
Diamond Power Infrastructure Limited has informed the Exchange regarding a press release dated May 15, 2026, titled "Commissioning of 7th MV/EHV Cable Line Based on Continuous Catenary Vulcanisation (CCV) Technology at Vadodara Facility".
Filed with NSE · · 4 pages · English

Diamond Power Infrastructure Limited has informed the Exchange regarding a press release dated May 15, 2026, titled "Commissioning of 7th MV/EHV Cable Line Based on Continuous Catenary Vulcanisation (CCV) Technology at Vadodara Facility".
Diamond Power Infrastructure Limited on 6ix
Follow Diamond Power Infrastructure into a list and get an email when it puts out news.
Follow Diamond Power Infrastructure