MONTREAL, June 6 /CNW Telbec/ - SEMAFO (TSX - SMF) is pleased to announce
a second series of intersections from the on-going reverse circulation
delineation drilling program of its Nyafe gold deposit. This program is part
of the company's exploration programs instituted in January 2006 aimed at
expanding total mineral reserves and resources. The Nyafe deposit is part of
the fully-owned Mana gold mine project. The three best intersections returned
from these new series are all from section 5175N (see Table 1 below):

- Hole NRC 358 with 9 meters grading 12.31 g/t Au,
- Hole NRC 359 with 6 meters grading 21.87 g/t Au and
- Hole NRC 360 with 13 meters grading 8.42 g/t Au.

The first series of results from the current RC (reverse circulation)
drilling program were announced on May 9th, 2006. Due to the high level of
high grade intersections recovered to date, a decision was taken to extend the
program looking for extensions of the deposit. The Nyafe high grade gold
deposit, Semafo's original discovery in the country, is planned to supply
about 10% of the required feed at the Mana CIL (carbon-in-leach) gold recovery
mill. The mill is scheduled to be commissioned in Q-4 2007. The drilling
program will provide a more precise delineation of the geometry of the deposit
and improve the quality of mineral reserves estimates in preparation for the
pre-stripping and mining. The delineation targeted calls for vertical sections
spaced at a minimum 25 meter-interval and intersections spaced at 12.5 meters
on each section.
Table 1 below shows the second series of best intersections from the   
on-going program. It should be noted that, in line with past statistical
analysis of the Nyafe mineralization developed for the needs of the
feasibility study, all high assay values were cut down to 30 g/t Au. The
reported lengths are measured along holes and do not represent true widths.

<<
Table 1. - 2nd series of best intersections from the RC delineation
drilling program-Nyafe gold deposit

Sections    Hole no      From      To       Length    Cut grade
                           m        m          m        g/t Au
----------------------------------------------------------------------
4850N       NRC319        35       45         10        10,66
4950N       NRC327         7       11          4         9,21
4950N       NRC328        27       33          6        11,84
4900N       NRC323        42       48          6         7,24
4925N       NRC325        32       36          4         9,18
4975N       NRC329        13       19          6         3,44
4925N       NRC324         7       10          3        10,03
5000N       NRC331        39       45          6         6,00
5025N       NRC333         3        6          3         5,44
5025N       NRC335        30       33          3         7,81
5025N       NRC336        46       52          6         2,64
5050N       NRC339        18       23          5        13,23
5075N       NRC340         6        9          3        14,80
5075N       NRC341        32       37          5         5,27
5075N       NRC343        33       36          3         4,90
5100N       NRC344         0        6          6         4,60
5100N       NRC345        11       14          3         8,13
5100N       NRC346        28       33          5        11,10
5125N       NRC347         6        9          3         8,60
5125N       NRC348        12       18          6        15,01
5125N       NRC349        30       36          6        17,01
5125N       NRC350        47       52          5        13,32
5150N       NRC351         5        9          4         7,82
5150N       NRC352        12       18          6         6,27
5150N       NRC353        19       27          8         6,14
5150N       NRC353        30       34          4        16,58
5150N       NRC354        26       39         13         7,12
5150N       NRC355        36       46         10         9,53
5175N       NRC357        13       18          5        11,36
5175N       NRC358        19       28          9        12,31
5175N       NRC359        31       37          6        21,87
5175N       NRC360        29       42         13         8,42
5175N       NRC361        37       48         11         6,92
5200N       NRC365        26       36         10         7,81
>>

Complete final results will be used to revise and update the geological
model and the mineral resource and reserve estimates on the Nyafe deposit. An
update of the optimized pits will also be provided using current economic
conditions relative to the 2004 Feasibility Study.
All individual samples represent a one-meter length of RC drilling and
were sent for preparation and gold assaying at the ABILAB laboratories in
Bamako, Mali. Each sample was fire assayed for gold content on a 50-gram   
sub-sample at the same laboratory. An internal quality control and quality
insurance program, complementing ABILAB's own QA/QC (Quality Assurance /
Quality Control) program, using blind duplicates and recognized industry
standards, was in place throughout the program.
The exploration and drilling programs are designed and managed locally by
Dofinta Bonde, senior project geologist and reviewed and supervised under the
direction of Michel Cormier, geological engineer, Qualified Person and
Director of geology for Semafo. Mr. Cormier is responsible for the preparation
of this press release and has reviewed the data for its accuracy.

The common shares of Semafo are traded on The Toronto Stock Exchange
under the symbol "SMF".

FORWARD-LOOKING STATEMENTS

This press release contains "forward-looking statements", including, but
not limited to, the statements regarding the Company's expectations as to the
market price of gold, strategic plans, future commercial production,
production targets, timetables, mine operating costs, fixed assets expenses,
mineral reserve estimates and to the company's perspectives. Forward-looking
statements express, as at the date of this press release, our estimates,
forecasts, projections, expectations and beliefs as to future events or
results. Forward-looking statements are reasonable, but involve a number of
risks and uncertainties, and there can be no assurance that such statements
will prove to be accurate. Therefore, actual results and future events could
differ materially from those anticipated in such statements. Factors that
could cause results or events to differ materially from current expectations
expressed or implied by the forward-looking statements include, but are not
limited to, factors associated with fluctuations in the market price of
precious metals, mining industry risks, uncertainty as to calculation of
mineral reserves, risks related to the grade of reserves, risks related to
hedging strategies, risks of delays in construction and requirements of
additional financing.

 Semafo is a mining company whose mission is to explore, develop and
 mine major gold deposits in West Africa. Semafo currently operates
  the Kiniero mine in Guinea, the Samira Hill mine in Niger and
           is developing the Mana project in Burkina Faso

SEMAFO Inc on 6ix

Story so far

Earlier from SEMAFO

Later from SEMAFO

All SEMAFO news releases