Positive expansion study results progress Honeymoon to PFS
Filed with ASX · · 24 pages · English
• The Expansion Study was completed, based on results from past operations and indicates strong potential for a highly economic expanded operation. Key results are: -Low capital outlay required - US$7 million for plant re-start plus US$57 million for the expansion to 2Mlbs / annum -Steady state operating costs are ~US$24/lb U3O8 equivalent • The Study has provided the necessary confidence for the
Story so far
Earlier from Boss Energy
- Core assays positively confirm grades at Honeymoon
- Boss Honeymoon uranium study progresses to the next stage
- Boss field work and core sampling at Honeymoon underway
- Boss receives positive resin test results in expansion study
- BOE maiden resource of 5.2MLB U3O8 for jasons at Honeymoon
Later from Boss Energy
- Response to ASX Price Query
- Honeymoon drill program to commence in november
- BOE: PFS commences for Honeymoon uranium project
- ANZ: Opes Prime Disclosure
- Drilling commences at Jasons Deposit
Follow Boss Energy into a list and get an email when it puts out news.
Follow Boss Energy