Cullinan Metals CorpCSE: CMT

NewWest Gold Corporation reports multiple high grade intercepts at Sandman Project

· Issued by Cullinan Metals Corp via CNW
LAKEWOOD, CO, Oct. 16 /CNW/ - NewWest Gold Corporation (TSX:NWG)
("NewWest") today announced results from its Phase One drilling program at its
Sandman Project (Sandman), located in Humboldt County Nevada.
The Phase One program included 75 reverse circulation (RC) holes designed
to expand and test shallow and deep targets at the known mineralized zones of
Southeast Pediment, Silica Ridge and North Hill. NewWest also completed nine
RC holes to test three district targets at Abel Knoll, Windmill and Sandbowl
as part of the Phase One program. In total, 84 holes were completed, exceeding
27,000 feet. The drilling continued to produce high-grade intercepts
associated with known mineralization, including angle-hole NH06-66 at North
Hill which intercepted 5 feet at 3.956 oz Au/ton (within 40 feet of continuous
gold mineralization between 10 and 50 feet with an average grade of 1.092 oz
Au/ton), vertical hole SR06-100 at Silica Ridge which encountered 5 feet at
1.167 oz Au/ton (within 75 feet of continuous gold mineralization from 135 to
210 feet with an average grade of 0.236 oz Au/ton), and vertical hole AK06-2
at Abel Knoll which encountered 5 feet at 1.559 oz Au/ton (within 420 feet of
continuous gold mineralization with an average gold grade of 0.087 oz Au/ton
between 245 and 665 feet).
"We are excited by these drilling results," said Steve Alfers, President
and Chief Executive Officer. "We verified newly discovered zones of
mineralization at Southeast Pediment with excellent grades and thicknesses and
have expanded mineralization at Silica Ridge and North Hill, both laterally
and at depth. Our new discovery of high-grade gold mineralization at Abel
Knoll is especially exciting and demonstrates the potential of our district
exploration program."

<<
               Table 1: Phase 1 Drill Program Summary
-------------------------------------------------------------------------
     Location       No. of   Total Footage
                     Holes      (feet)         Status After Phase 1
-------------------------------------------------------------------------
Abel Knoll               2           1,015  Discovered new, continuous
                                             mineralized zone
-------------------------------------------------------------------------
Southeast Pediment       2           1,230  Identified multiple
                                             mineralized zones at depth
-------------------------------------------------------------------------
Silica Ridge            38          12,685  Expanded known mineralization
                                             laterally and at depth
-------------------------------------------------------------------------
North Hill              33           8.320  Extended continuous
                                             mineralization
-------------------------------------------------------------------------
Sandbowl                 5           1,760  Identified new mineralization
-------------------------------------------------------------------------
Windmill                 1             400  Identified new mineralization
-------------------------------------------------------------------------
>>

Complete Phase One results and a map of the drill-hole locations are
available on NewWest's website at www.newwestgold.com. Selected assay results
are presented below. All reported drill intervals are believed to be close to
true width except as noted in the text. Intervals are averages of fire assay
gold values using a cut-off grade of approximately 0.010 oz Au/ton. NewWest's
Phase Two program is underway and is designed to include an additional 100
holes with an estimated budget of approximately US$1.2 million.

ABEL KNOLL

Two exploration holes drilled at the Abel Knoll geochemical anomaly,
located approximately three miles southeast of Southeast Pediment, identified
a new zone of mineralization. Vertical hole AK06-2 encountered 420 feet of
continuous gold mineralization with an average gold grade of 0.087 oz Au/ton
between 245 and 665 feet. The zone includes 25 feet with an average gold grade
of 0.397 oz Au/ton between 350 and 375 feet with a high five-foot value of
1.227 oz Au/ton, and 100 feet with an average grade of 0.192 oz Au/ton between
535 and 635 feet with a high five-foot value of 1.559 oz Au/ton. The width of
the mineralized zone is unknown. The top 390 feet of the zone is oxidized
based on a high abundance of pervasive limonite minerals. Selected Phase One
drill results for Abel Knoll are as follows:

<<
       TABLE 2: Selected Phase One Drilling Results: Abel Knoll
-------------------------------------------------------------------------
Drill Hole   Depth   From     To    Intercept   Gold Grade  High 5' Gold
             (feet) (feet)  (feet)    (feet)     oz Au/ton    oz Au/ton
-------------------------------------------------------------------------
    AK06-1     350    210     225          15        0.015         0.019
                      235     240           5        0.010         0.010
-------------------------------------------------------------------------
    AK06-2     665    245     665         420        0.087         1.559
-------------------------------------------------------------------------
>>

SOUTHEAST PEDIMENT

Two angle RC holes were drilled at Southeast Pediment to explore for and
help define newly discovered mineralization below the Southeast Pediment fault
zone. Hole SEP06-93 encountered two new zones of mineralization beneath the
known shallow mineralization, one zone of 50 feet of continuous mineralization
with an average grade of 0.070 oz Au/ton between 465 and 515 feet, and a
second zone of 45 feet of continuous mineralization with an average grade of
0.120 oz Au/ton between 605 and 650 feet. Hole SEP06-92 limits mineralization
to the south, but the zone remains open to the north. Selected Phase One drill
results for Southeast Pediment are as follows:

<<
   TABLE 3: Selected Phase One Drilling Results: Southeast Pediment
-------------------------------------------------------------------------
Drill Hole    Depth    From      To    Width    Gold Grade  High 5' Gold
              (feet)  (feet)   (feet)  (feet)    oz Au/ton    oz Au/ton
-------------------------------------------------------------------------
  SEP06-92      580                             (less than)
                                                     0.010
-------------------------------------------------------------------------
  SEP06-93      650     115      140      25         0.013         0.020
                        465      515      50         0.070         0.188
                        605      650      45         0.120         0.266
-------------------------------------------------------------------------
>>

SILICA RIDGE

Thirty-eight vertical and angle RC holes significantly increased the size
of mineralized zones along five structural controls and added continuity to
the zones. The zones remain open to the north and south. Vertical hole   
SR06-100 encountered 75 feet of continuous gold mineralization from 135 to
210 feet with an average grade of 0.236 oz Au/ton, including a five-foot
intercept of 1.167 oz Au/ton. Mineralization appears to be oxidized and
metallurgical analysis is ongoing. NewWest's plan for Phase Two includes 40 RC
holes to further test the Silica Ridge fault and the under-explored north end
of the Silica Ridge mineralization. Selected Phase One drill results for
Silica Ridge are as follows (width given for SR06-129 is the partial down-dip
length):

<<
     TABLE 4: Selected Phase One Drilling Results: Silica Ridge
-------------------------------------------------------------------------
Drill Hole    Depth    From      To    Width    Gold Grade  High 5' Gold
              (feet)  (feet)   (feet)  (feet)    oz Au/ton    oz Au/ton
-------------------------------------------------------------------------
   SR06-92      220      10       20      10         0.015         0.017
                         85       95      10         0.011         0.011
                        130      165      35         0.030         0.059
-------------------------------------------------------------------------
   SR06-93      350       0        5       5         0.027         0.027
                         15       25      10         0.018         0.020
                         65       85      20         0.011         0.013
                         95      120      25         0.019         0.031
-------------------------------------------------------------------------
  SR06-100      360      15       25      10         0.013         0.016
                        135      210      75         0.236         1.167
                        320      360      40         0.169         0.686
-------------------------------------------------------------------------
  SR06-101      425     265      425     160         0.042         0.143
-------------------------------------------------------------------------
  SR06-102      380     235      265      30         0.026         0.064
                        285      320      35         0.063         0.217
                        335      345      10         0.029         0.043
-------------------------------------------------------------------------
  SR06-106      150       5       20      15         0.028         0.045
                         30       50      20         0.023         0.057
                         60       95      35         0.050         0.145
-------------------------------------------------------------------------
  SR06-113      450       0       60      60         0.065         0.226
                        195      215      20         0.039         0.070
                        265      275      10         0.017         0.017
-------------------------------------------------------------------------
  SR06-118      290      65       80      15         0.064         0.111
                         90      105      15         0.072         0.153
-------------------------------------------------------------------------
  SR06-129      500     170      265      95         0.033         0.163
                        275      445     170         0.019         0.053
-------------------------------------------------------------------------
>>

NORTH HILL

Thirty-three step-out holes drilled in the Northwest Zone at North Hill
significantly increased the size of the zone and encountered higher grades and
thicknesses than in previous drilling. Angle-hole NH06-66 intercepted 40 feet
of continuous gold mineralization between 10 and 50 feet with an average grade
of 1.092 oz Au/ton, including a five-foot high intercept grading 3.956 oz
Au/ton. The drilling extends the mineralized zone to a length of approximately
900 feet, and the zone remains generally open in all directions. The
mineralization appears to be oxidized and metallurgical analysis is ongoing.
NewWest plans to drill 30 holes, for a total of approximately 7,500 feet, in
the Phase Two program at North Hill. This program will include step-out
drilling to establish the dimensions of the mineralized zone. Selected Phase
One drill results for North Hill are as follows:

<<
       TABLE 5: Selected Phase One Drilling Results: North Hill
-------------------------------------------------------------------------
Drill Hole    Depth    From      To    Width    Gold Grade  High 5' Gold
              (feet)  (feet)   (feet)  (feet)    oz Au/ton    oz Au/ton
-------------------------------------------------------------------------
   NH06-49      270                             (less than)
                                                     0.010
-------------------------------------------------------------------------
   NH06-50      250     175      225      50         0.175         0.566
-------------------------------------------------------------------------
   NH06-52      340      20       30      10         0.013         0.013
                        150      200      50         0.030         0.108
                        210      230      20         0.049         0.131
-------------------------------------------------------------------------
   NH06-53      320     145      160      15         0.022         0.024
                        180      200      20         0.044         0.084
                        220      245      25         0.148         0.467
                        255      265      10         0.020         0.026
-------------------------------------------------------------------------
   NH06-54      280      90      120      30         0.019         0.031
                        120      155      35         0.096         0.207
                        185      195      10         0.062         0.103
-------------------------------------------------------------------------
   NH06-56      240      50      100      50         0.066         0.423
                        110      115       5         0.024         0.024
-------------------------------------------------------------------------
   NH06-58      320      85      115      30         0.065         0.222
                        120      135      15         0.037         0.076
                        140      145       5         0.026         0.026
                        175      195      20         0.040         0.056
                        220      235      15         0.016         0.027
-------------------------------------------------------------------------
   NH06-63      280      45       65      20         0.100         0.179
                         90       95       5         0.042         0.042
                        115      120       5         0.035         0.035
                        165      195      30         0.019         0.024
                        245      280      35         0.019         0.061
-------------------------------------------------------------------------
   NH06-66      160      10       50      40         1.092         3.956
                         95      105      10         0.016         0.018
-------------------------------------------------------------------------
   NH06-77      300      25       50      25         0.029         0.085
                         75       80       5         0.034         0.034
                        100      120      20         0.060         0.128
-------------------------------------------------------------------------
   NH06-81      200      10       15       5         0.012         0.012
                         30       35       5         0.013         0.013
                        110      165      55         0.068         0.213
-------------------------------------------------------------------------
   NH06-82      190      60       65       5         0.020         0.020
                        130      165      35         0.081         0.233
-------------------------------------------------------------------------
   NH06-85      230      70       75       5         0.011         0.011
                        110      150      40         0.047         0.209
                        160      195      35         0.023         0.068
-------------------------------------------------------------------------
   NH06-86      140      25       45      20         0.086         0.160
                         70      110      40         0.014         0.021
-------------------------------------------------------------------------
>>

DISTRICT EXPLORATION

Phase One drilling of district targets Sandbowl and Windmill also
identified additional mineralization. At Sandbowl, which is approximately
2,000 feet west-southwest from North Hill, five exploration holes with a total
footage of 1,760 feet were drilled. Three of the holes, NH06-60, NH06-75, and
NH06-76, resulted in the discovery of the Sandbowl mineralized zone. Strongly
anomalous gold mineralization was also encountered in angle hole WM06-1 at the
Windmill Anomaly, which is located between Southeast Pediment and Silica
Ridge. Additional step-out drilling at both Sandbowl and Windmill are planned
for Phase Two.

Qualified Person

All drill samples were collected following standard industry practice and
were assayed by American Assay Laboratories, Inc. of Sparks, Nevada. Gold
results were determined using standard fire assay techniques on a 30 gram
sample with an atomic absorption finish. QA/QC included the insertion of
numerous standards and blanks into the sample stream. Michael Gustin, Ph.D.,
of Mine Development Associates, Reno, Nevada, is NewWest's qualified person as
defined by NI43-101 and has reviewed and approved this news release.

Forward-Looking Statements

Information in this news release that is not current or historical
factual information may constitute forward-looking information within the
meaning of securities laws. Implicit in this information, particularly in
respect of future operating results, economic performance, potential
mineralization and resources, exploration results and further plans and
objectives are forward looking statements that involve various risks and
uncertainties which, although considered reasonable by NewWest at the time of
preparation, may prove to be incorrect. Readers are cautioned that there can
be no assurance that such statements will prove to be accurate and actual
results and future events could differ materially from those anticipated in
such statements.