New lithium intercepts confirm resource upside at KV
Filed with ASX · · 32 pages · English
New assay results largely located outside the conceptual open pits outlined by recent Scoping Study as new 16-20,000m drill program makes rapid progress HIGHLIGHTS • Multiple stacked, spodumene-bearing pegmatites intersected in recent drilling up to 300m beyond the current conceptual open pits, with the mineralised trend remaining open. • Up to 60m cumulative thickness of lithium-mineralised pegma
Story so far
Earlier from Liontown
- Liontown expands lithium footprint at Buldania
- Kathleen Valley metallurgical test work update
- Prospectus for Non-Renounceable Issue
- Landmark $7.9m capital raising to fund WA lithium projects
- Further high grade assays from Kathleen Valley
Later from Liontown
- Notification of Entitlement Offer Shortfall
- New thick, high-grade lithium intercepts at Kathleen Valley
- More thick, high-grade lithium zones intersected at KV
- Clarification of Statements
- Drilling extends thick high-grade zone at Kathleen Valley
Follow Liontown into a list and get an email when it puts out news.
Follow Liontown