overview Chemical & Infrastructure

Vision: "Southeast Asia's leading energy, chemicals and infrastructure solutions company"



Energy

Fuel Retailer

All Esso-branded Fuel Stations

across Singapore

Target Completion end 2025 subject to regulatory approval

Condensate Splitter Unit (CSU)

Capacity: 70 KBD

Product capacity: 2.5 MTPA

Being Rejuvenated COD 2026

Bukom Refinery

Capacity: 237 KBD

Product capacity: 8.5 MTPA1

Chemicals

Chlor-Alkali (CA) & Ethylene

Dichloride (EDC) Unit

Capacity: 0.9 MTPA

Under Construction COD 2027

Downstream Chemical Complex2

Capacity: 4.7 MTPA

Ethylene Cracking Complex

(incl. Cilegon)

Cracker Capacity: 2 MTPA Other Products: 2.5 MTPA

Infrastructure

Logistics

11 gas and chemical vessels

including 2 under construction

15 subsea pipelines with 7

pipelines to external terminals

~200 trucks portfolio

Port & Storage

~ 5 Mn m3 tank storage 16 jetties in total,

13 wharves and 1 single-buoy

mooring

Water

4,874 litres per second water

treatment plants

2,800 litres per second river water source

5.4 Mn m3 reservoir 10 special water treatment facilities

Power

~500 MW combined cycle power

plant portfolio

~20 MWp Solar in Indonesia + Singapore

Mission: Creating value and fostering partnerships for a sustainable future

02 Business Overview

Chemical - Indonesia Operation

9 10

11

P A G E 9

12

  1. Chandra Asri PP Plant

  2. Chandra Asri OPE Plant

  3. Nippon Shokubai Indonesia

  4. Asahimas Chemical

  5. Pelindo II Port

  6. Krakatau Bandar Samudera Port

  7. Cabot Indonesia

  8. Lotte Chemical Titan

  9. Indonesia Power (PLTU Suralaya)

    • Adjacent and interlinked with customers' facilities

    • Located 123 km northwest of Jakarta

    • Considered among Indonesia's Vital Assets

    Pipeline

    Public Road

    8

    16 17

    MERAK

    7

    13

    14

    45 km

    Coverage Area of Our Ethylene pipeline

  10. Sulfindo Adiusaha

  11. SMI Plant

  12. Redeco Petrolin Utama

  13. Gajah Tunggal

  14. Polychem Indonesia

  15. Arbe Styrindo

  16. Krakatau Chandra Energi

  17. CA-EDC (Coming Soon)

YOUR GROWTH PARTNER

Toll Road

Jetty

6

5

4

1

2 3

ANYER



Attention: This is an excerpt of the original content. To continue reading it, access the original document here.