Press Release May 22 2026
Filed with NSE · · 4 pages · English
Summary by 6ix AI
Fujiyama Power Systems Limited has announced the commissioning of a new solar cell manufacturing facility in Ratlam, Madhya Pradesh, as detailed in their press release. Chairman Pawan Kumar Garg emphasized that this expansion will enhance cost control and ensure the availability of compliant solar cells. The project is part of the company's strategy to strengthen its manufacturing capabilities and is expected to commence operations in the near future.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Fujiyama Power Systems Limited on 6ix
Earlier from Fujiyama Power Systems
- Press Release (Revised) May 15 2026
- Press Release May 15 2026 12: 10: 20
- Press Release May 15 2026 12: 06: 52
- Press Release May 14 2026
- Press Release May 14 2026 22: 20: 00
Later from Fujiyama Power Systems
- Fujiyama Power Systems Limited Press Release Aug 07 2026
- Press Release Aug 07 2026 19: 22: 10
- Fujiyama Power Systems Limited Press Release Aug 13 2026
- Press Release Aug 13 2026 21: 16: 45
- Fujiyama Power Systems Limited has informed the Exchange regarding a press release.
Follow Fujiyama Power Systems into a list and get an email when it puts out news.
Follow Fujiyama Power Systems