New Drilling Program to Commence at Yidby Gold Project
Filed with ASX · · 13 pages · English
• Up to 6,000m of RC drilling planned to define and extend the Yidby Road gold mineralisation, that produced the following previously announced (30 November 2020 and 15 December 2020)significant intersections: YBRC007 56m @ 1.97 g/t Au from 44m including 4m @ 14.47 g/t Au YBRC008 40m @ 3.01 g/t Au from 24m including 4m @ 26.57 g/t Au YBRC006 36m @ 1.51 g/t Au from 32m including 5m @ 5.86 g/t Au YB
Story so far
Earlier from Surefire Resources NL
- Further Exceptional Gold Results from Yidby Gold Project
- Spectacular Results from Yidby Gold Project WA
- Perenjori Tenement Granted
- Quarterly Cashflow Report - Revised
- Yidby Gold Project Maiden Drilling Program Completed
Later from Surefire Resources NL
- Yidby Gold Project Exploration Update
- Perenjori WA 100% Iron Ore Project Reviewed
- Perenjori Iron Ore Project Reviewed with JORC Tables
- Yidby Road Gold Project Drilling Program Commenced
- Yidby Road Gold Project Second Rig On Site
Follow Surefire Resources NL into a list and get an email when it puts out news.
Follow Surefire Resources NL