Platinum Group Metals Ltd.TSX: PTM

Corporate Presentation - February 2026

· Issued by Platinum Group Metals Ltd.
WATERBERG PGM PROJECT

Large-scale, low-cost PGM mine development in South Africa

CORPORATE PRESENTATION - FEBRUARY 2026

NYSE.A PLG • TSX PTM







Platinum Group Metals Ltd.

is the majority owner and operator of the

Waterberg PGM Project in South Africa

Listed

NYSE American (PLG) and TSX (PTM)

Headquarters Vancouver, BC, and Johannesburg, SA Cornerstone Shareholder (24%) Hosken Consolidated Investment Ltd. (HCI:JSE)

PLATINUM GROUP METALS LTD.

CORPORATE OVERVIEW



Updated Definitive Feasibility Study (DFS)

Located on the North Limb of the Bushveld Complex; home to 70% of global platinum production in 2025 Discovered in 2011 with US$92M invested to date in exploration and feasibility engineering

September 2024

Evaluating smelter offtake and funding options for project development

WATERBERG PGM PROJECT

LOCATION AND BACKGROUND



Measured and Indicated Resource

33.76M ounces

Palladium, Platinum, Gold and Rhodium (4E)

THICK

Amenable to bulk mechanized mining - safe with higher skilled work force

UNIQUE

40 m

Waterberg Deposit 13 story stopes

1.85 m

1.20 m

Merensky Reef

Conventional Thickness



Full suite of PGMs including strong gold, nickel and copper credits.

SHALLOW DESIRABLE

Deposit starts 140m from surface - allows for potential multi decline ramp access -lower capital costs compared to deep vertical shafts

Low chrome concentrate with high-sulphide content amenable to existing smelters

WATERBERG PGM PROJECT

WHY WATERBERG?





Platinum Group is the operator and majority 50.395% owner via a direct 37.425% interest and an indirect 12.97% interest via BEE partner Mnombo



Implats is a leading producer of PGMs and owns a 14.625% interest in the Waterberg Project along with a right of first refusal for concentrate offtake

PLATINUM GROUP

PLATINUM GROUP

37.05%

15%



37.425%

50.395%

13.03%

26.0%

MNOMBO WETHU CONSULTANTS

HJ Platinum Metals Co. Ltd. is a Japanese special purpose

corporation owning a 21.95% project interest and funded 75% by JOGMEC and 25% by Hanwa:

14.625%

IMPLATS

(BEE partner)





Japan Organization for Metals and Energy Security (JOGMEC) State owned entity

Hanwa Co., a diversified Japanese trading company, also owns metal marketing rights

21.95%

HJ PLATINUM METALS LTD.

WATERBERG PGM PROJECT

OWNERSHIP



Growth in Hybrid Market Offsetting PGM Demand Loss From Battery Electric Vehicles (BEV)

Global vehicles sales forecast and EV/ICE split

PGM autocatalyst demand to grow through 2027, despite increasing EV sales



Source: IEA, Bloomberg, Nedbank CIB Markets Research Source: Bloomberg, Johnson Matthey, Nedbank CIB Markets Research

PGM MARKETS

PGM AUTO DEMAND



Southern Africa PGM Reserves and Supply in Terminal Decline

Merensky and UG2 reserves in a decline; Northern Limb holding the fort

Number of operating shafts are in a decline;

SA PGM industry's shaft count



Source: Company reports, Nedbank CIB Markets Research Source: Company reports, Nedbank CIB Markets Research

PGM MARKETS

PGM MINE SUPPLY





Pt | Platinum

6.72m ounces



Au | Gold

1.44m ounces



Cu | Copper

429M lbs

Pd | Palladium

14.90m ounces



Rh | Rhodium

343k ounces

Ni | Nickel

933M lbs



WATERBERG PGM PROJECT

COMMODITY Leverage



WATERBERG PGM PROJECT

ORE BODY



WATERBERG PGM PROJECT



ORE BODY

F-ZONE T-ZONE



Reserve Tonnes

226 MT

Reserve Grade

2.68 g/t 4E

Thickness

2.4m to 118m

64.0%

Palladium

28.8%

Platinum

21.03M

OUNCES 4E

1.4%

Rhodium

Base Metals

Cu 0.07%, Ni 0.18%

4.9%

Gold

Reserve Tonnes

19 MT

Reserve Grade

3.84 g/t 4E

Thickness

2.4m to 20m

51.4%

Palladium

29.0%

Platinum

2.37M

OUNCES 4E

0.8%

Rhodium

Base Metals

Cu 0.14%, Ni 0.07%

18.8%

Gold









WATERBERG PGM PROJECT

PLAN VIEW



$6.50 billion LOM Post Tax Cashflow

23.41 million

Ounces 4E Proven and Probable Reserves

353,208 Ounces Annual Steady State Production (4E)

$658/4E

Ounce on Site LOM Average Cash Cost

$569M

Post Tax

NPV8

$776M

Estimated Peak Project Capital

14.20%

IRR Post Tax

54 Years

Mine Life Based on Reserves

BASE CASE CONSENSUS PRICES (USD)

Pt | Platinum

Pd | Palladium

Au | Gold

Rh | Rhodium

Cu | Copper

Ni | Nickel

USD/ZAR

$1,605/oz

$1,062/oz

$1,812/oz

$6,209/oz

$4.53/lb

$9.73/lb

20.07

WATERBERG PGM PROJECT

2024 DFS UPDATE - Base Case





Base Case

(2024 Consensus)

Bullish

(Metal Prices Up 20%)

BASKET PRICE (4E)

$1,325/oz

$1,590/oz

POST TAX NPV8%

$569 million

$1.088 billion

POST TAX IRR

14.2%

19.0%

LOM AISC

$761/4E oz

$786/4E oz

PAYBACK

5.8 Years

4.3 Years

LOM POST TAX CASHFLOW

$6,500 million

$9,627 million

PEAK FUNDING

$776 million

$771 million

OPERATING MARGIN

50%

57%

January 2026 - Spot Prices

Basket Price $2290/oz 4E

+72%

Pt | Platinum

$2,400/oz

+50%

Pd | Palladium

$1,800/oz

+70%

Au | Gold

$4,500/oz

+150%

Rh | Rhodium

$9,500/oz

+53%

Cu | Copper

$6.00/lb

+32%

Ni | Nickel

$8.00/lb

-17%

USD/ZAR 16.50

WATERBERG PGM PROJECT

2024 DFS UPDATE Price Deck and Sensitivities



$6.50B USD Cash Flow Over a Fifty-Four Year Life of Mine

800 9,000

6,750

4,500

2,250

0

(2,250)

(4,500)



600

Cumulative Cashflow (USD mil Real)

400

Net Cashflow (USD mil Real)

200

0

( 200)

(2,250)

(200)

( 400)

(4,500)

(400)

( 600)

(600)

(6,750)

Y1 Y3 Y5 Y7 Y9 Y11 Y13 Y15 Y17 Y19 Y21 Y23 Y25 Y27 Y29 Y31 Y33 Y35 Y37 Y39 Y41 Y43 Y45 Y47 Y49 Y51 Y53 Y55 Y57

(6,750)

Gross Revenue 4E

Sustaining CapEx Pipeline Financing Costs

Base Metal Credits

Working Capital Incremental Cashflow

Realisation Costs

Royalties

Cumulative Cashflow

OpEx

Tax

Project CapEx

Indirects



WATERBERG PGM PROJECT

2024 DFS UPDATE Economics

Average Annual Steady State Production of 353,208 Ounces 4E at 2.96 g/t 4E Reserve Grade

500 4.00



450 3.60

400 3.20

Metal Recovered (koz)

350 2.80

4E Head Grade (g/t)

300 2.40

250 2.00

200 1.60

150 1.20

100 0.80

50 0.40

0

Y4 Y8 Y12 Y16 Y20 Y24 Y28 Y32 Y36 Y40 Y44 Y48 Y52 Y56 Y60

0.00

Recovered Pt Recovered Pd Recovered Au Recovered Rh Average 4E Grade



WATERBERG PGM PROJECT

2024 DFS UPDATE Economics



Simplified Mine Plan Focused on Thick Central F Zone Utilizing Long Hole Open Stoping



LONGHOLE DRILLING AND BLASTING

STOPE

BLASTED ORE

UNDERCUT

DRAWPOINT TRANSPORT DRIFT

LOADING CROSSCUT

WATERBERG PGM PROJECT

2024 DFS UPDATE Mining

South African PGM Mine & Project Average Deposit Depths

WATERBERG

Metres below surface (mbs)

0

2.96

Metres

4E grade (g/t)

500

1,000

1,500

Waterberg project

2,000

Waterberg Other shafts

Orebody thickness Resource grade, rhs

2,500

4E oz Production Per Worker

WATERBERG

Q1 Q2 Q3 Q4

Global PGM Cost Curve (September 2024)

450

400

350

300

4E oz/worker

250

200

150

100

50

0

Source: SFA Oxford

Western Limb Eastern Limb Northern Limb Great Dyke

4E production

2,500

2,000

USD/4E oz

1,500

1,000

500

0

Q1 Q2 Q3 Q4

WATERBERG

steady-state

SIB/4E oz

NTCC/

4E oz

4E Production

NYSE.A PLG • TSX PTM 18

Western Limb Eastern Limb Northern Limb Zimbabwe North America

18

WATERBERG PGM PROJECT

WATERBERG Advantage: Thickness, Depth, Productivity and Cost



4.47

40.00

4.61

10

3.86

4.25

30

5

4

3

20

19.00

0

7.50

1.33

1.80

2.06

0.90

1.40

1

0

WATERBERG

T Zone F Zone

#1

Platreef

#1

#2

#1

UG2

#2 #3

Merensky

4.01 3.97

2

PGM Orebody Thickness and Grade

50

5.19

6

40





Near Term Options Focused on Infrastructure and Staged Development



US$21m pre-construction budget was approved in principle by Waterberg JV Co. shareholders in September 2022.

September 2022 to August 2024

US$9.1m (R45.0m)

  • Completed

  • Definitive Feasibility Study (DFS) Update.

  • Infill and exploration drilling, engineering, permitting, community, social & labour plan.

Option B | Staged Development

Option C | Full Construction



Option A | Early Infrastructure

± US$11.9m (R220.0m)



Social & labour plan, community, power, water, roads, fencing, and accommodations.

Infrastructure, decline development, sub-level development, milling and flotation plant to reduce execution risk prior to a full construction decision.

Formal construction decision with a binding offtake agreement. Financing package consisting of partner equity, project debt and possible metal stream.

WATERBERG PGM PROJECT

PRE-CONSTRUCTION INVESTMENT



Dual Track Process for Concentrate Offtake



Platinum Group and Waterberg JV Co.

are assessing commercial alternatives

for concentrate offtake and beneficiation.

Third Party

Concentrate Offtake

OPTION A

South African Offtakers

OPTION B

Cooperation Agreement with Saudi based Ajlan and Bros.

Affiliated Operation Concentrate Offtake

WATERBERG PGM PROJECT

BENEFICIATION Strategy

NYSE.A PLG • TSX PTM