Toro Energy LimitedASX: TOE

Pilot Plant for Wiluna Uranium Project Development

· Issued by Toro Energy Limited

Filed with ASX · · 4 pages · English

Summary by 6ix AI

Toro Energy Limited has announced the development of a pilot plant for the Wiluna Uranium Project, aimed at testing potential ore from various deposits. The design phase of the pilot plant is on track, with operations expected to begin in the second half of the year. The plant will conduct tests on both beneficiation and hydrometallurgical circuits using bulk ore samples from the Lake Maitland, Lake Way, and Centipede-Millipede deposits. This initiative is part of Toro's strategy to advance the project towards production amid a strengthening uranium market.

Written by 6ix AI from the company’s filing. How 6ix writes summaries

Toro Energy Limited on 6ix

Story so far

Earlier from Toro Energy

Later from Toro Energy

All Toro Energy news releases