Dynamic Metals Ltd. has released a press release.
Nickel Exploration Update
Filed with ASX ·
6ix hasn’t read this filing yet.
Earlier from Dynamic Metals
- Dynamic Metals defines 2.8km lithium anomaly at Widgiemooltha
- 2.8KM lithium anomaly defined at pioneer dome
- WMG: WMG Consolidates Entire Mulga Tank Complex
- Dynamic Metals boosts Lake Percy nickel sulphide potential
- PGE Assays Support Strong Nickel Results at Lake Percy
Later from Dynamic Metals
- Dynamic Metals says D5 is high-priority drill target
- Positive Lithium Auger Results at Pioneer Dome
- Dynamic Metals talks positive lithium results at Pioneer Dome
- Phase 2 Nickel Drilling Complete at Lake Percy
- Maiden soil assays up to 409PPM Li20 at spargos east
Follow Dynamic Metals into a list and get an email when it puts out news.
Follow Dynamic Metals