Phase 2 Drilling Commenced at Yandal West Gold Project
Filed with ASX · · 4 pages · English
• Drilling is following up results from maiden drilling at May Queen that include: 24m @ 1.51 g/t gold (including 4m @ 5.68 g/t gold & 4m @ 2.63 g/t gold) 20m @ 1.63 g/t gold (including 4m @ 6.19 g/t gold & 4m @ 2.8 g/t gold) 12m @ 1.17 g/t gold (including 4m @ 4.07 g/t gold) 12m @ 1.24 g/t gold (including 4m @ 3.43 g/t gold) 12m @ 0.57 g/t gold (including 4m @ 1.24 g/t gold) • Approximately 3,000
Great Western Exploration Limited on 6ix
Story so far
Earlier from Great Western Exploration
- $2 million Placement to Expand Drilling at Yandal West
- Greenfields Gold Discovery at Yandal West Project
- Chisel Prospectivity Enhanced Following Gravity Survey
- Yandal West Gold Project - RC Drilling Progress Report
- Gravity Survey Commenced at Chisel RE-RELEASE
Later from Great Western Exploration
- Yandal West Gold Project Drilling Update
- Further Strong Results and High-Grade Gold at Yandal West
- Drilling Resumes at Yandal West Gold Project
- Drilling Planned for Large Base Metal Target at Chisel
- Drilling Commenced at Chisel Base Metal Prospect
Follow Great Western Exploration into a list and get an email when it puts out news.
Follow Great Western Exploration